← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / EN14

Policy EN14

Green and blue infrastructure corridors

On pages 332 to 334 of the official PDF.

The human version

This policy covers green and blue corridors. They will be managed and enhanced by building existing and future networks into proposals, securing contributions for their creation and management, and delivering long-term management strategies for the sub-regional and local networks. Measures to enhance or provide new green infrastructure should be sustainable, help adapt to climate change through flood risk management and carbon storage, be of the highest quality in appearance, access and biodiversity, reflect local character with native and climate-appropriate species, and be supported by long-term management strategies such as the Local Nature Recovery Strategy.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 332

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy EN14 – Green and blue infrastructure corridors A. Green and blue corridors will be recognised for their important contribution to sense of place and they will be managed and enhanced by: i. Incorporating existing and identified future networks into new development proposals; ii. Securing contributions from development or identifying other sources for the creation of and future management of the green infrastructure networks; and iii. Delivering long term management strategies for the subregional and local network. B. Measures to enhance existing and provide new green infrastructure provision will: i. Be designed and delivered sustainably with prudent use of natural resources; ii. Mitigate and adapt to the effects of climate change including through improved flood risk management and as a carbon store; iii. Be designed to the highest quality in terms of appearance, access provision and biodiversity enhancement and protection; iv. Reflect local character through the planting of native and other climate appropriate species and consideration of natural and cultural heritage features; and 7 Natural England, Green Infrastructure Map 8 Natural England, Green Infrastructure Home v. Be supported by long-term management strategies, such as a Local Nature Recovery Strategy and other strategies across the Council. WNLP objectives: 1, 2, 3, 4, 5, 6, 7 13.17. Upper Nene Valley Gravel Pits Special Protection Area 13.17.1. The Upper Nene Valley Gravel Pits were designated as a Special Protection Area (SPA) in 2011 for their international importance as a wetland habitat for nonbreeding waterbirds. Unit 1 of the SPA is located to the south-east of Northampton and is known as the ‘Clifford Hill Gravel Pits’ or ‘Northampton Washlands’. It has also been included on the list of wetland sites of international importance (Ramsar sites) and is a Site of Special Scientific Interest (SSSI). 13.17.2. The Upper Nene Gravel Pits SPA Supplementary Planning Document (SPD) was adopted by West Northamptonshire Council in November 2021 and supplements the policies contained in the WNJCS. It highlights the requirement to consult Natural England on proposals that could affect the SPA, and details consultation zones for different types of development. It should be referred to when preparing development proposals. A mitigation strategy has also been adopted (March 2022) for the Upper Nene Valley Gravel Pits SPA which is appended to the SPD. 13.17.3. Since the adoption of the WNJCS, Natural England has continued to monitor visitor pressure on the SPA. A bird disturbance survey and Visitor Access Study was commissioned jointly with North Northamptonshire Council in 2021. The surveys were undertaken and completed in Spring 2023 and provide an up-to- date evidence base. West Northamptonshire Council is working with North Northamptonshire Council to prepare a new mitigation strategy for the SPA based on this new evidence. 13.17.4. This evidence shows that new development within a wider distance from the SPA can increase recreational pressure contributing to disturbance of and decline in bird species, which form the SPA qualifying features. The mitigation strategy identifies a number of measures including provision of information panels and wardening of the SPA to educate visitors, and a Strategic Access Management and Monitoring (SAMM) 9 contribution and other bespoke mitigation to protect the SPA. 13.17.5. Mitigation may involve: 9 For residential developments which result in a net increase in the number of dwellings within 5.9km of Unit 1 of the SPA it is proposed to avoid and mitigate likely adverse recreational pressure effects on the SPA by making a financial contribution towards Strategic Access Management and Monitoring (SAMM) and/or other suitable mitigation. West Northamptonshire Supplementary Planning Documents. i. Development and implementation of habitat and access management plans within the SPA ii. Improvement of existing greenspace and recreational routes iii. Provision of suitable alternative natural greenspace and recreational routes and information panels for the community and to promote awareness and understanding of the importance of the SPA. 13.17.6. Other significant adverse effects such as loss or fragmentation of habitats and change to water quality can also arise from development. In addition, there could be impacts on areas of functionally linked land which support the bird species (golden plover and lapwing) for which the Upper Nene Valley Gravel Pits SPA has been designated. As such developers should engage early with Natural England regarding their proposals. For example, for sites in close proximity to the SPA, consideration should be given to phasing the construction period, whereby the most intensive/ noisy part of development avoids the sensitive winter season (1st October – 31st March inclusive). 13.17.7. Proposals directly impacting on green infrastructure connected to the Upper Nene Valley Special Protection Area are required to engage with the community to promote awareness and understanding of the importance of the SPA.
Design & placemakingInfrastructure & utilitiesNature & environment📍 Northampton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.