← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / PL1

Policy PL1

Resource efficient developments and Retrofit First approach

On pages 45 to 47 of the official PDF.

The human version

This policy asks development to use land, buildings and materials efficiently. Proposals should put retrofit first, keeping, reusing or adapting existing buildings before demolition. They should make best use of previously developed land, reduce embodied carbon, apply circular economy principles, and include water efficiency measures such as rainwater harvesting. Retrofitting traditional and historic buildings is supported where it does not harm ventilation, structure or heritage significance. For designated heritage assets, simple measures and reversibility must be considered. Major development needs a Sustainability Statement. Applicants should check Historic England guidance.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 45

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy PL1 – Resource efficient developments and Retrofit First approach Resource efficiency A. Development proposals should make efficient use of land, buildings, materials and infrastructure in a manner that supports sustainable development, reduces carbon emissions and minimises the unnecessary consumption of natural resources. To achieve this, proposals should: i. Prioritise retrofit first approach including retention, reuse, refurbishment and adaptation of existing buildings before demolition and new construction; ii. Optimise the use of previously developed land, vacant buildings and under-utilised sites; iii. Support sensitive intensification of existing settlements through infill development, redevelopment, conversion of existing buildings and the use of airspace above existing buildings where this would not result in unacceptable impacts on character, amenity, heritage assets, infrastructure capacity or highway safety and is consistent with Policy PL6; iv. Reduce embodied carbon and resource consumption associated with material extraction, manufacture, transport, construction, maintenance and waste generation; v. Embed circular economy principles by efficient use and reuse of materials and reduction of construction waste; vi. Re-use existing materials and building components wherever practicable; vii. Where feasible, incorporate design for disassembly and future adaptability; viii. Design and construction methods should seek to retain existing trees and allow for successful long-term tree establishment; ix. Consider resource efficient on-site and off-site construction methods including modular construction; x. Major developments should consider opportunities for standardisation, repetition of successful design components and modern methods of construction where these support resource efficiency and delivery whilst responding positively to local character, rhythm of built and natural environment, and townscape context; and xi. Incorporate water efficiency measures including rainwater harvesting and, where feasible, greywater recycling systems. Retrofitting traditional and historic buildings Traditional and historic buildings B. The retro-fitting of energy efficiency measures and appropriate use of micro- renewables in traditional and historic properties will be supported where: i. They avoid compromising permeability, ventilation or structural stability; and ii. Total Damp and other maintenance issues that can increase the “cold feel” of the property have been addressed; and iii. It has been demonstrated that they are consistent with the energy hierarchy as set out in Policy PL1; and iv. They minimise harm to any heritage significant of the building. Designated assets C. The impact of such measures on the significance of a designated heritage asset and its setting will be assessed in the context of a whole building approach. Proposals will need to demonstrate that the following have been carefully considered: i. All simple and cost-effective measures that would avoid harm to the designated heritage asset and its setting have been fully assessed and where appropriate implemented or included within the proposals; ii. Any secondary impacts on the heritage asset that may result from the proposals; and iii. The potential ease of reversibility of the proposals. D. Applications for the retrofitting of traditional and historic buildings should review the latest guidance from Historic England when preparing the proposal. Sustainability Statement: E. Applications for major development shall be accompanied by a Sustainability Statement proportionate to the scale and nature of development, demonstrating how the requirements of this policy have been addressed. WNLP objectives: 1, 2, 5 4.5. Energy hierarchy 4.5.1 Whilst Policy PL1 focuses on reducing embodied carbon and promoting the efficient use of land, buildings and materials, Policy PL2 addresses the operational energy performance of development. The National Design Guide encourages well-designed places and buildings to follow the energy hierarchy by reducing the need for energy, improving energy efficiency and maximising the contribution of renewable and low-carbon energy sources. Policy PL2 applies this approach in West Northamptonshire and requires proposals to demonstrate how the hierarchy has informed the design and operation of development, having regard to the detailed guidance contained within National Model Design Code Part 2. 4.5.2 The hierarchy prioritises: • Reduce energy demand by a ‘fabric-first’ approach • Use energy efficient technology • Maximise renewable energy generation 4.5.3 A fabric-first approach seeks to minimise energy demand through the design and performance of the building itself before reliance is placed on mechanical systems or renewable energy generation. This includes measures such as high levels of insulation, high-performance windows and doors, airtight construction, thermal bridging reduction, appropriate building orientation, passive solar gain, natural ventilation and measures to reduce overheating. By reducing energy demand at source, a fabric-first approach improves energy efficiency, reduces operational costs and supports the delivery of low-carbon development. The following two considerations in the hierarchy are guided under Figure 84 – Low Carbon Low Energy Networks of National Model Design Code Part 2. 4.5.4 BREEAM is a recognised sustainability assessment methodology covering energy, water, materials, pollution, waste, transport, health and wellbeing and ecology. Applications should demonstrate how the relevant BREEAM standards, or equivalent successor standards, have informed the development. 4.5.5 The Council's approach to energy efficient development is also informed by the Climate Change Mitigation, Climate Change Adaptation and Renewable and Low Carbon Energy evidence prepared by LUC for West Northamptonshire Council. The evidence supports the application of the energy hierarchy to minimise energy demand, maximise energy efficiency and increase the use of renewable and low carbon energy. It also highlights the use of Energy Use Intensity (EUI) as a measure of operational building performance, references recognised standards and assessment frameworks including BREEAM and NABERS, and identifies examples of net zero carbon development incorporating a space heating demand of less than 30 kWh/m2/annum and total energy use of less than 40 kWh/m2/annum. The evidence also supports decentralised energy systems, heat networks, energy storage and resilience to future climate change.
Climate & energyDesign & placemakingHeritage & character
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.