← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere Plan Explorer

Flooding & water

Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.

139 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy requires building alterations, extensions and basements to be of a high standard. Extensions must respect the form, materials and character of the original building and group of buildings, and must not harm the amenity of neighbours, including back gardens. Contemporary designs are supported where these tests are met. Roof extensions on the street frontage should be avoided in favour of rear extensions. Residential extensions must keep a usable garden. Basements, including light wells, must not harm structural stability, flood risk, the natural environment or neighbouring amenity, and need safe access and egress.

The human version (we wrote this, not the council)This policy deals with the Borough's watercourses and blue infrastructure. Development should respond to the ecological, recreational and character value of waterways, and protect and enhance the quality of the borough's chalk streams. Proposals on sites containing or next to a main river, ordinary watercourse or other water space must keep an undeveloped buffer of at least 10m, managed for ecology and biodiversity. They must look to restore river channels and floodplains, remove barriers to wildlife including by de-culverting where feasible, and avoid new culverts or permanent overshading. They should also improve public access, with areas for people and for wildlife, and provide life-saving equipment and signage.

The human version (we wrote this, not the council)This policy sets out how development must avoid harm from pollution. Proposals that would significantly increase pollution of air, soil or water, or cause harm through fumes, noise, light, smell or other emissions, will not be permitted. Neighbouring uses must be protected, following the agent of change principle. On air quality, some schemes need an air quality report and mitigation. For contaminated land, a preliminary risk assessment is needed where harm is possible. On water, proposals must support the Thames River Basin Management Plan, and some need a Water Framework Directive Assessment. Development that could harm groundwater, especially in Source Protection Zones, will not be permitted.

The human version (we wrote this, not the council)This policy sets out how development must manage flood risk. Proposals must apply a sequential approach, not increase flood risk, leave an undeveloped setback from watercourses, and stay safe and operational in a flood. A site-specific Flood Risk Assessment is required in Flood Zones 2, 3a and 3b, for all major development in Flood Zone 1, and elsewhere where other flood sources may affect a site. Schemes passing the Sequential and Exception Tests must put vulnerable uses in the lowest risk areas, avoid net loss of flood storage and include safe access and egress. A Flood Emergency Response Plan is required where appropriate.

The human version (we wrote this, not the council)This policy covers water supply and wastewater. New or expanded water supply and wastewater facilities are supported where they meet needs shown in an asset management or similar plan, avoid unacceptable harm and are built in a timely and sustainable way. Development must show that water supply and sewer networks have enough capacity, or that provision will be made before occupation. Surface and foul water systems should be separated, and mains foul drainage is preferred over non-mains drainage. Proposals should be water efficient and use SuDS. Development in a Source Protection Zone is supported only where there is no risk to groundwater, or adequate mitigation.

The human version (we wrote this, not the council)This site allocation covers Imperial Place on Elstree Way, Borehamwood, a privately owned 2.2 ha site of office buildings and a multi-storey car park. It is allocated for comprehensive mixed-use regeneration delivering at least 550 new homes in the first half of the plan period, with employment and workspace retained, re-provided or intensified, plus public realm and green infrastructure. Parts of the site lie in Flood Zones 2 and 3, and a culverted watercourse runs along its eastern boundary. A site-wide masterplan is required. Development must respond to the operational needs of Elstree Studios and neighbouring employment uses.

The human version (we wrote this, not the council)This site allocation covers land north of Allum Lane, Elstree, Borehamwood, a privately owned 22.18 ha site of undeveloped land and golf course. It lies in the Metropolitan Green Belt. It is allocated as an urban extension of at least 486 homes, expected to be medium-density and low-rise, including genuinely affordable homes, in the first half of the plan period. Planning application 26/0318/OUT seeks outline consent for 136 dwellings. Constraints include a public right of way, surface water flood risk, tree preservation orders and the setting of two Grade II listed buildings at Nicoll Farm. A site-wide masterplan and phased infrastructure are required.

The human version (we wrote this, not the council)This policy requires development in Potters Bar to protect and enhance the town's character, heritage, green and blue infrastructure and landscape setting. Proposals should respond to local scale and townscape, protect heritage assets, and place taller buildings only where they fit. They should protect trees, parks and habitats, improve ecological links, and enhance Potters Bar Brook as a blue-green spine. Sustainable drainage is expected. Development at the edge of the town must be landscape-led and comprehensively planned, and must avoid unacceptable coalescence with nearby settlements.

The human version (we wrote this, not the council)This site allocation covers Land rear of Park Avenue, east of Southgate Road, Potters Bar, a 17.4 ha publicly owned site of agricultural land. It proposes an urban extension delivering at least 260 homes, with compatible community and open space uses and walkable neighbourhoods linked by walking and cycling routes to the High Street District Centre. The site is confirmed as grey belt. Development must follow a site-wide masterplan under Policy DM3 and keep and enhance the mature field-edge trees on the southeastern boundary, which with the M25 will form a defensible Green Belt boundary.

The human version (we wrote this, not the council)This section is Appendix 1, a table of abbreviations used in the Local Plan, with the meaning of each. It covers planning, environmental and technical terms. Examples include AMR for Authority Monitoring Report, BNG for Biodiversity Net Gain, CIL for Community Infrastructure Levy, HELAA for Housing and Employment Land Availability Assessment, IDP for Infrastructure Delivery Plan, LNRS for Local Nature Recovery Strategy, NPPF for National Planning Policy Framework and SuDS for Sustainable Urban Drainage Systems. It also lists organisation names such as the Environment Agency.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.