The human version (we wrote this, not the council)
This policy sets out how Towcester's role as a Rural Service Centre will be supported and enhanced. New homes will come from within the town confines, the rest of Towcester South SUE and site T3. New jobs will come from the remaining Towcester South SUE development and sites T4, T5 and T6. The policy also supports the town centre, better connectivity and active travel, and leisure, tourism and exhibition facilities at Towcester Racecourse (T7). It backs the blue and green infrastructure network, local biodiversity and the historic environment. It aims to protect the town's identity and prevent coalescence with neighbouring villages, including through Green Wedge Policy EN8.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
Policy T1 – Spatial strategy for Towcester (Rural Service Centre)
The role of Towcester as a Rural Service Centre will be supported and enhanced by the
following:
i. Providing for new homes within the town confines, remaining development at
Towcester South SUE and at Towcester, north of Burcote Road (T3);
ii. Providing for new jobs within the remaining developments at Towcester South
Sustainable Urban Extension; Land at Bell Plantation (Policy T4); Woolgrowers Field
(Policy T5); and Tiffield Lane (Policy T6) as allocated in the South Northamptonshire
Part 2 Local Plan and re-allocated in this Plan. Smaller employment opportunities will
also be supported where appropriate within the existing urban area;
iii. Enhancing the viability, vitality and role of the town centre in accordance with the town
centre Policy EC7;
iv. Improving connectivity and active travel in accordance with Policy T2;
v. Providing leisure, tourism and exhibition facilities at Towcester Racecourse in
accordance with Policy T7;
vi. Providing for sports, leisure and tourism development through new development,
redevelopment and re-use of existing buildings, and enhanced use of civic, open and
green spaces;
vii. Developing and enhancing the blue and green infrastructure network in the town that
links with existing green infrastructure at Watermeadows, Silverstone Brook,
Racecourse and new greenspace associated with major development sites;
viii. Supporting proposals that conserve and enhance local biodiversity in accordance with
policies EN9 to EN14 and the Local Nature Recovery Strategy;
ix. Supporting proposals that secure the long-term conservation of the historic
environment in accordance with policies EN1, EN2, EN3, EN4 and EN5; and
x. Recognising the importance of the town’s identity, character and setting and
preventing its coalescence with neighbouring villages by resisting development outside
the confines for Towcester and by requiring proposals within the designated areas of
Green Wedge to be in accordance with Policy EN8.
WNLP objectives: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 17
8.4. Connectivity
8.4.1 The A5 in Towcester has longstanding issues with the high levels of traffic passing
through the historic town centre, causing environmental, safety and accessibility
concerns to residents and businesses.
8.4.2 A new link road around the south-west of Towcester, between the A5 and A43,
opened May 2026. The scheme will encourage through traffic, particularly goods
vehicles, to use the new link road and the A43 as an alternative to the A5. This will
alleviate some of the more disruptive traffic from the town centre, improving
accessibility and quality of life in Towcester.
8.4.3 In conjunction with this, National Highways is developing a range of measures to
improve road safety, accessibility, air quality and noise impact by reducing traffic
through the town centre. The measures will also support economic growth by
making the high street through Towcester a more attractive place to visit and
preserve the history and identity of the town
.
8.4.4 Chapter 14: Transport, identifies the over-arching strategic context for transport
matters; however, it is additionally acknowledged that sustainable transport
connections within Towcester, as well as between the town and its rural hinterland
are vital.
8.4.5 In April 2025, the Council adopted the Towcester Local Cycling and Walking
Infrastructure Plan (LCWIP), which identifies where important improvements to
walking, cycling and wheeling routes within the town, as well as identifying
opportunities for new and improved links with nearby surrounding settlements, are
required.
8.4.6 The Local Transport Plan, adopted March 2025, identifies multi-modal
improvements that would positively contribute to Towcester’s strategic
connectivity and travel safety.