← Open Consultation: all consultations

West Northamptonshire Plan Explorer

Search the West Northamptonshire Local Plan. 409 pages, made findable.

This consultation closed at 11:59pm, Monday 16 November 2026.

OpenConsult / West Northamptonshire plan / PL2

Policy PL2

Energy efficient development

On pages 47 to 50 of the official PDF.

The human version

This policy requires all development, including change of use, to show how it has considered creating zero carbon development using an energy hierarchy. First, reduce energy demand with a fabric-first approach. Second, use energy efficient technology. Third, maximise renewable energy generation, including solar PV and heat pumps. Applications need a Sustainability Statement that includes an Energy Use Intensity figure. It should show how the proposal achieves space heating demand under 30kWh/m2/annum and total operational energy use under 40 kWh/m2/annum. Any requirement not met must be clearly justified.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 47

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy PL2 – Energy efficient development A. All development including change of use, will be required to demonstrate how they have considered creating zero carbon development based on the following energy hierarchy: 1. Reduce energy demand by ‘fabric-first’ approach a) Building design that minimises energy demand through passive design measures, including orientation, and natural ventilation; b) Incorporates high-performance building fabric to reduce heating and cooling needs; c) Avoids unnecessary energy use through smart layout and compact form; 2. Use energy efficient technology d) Uses energy-efficient systems and appliances, including LED lighting, individual and on-street EV charging points, efficient heating, ventilation and air conditioning systems; e) Supports the upgrading of existing buildings to improve the energy performance where relevant; f) Integrates building management systems to monitor and optimise energy use; g) Meets or exceeds national Building Regulations for energy performance; 3. Maximise renewable energy generation h) Maximises on-site renewable energy generation, including solar PV, solar thermal and heat pumps; i) Considers local energy networks linking renewable energy sources to local heat and power networks, and local battery storage linked to the grid where feasible; and j) Where on-site solutions are not viable, explore off-site renewable energy contributions. B. Applications shall be accompanied by a Sustainability Statement, as required locally, this shall be proportionate to the scale and nature of development and demonstrate how the energy hierarchy has informed the proposal. It should include the following as a minimum: k) An Energy Use Intensity (EUI) in kWh/m2/annum, or equivalent recognised energy metric; l) How the proposal has applied the energy hierarchy; m) How relevant BREEAM standards, NABERS UK Standards or successor standards, have informed the proposal; n) How the proposal seeks to minimise use of fossil fuels; o) How the proposal achieves: i. Space heating demand of less than 30kWh/m2/annum; ii. Total operational energy use of less than 40 kWh/m2/annum. Where any requirements of this policy cannot be met, the Sustainability Statement must clearly justify the reasons. WNLP objectives: 1, 2, 5 4.6. Low carbon energy and renewable energy schemes 4.6.1 Reducing carbon emissions contributes to cleaner air, reduced respiratory illness and improved long-term health outcomes. The NPPF is clear that the planning system should support a transition to a low carbon future including supporting renewable and low carbon energy and associated infrastructure. This can partly be achieved by encouraging the use of renewable energy, either in large-scale developments such as solar and wind farms, but also at the local level on individual housing and employment buildings. 4.6.2 Policy for renewable energy needs to take into consideration local environmental issues such as landscape and visual impacts, as well as the cumulative impacts of renewables. Landscapes will have different levels of sensitivities and consideration should especially be given to policies EN6 and EN7 (Landscapes and Special Landscape Areas) of this Plan and supporting evidence on landscape sensitivity. 4.6.3 The NPPF requires plans to identify opportunities for development to draw its energy from decentralised, renewable or low-carbon energy supply systems. Consequently, other renewable energy solutions that are appropriate include combined heat and power (CHP), heat source pumps, photovoltaics and other emerging technologies. These types of energy will be supported over the use of fossil fuels with the Council seeking to achieve exemplar developments. 4.6.4 Although biomass is a renewable energy source it can have a significant impact on local air quality and residential amenity. The use of biomass will only be supported where an air quality assessment has been undertaken that demonstrates that the development will be air quality neutral. 4.6.5 The Council already has some adopted supplementary planning documents (SPDs) and guidance on renewable energy including: • Daventry Energy and Development SPD (2007) • South Northamptonshire Energy and Development SPD (2007) • South Northamptonshire Energy Efficiency SPD (2013) • South Northamptonshire Low Carbon and Renewable Energy SPD (2013) 4.6.6 These policies reflect the Council’s commitment to tackling environmental change by reducing energy consumption and thus carbon emissions through the application of sustainable development principles in design and encouraging the use of low carbon energies such as CHP on major development proposals and use of active solar technology on any development. 4.6.7 Policy PL3 sets out the criteria against which renewable energy schemes will be assessed helping ensure that the right technology is accommodated in the right location whilst minimising impact on the natural and built environment. 4.6.8 It is noted that some renewable energy projects are dealt with at the national level through the Nationally Significant Infrastructure Projects (NSIP) planning system. In these instances, the Council is a consultee and does not determine the application.
Climate & energyGreen Belt & countrysideInfrastructure & utilities📍 Daventry
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Monday 16 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.