← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / EN8

Policy EN8

Green Wedge

On pages 316 to 319 of the official PDF.

The human version

This policy protects the character and identity of settlements by avoiding physical or perceived visual coalescence. Proposals within the Green Wedge areas defined on the policies map must show how they will protect the identity, open character and setting of fringe settlements, avoiding coalescence between them, the towns and other major development. A proportionate landscape and visual appraisal, or a landscape and visual impact assessment, is required to show how potential coalescence can be successfully mitigated.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 316

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy EN8 – Green Wedge The character and identity of settlements will be protected, a sense of place will be retained and physical or perceived visual coalescence will be avoided. In order to achieve this: A. Proposals within the areas of Green Wedge defined on the policies map will be required to demonstrate how they will protect the identity, open character around and setting of fringe settlements by avoiding physical or perceived visual coalescence between them, the towns and other major development. B. A proportionate landscape and visual appraisal or landscape and visual impact assessment will be required to identify how potential coalescence can be successfully mitigated. WNLP objectives: 10, 13 13.9. West Northamptonshire’s Natural Environment 13.9.1. West Northamptonshire has a rich natural environment which encompasses a range of sites that are recognised for their important contribution to the diversity of species and important habitats. These range from sites that have been designated for their local importance to those that are internationally recognised, such as the Upper Nene Valley Gravel Pits Special Protection Area (UNVGP SPA) (Policy EN15). There are presently 22 Sites of Special Scientific Interest (SSSIs) across the area, and over 180 hectares of land designated as Local Nature Reserves, and 729 Local Wildlife Sites (LWS). 13.9.2. Local Geological Sites (LGS) and Regional Important Geological Sites (RIGs) are also to be found and define areas considered worthy of protection for their Earth Science or landscape importance. 13.9.3. Designated sites form a significant and important part of West Northamptonshire's natural resource by contributing to the connectivity and resilience of ecological assets, biodiversity linkages and the landscape as a whole. In the future these sites will help habitats and species adapt to the effects of climate change. 13.9.4. Increasing pressure is being placed on natural habitats, both as a result of new development, the wider impacts of climate change and the introduction of non- native species. There is a pressing need to not only protect, enhance and manage the adaptation of existing sites, but also to restore and create habitats at a landscape scale, especially those that are also important to the wider green infrastructure network to enable wildlife to freely move. Functioning and resilient habitat networks, also known as Natural Capital, provide significant beneficial effects to the ecosystem, such as on local climate regulation and carbon storage, local amenity, health and wellbeing. 13.9.5. All proposals likely to affect biodiversity/geodiversity will be expected to provide an ecological assessment which demonstrates an understanding of the importance of biodiversity. The ecological assessment can be included in a Design and Access Statement (DAS). 13.10. National policy and legislation for Nature Recovery 13.10.1. The UK Government’s 25 Year Environment Plan sets out what the UK will do to improve the environment, within a generation. By 2042, the ambition is to achieve high quality, accessible, natural spaces with increased biodiversity close to where people live and work, with a focus around the equal distribution of environmental benefits and resources to all. 13.10.2. The Environment Act 2021 introduced a number of new duties for local authorities, which are of relevance to nature recovery and biodiversity, including: • All planning permissions granted in England (with a few exemptions) have to deliver at least 10% biodiversity net gain. • An enhanced duty for Local Authorities to conserve and enhance biodiversity and report on their actions. • The need for LPAs to comply with the above duty and have regard to the Local Nature Recovery Strategy in local planning policy and decisions. • Responsible authorities appointed by the Secretary of State to lead on the preparation of the Local Nature Recovery Strategy (LNRS), working with a broad range of stakeholders. 13.11. The UK Nature Recovery Network and Local Nature Recovery Strategies 13.11.1. The Nature Recovery Network (NRN) is a major commitment in the Government’s 25 Year Environment Plan. By bringing together partners, legislation and funding, DEFRA’s ambition is to restore and enhance the natural environment all over England. By 2042 the UK Governments aim is to: • restore 75% of protected sites on land (including freshwaters) to favourable condition, • create or restore 500,000ha of additional wildlife-rich habitat outside of protected sites, • recover threatened and iconic animal and plant species by providing more, diverse and better-connected habitats, • support work to increase woodland cover, • achieve a range of environmental, economic and social benefits, such as carbon capture, flood management, clean water, pollination and recreation. 13.11.2. Part of this ambition is that local authorities will be responsible authorities and support the NRN by producing and delivering their own Local Nature Recovery strategies (LNRS), working together with local partners and developers to identify and map protected sites alongside areas of importance for biodiversity, including areas of notable potential for biodiversity enhancement and environmental benefits. Local Nature Recovery Strategy 13.11.3. West Northamptonshire Council is a responsible authority and a LNRS for West Northamptonshire is being produced which will assist the implementation of the wider NRN. The LNRS will identify areas for biodiversity enhancement and provide a spatial strategy for nature, establishing priorities and opportunities to recover and enhance the local natural environment. Within this strategy and work, opportunities for the delivery of multiple benefits will to be identified 13.11.4. The Levelling-up and Regeneration Act 2023 requires that a local plan must take account of any local nature recovery strategy that relates to all or part of the local planning authority’s area, including in particular: A. the areas identified in the strategy as areas which – i. are, or could become, of particular importance for biodiversity, or ii. are areas where the recovery or enhancement of biodiversity could make a particular contribution to other environmental benefits, B. the priorities set out in the strategy for recovering or enhancing biodiversity, and C. the proposals set out in the strategy as to potential measures relating to those priorities. The next version of this plan will take into account the West Northamptonshire Local Natural Recovery Strategy with an anticipated adoption of autumn 2026.
Design & placemakingGreen Belt & countrysideNature & environment
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.