← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / EN13

Policy EN13

Green and blue infrastructure

On pages 330 to 332 of the official PDF.

The human version

This policy supports proposals that protect and enhance existing green and blue infrastructure and create more. New developments must protect, manage, maintain and connect existing assets. Major housing and commercial developments must deliver or contribute to green and blue infrastructure projects in proportion to the development, with a site-specific strategy or plan showing connections beyond the site. Proposals should show a positive contribution to projects in existing Green Infrastructure Plans and the National Green Infrastructure Framework. Green and blue infrastructure for major developments should be managed, maintained and monitored for at least 25 years.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 330

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy EN13 – Green and blue infrastructure A. The Council will support proposals that protect and enhance existing, and create additional, green and blue infrastructure. B. New developments must ensure that existing green and blue infrastructure assets will be protected, managed and maintained, as well as connected to enhance their multi - functionality. C. All major housing and commercial developments will be expected to deliver and / or contribute to the green and blue infrastructure projects proportionate to development. Applications must be accompanied by a site-specific green and blue infrastructure strategy and /or plan to illustrate how green and blue infrastructure is integrated within the development proposal and how it seeks to improve connectivity to the Local Level Green Infrastructure network beyond the site boundary. D. In accordance with best practice principles, aims and objectives set out in the National Green Infrastructure Framework (Natural England, January 2023) (or subsequent updated documents), development proposals will need to demonstrate how they make a positive contribution to projects in existing Green Infrastructure Plans, or subsequent policy documents, or other projects that correspond to the components/principles identified within the National Green Infrastructure Framework. The green and blue infrastructure delivered within (or associated with) major new developments should be managed, maintained, and monitored for a minimum of 25 years. WNLP objectives: 2, 4, 5, 7, 13 13.16. Green infrastructure connections 13.16.1. The Sub-Regional corridors within West Northamptonshire, identified through the West Northamptonshire Green Infrastructure and Natural Capital Study, broadly follow strategic waterways, valleys and ridges, and are known as follows: 1. The Nene Valley (Newnham–Wellingborough) 2. Brackley–Towcester–Wellingborough Wooded Ridge 3. Cherwell Valley/Oxford Canal (Oxford–Banbury– Rugby–Coventry 4. Grand Union Canal (Milton Keynes – Northampton – Daventry – Leicester) 5. Northampton to Milton Keynes Link 6. Brampton Valley (Northampton – Market Harborough) 13.16.2. The Local GI corridors within West Northamptonshire are identified as follows: 1. Weedon Bec–Banbury 2. Newnham–Napton on the Hill 3. Middleton Cheney–Brackley–Buckingham 4. Newnham–Woodford Halse–Brackley 5. Great Oxendon–Rugby 6. Northampton–Daventry 7. Farthingstone–Towcester–Milton Keynes 8. Pitsford Water–Winwick 9. Daventry–Newnham 10. Silverstone–Buckingham 11. Buckingham–Milton Keynes 12. Wellingborough–Northampton 13. Sywell Reservoir–Broughton 14. Oxford Canal–Towcester 15. Banbury–Grand Union Canal 16. Banbury–Moreton Pinkney 17. Northampton–Olney 18. Welford Reservoir–Ravensthorpe Reservoir 13.16.3. In an urban context, green and blue infrastructure is a network of natural and semi-natural areas, such as parks, green roofs, street trees, and sustainable drainage systems, designed to provide ecosystem services that enhance urban environments. The ‘Accessible Greenspace Standard’ from Natural England clarifies the quantity, quality and location of the green infrastructure required to meet different local needs, such as a Doorstep Standard, Local Standard, a Neighbourhood Standard and other wider standards. Its focus is accessible natural green spaces for public access, providing contact with nature and contributing to nature recovery networks. For instance, the Doorstep Standard is an accessible greenspace standard to promote access to good quality green and blue space within 15 minutes’ walk from home. The Green Infrastructure Framework provides a Mapping Database7 with analysis of existing provision, including mapped representation of the areas thought to meet the size and proximity criteria. The People and Nature Survey published by Natural England found that 82% of adults agree that being in nature makes them very happy, but over one third of people in England do not have access to green space within this distance. 13.16.4. In early 2023 Natural England launched a major new tool to help towns and cities turn greener, the Green Infrastructure Framework8. The aim is to increase the amount of green cover to 40% in urban residential areas, and a commitment that the public in towns and cities should be able to access green space, such as woodlands, wetlands, parks and rivers, within a 15- minute walk from their home. 13.16.5. Green Ways are strategic access links between major settlements through open countryside, formed by the public rights of way network and cycle routes. Vulnerable users (pedestrians, cyclists and horse riders) should be considered in any planned Green and Blue Infrastructure work or planned off road connections. This would also support active travel. 13.16.6. Blue Ways are strategic access links between major settlements through open countryside along rivers, canals or navigations. These are formed by the ‘public rights of way’ network, canal towpaths, canals and navigations.
Infrastructure & utilitiesNature & environmentTransport & travel📍 Brackley📍 Daventry📍 Middleton Cheney📍 Northampton📍 Silverstone📍 Towcester📍 Weedon Bec📍 Woodford Halse
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.