← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / Appendix 1 Abbreviations

From the plan

Appendix 1 Abbreviations

On pages 646 to 649 of the official PDF.

The human version

This section is Appendix 1, a table of abbreviations used in the Local Plan, with the meaning of each. It covers planning, environmental and technical terms. Examples include AMR for Authority Monitoring Report, BNG for Biodiversity Net Gain, CIL for Community Infrastructure Levy, HELAA for Housing and Employment Land Availability Assessment, IDP for Infrastructure Delivery Plan, LNRS for Local Nature Recovery Strategy, NPPF for National Planning Policy Framework and SuDS for Sustainable Urban Drainage Systems. It also lists organisation names such as the Environment Agency.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 646

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

APPENDICES Appendices Section Page Appendix 1: Abbreviations Appendix 2: Glossary Appendix 3: Strategic and Non-Strategic Policies Appendix 4: Replacement, Deleted or New Policies Appendix 5: Housing Trajectory Appendix 6: Design Sense Check List Appendix 7: Sustainable Parking Standards Appendix 8: Further information on proposals for public houses 634 671 678 635 655 637 659 669 Appendix 1: Abbreviations Table 22.1: Table of Abbreviation Use AMR Authority Monitoring Report AQA Air Quality Assessment AQMA Air Quality Management Area AV Audio Visual BNG Biodiversity Net Gain BRE Building Research Establishment BREEAM Building Research Establishment Assessment Method CAA Civil Aviation Authority CABE Chartered Association of Building Engineers CCTV Closed Circuit Television CHP Combined Heat and Power CIBSE Chartered Institute of Building Service Engineers CIL Community Infrastructure Levy CO2 Carbon Dioxide CPZ Controlled Parking Zones DRP Design Review Panel DWMP Drainage and Wastewater Management Plans EA Environment Agency ESP Employment and Skills Plan EUI Energy Use Intensity EUV Existing Use Value EVCP Electric Vehicle Charging Points FEMA Functional Economic Market Area FRA Flood Risk Assessment GP General Practitioner (Doctor) GRP Glass Reinforced Plastic HBAPMN Hertfordshire and Bedfordshire Air Pollution Monitoring Network HELAA Housing and Employment Land Availability Assessment HIA Health Impact Assessment HMO House in Multiple Occupation HSE Health and Safety Executive ICT Information Communication Technology IDP Infrastructure Delivery Plan INNS Invasive Non-Native Species kWh Kilowatt hours LAEP Local Area Energy Plan LETI London Energy Transformation Initiative LGR Local Government Reorganisation LHNA Local Housing Needs Assessment LNRS Local Nature Recovery Strategy LURA Levelling-Up and Regeneration Act 2023 MCA Mineral Consultation Area MCASPD Mineral Consultation Areas Supplementary Planning Document MUGA Multi Use Games Area NFM Natural Flood Management NPPF National Planning Policy Framework NOx Nitrogen Oxide PDMP Parking Design and Management Plan PPTS Planning Policy for Traveller Sites PSA Primary Shopping Areas RAF Royal Air Force RIA Retail Impact Assessment RICS Royal Institution of Chartered Surveyors RIGS Regionally Important Geological Site SA Sustainability Appraisal SAC Special Area of Conservation SFRA Strategic Flood Risk Assessment SIL Strategic Industrial Location SME Small and Medium-sized Enterprise SPZ Source Protection Zones SSSI Site of Special Scientific Interest SuDS Sustainable Urban Drainage Systems TRBMP Thames River Basin Management Plan UGF Urban Greening Factor WFD Water Framework Directive
Flooding & waterHomes & housingInfrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.