← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / EC12

Policy EC12

Hertsmere’s Town Centre Network and Hierarchy

On pages 180 to 190 of the official PDF.

The human version

This policy sets Hertsmere's town centre network and hierarchy, shown in Table 8.5 and on the Policies Map, with Borehamwood Town Centre as the primary retail centre and Darkes Lane, Potters Bar as a second tier centre. It applies a town centres first approach and the Sequential Test to main town centre uses. Out-of-centre proposals are refused unless provided for in the Plan or they pass the sequential test. Retail Impact Assessments are required for main town centre uses of 350 square metres gross floorspace or more at edge-of-centre and out-of-centre locations. Farm shops are restricted to land-based goods.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 180

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

EC12 Hertsmere’s Town Centre Network and Hierarchy Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities Strategic Policy A Proposals for development must support and reinforce Hertsmere’s town centre network and hierarchy as shown in Table 7.5 and the Policies Map. They must demonstrate how the development will maintain and enhance town centre vitality and viability commensurate with the role and function of the centre, in accordance with Table 8.5. B A ‘town centres first’ approach will be used to assess development proposals for main town centre uses, in line with national planning policy. The Sequential Test will be applied to ensure that main town centre uses are directed to locations within town centres or, if no suitable town centre sites are available or expected to become available within a reasonable period, to appropriate edge-of-centre locations. C Development proposals for Class F1 learning and non-residential institutions and Class F2 local community uses are encouraged to locate in town centres and other well-connected areas. D Development proposals for new main town centre uses in out-of-centre locations will be refused unless provision has been made for these uses within the Local Plan, including site allocations, or it passes the sequential test. This includes proposals for rural diversification that incorporate main town centre uses, where these have regard to Policy EC10 (The Rural Economy). Proposals for new farm shops or extensions to existing farm shops will only be permitted where the range of goods sold is restricted to those in connection with the land- based business and most goods sold should be produced on site. E Retail Impact Assessments (RIAs) will be required to be submitted with proposals for development comprising main town centre uses of 350 square metres gross floorspace or more at edge-of-centre and out-of-centre locations, unless provision for main town centre uses has been made in a site allocation. RIAs should be proportionate to the nature and scale of development. Development proposals will be refused unless an RIA demonstrates that: Table 8.5: Town Centre Network and Hierarchy Designation Location Role & Function Main Town Centre Borehamwood Town Centre Primary retail centre, with a range of retail, retail services, food and drink and leisure uses. Local Town Centre Darkes Lane, Potters Bar Second tier retail centre with a range of retail, retail services, food and drink and leisure uses. District Centre High Street, Potters Bar Bushey Village Bushey Heath Radlett More specialised, smaller centres, focussed around retail services and food and drink uses, alongside retail. Local Centre Leeming Road, Borehamwood Localised provision of retail uses, alongside food and drink and retail services. Significant for its proximity to the residential area within Cowley Hill Ward. Key Neighbourhood Parades Manor Way, Borehamwood Harcourt Road, Bushey Bushey Hall Road, Bushey Cranbourne Parade, Potters Bar Locally accessible retail parades that provide more than purely convenience retail. Neighbourhood Centre Elstree Village Centre Andrew Close, Shenley Significant local shopping parades within the two largest villages in Hertsmere, primarily important for access to local convenience retail and retail services. Neighbourhood Parade Croxdale Road, Borehamwood Hartforde Road, Borehamwood Smaller parades that allow access to a range of shops and i. There is an identified need and market demand for the amount and type of floorspace proposed; and ii. The proposal, either by itself or in combination with other existing, committed or planned development, will not adversely impact on the vitality and viability of Hertsmere’s town centre network and hierarchy and its wider catchment. F Development proposals within town centres should contribute to the delivery of and support the appropriate distribution of retail uses to help ensure the Borough’s future need arising from strategic site allocations and increased residential densities within town centres is met. Proposals for new major Use Class E (a) retail development1 should prioritise Borehamwood and Potters Bar Darkes Lane in the site selection process before considering other appropriate locations, including District Centres. Howard Drive, Borehamwood Rossington Avenue, Borehamwood Aldenham Road, Bushey Bournehall Avenue, Bushey Bushey Mill Lane, North Bushey Park Avenue, North Bushey High Street North (1), Potters Bar High Street North (2), Potters Bar Battlers Green Drive, Radlett services within walking distance of a larger number of homes away from the main shopping centres. Individual Shops Organ Hall Road, Borehamwood Shenley Road (North), Borehamwood Studio Way, Borehamwood Thrisk Road, Borehamwood Sparrows Herne (1), Bushey Sparrows Herne (2), Bushey High Road (1), Bushey Heath High Road (2), Bushey Heath Church Road, Potters Bar Wayside, Potters Bar Aldenham Road, Radlett London Road, Shenley St Albans Road, South Mimms Individual shops that perform an important function in day to day life for residents without easy access to larger parades and centres. Figure 8.2: Town Centre Network and Hierarchy Explanation 8.84 This policy establishes the Borough’s town centre hierarchy and describes the main role and function of the centres within it. The Local Plan classifies Main Town Centres, Local Town Centres, District Centres and Local Centres. The boundaries of the designated town centres within this hierarchy are shown on the Policies Map, along with the corresponding Primary Shopping Areas for Major and District Centres 8.85 Proposals for development must help to facilitate the delivery of the Borough’s spatial strategy by supporting and reinforcing Hertsmere’s town centre network and hierarchy. The nature and mix of uses along with the design of development should be commensurate with the scale, role, function and character of a town centre within the hierarchy. Development proposals must demonstrate how they will support town centre vitality and viability by responding positively to the distinctive character and unique role of a centre in supporting the neighbourhoods and communities within its catchment, which may cover areas both within and outside of the Borough. 8.86 Borehamwood Main Town Centre is the Borough’s principal town centre and a key shopping and leisure destination within the local catchment, with a variety of food and drink establishments alongside retail and service units. It includes several film and television studios, which draw in a contracted-in workforce from around London and the south-east, in relationship with other studios within the north-west London arc of film and television production and relates to central London via the mainline railway station. Public realm improvements identified through the Settlement and Place Polices in this Plan will help ensure that the vitality and viability of the Main Town Centre continue to improve. 8.87 Darkes Lane Potters Bar Local Town Centre includes one of the borough’s key cultural venues in the Wyllyotts Centre, as well as a good range of food and drink and a convenience retail offer anchored by a Sainsbury’s store. It is highly accessible by train, but bus links which would be of more relevance to people using the centre who live within the catchment, are infrequent and do not serve a wide range of locations. Improvements to the town centre environment form a part of the Settlement and Place Polices in this Plan. 8.88 Part 3 of this Plan includes additional policies for the Borough’s main settlements. It sets out how new development within these centres will be managed to facilitate the delivery of sustainable growth and liveable neighbourhoods, consistent with the spatial strategy for the Borough. 8.89 Site allocation policies have been included for strategic development sites within and at the edge of town centres. 8.90 This policy sets out the ‘town centre first’ approach for the location of main town centre uses as defined by the National Planning Policy Framework. Such uses should be directed to the Borough’s designated town centres or if necessary, appropriate edge-of-centre locations (unless provision for such uses have been made elsewhere by the Local Plan). Development proposals will be assessed in accordance with the Sequential Test to site selection set out in national planning policy. 8.91 Outside of designated centres, Retail Impact Assessments will be required for proposals of 350 square meters gross floorspace or more, unless provision for retail uses has been made through a Local Plan site allocation. This local threshold is more rigorous than that set by national policy and is informed by local evidence9. It provides wider scope for the consideration of proposals that could adversely impact on Hertsmere’s town centre hierarchy and compromise delivery of the spatial strategy. 8.92 For the Sequential Test, flexibility will be applied to proposals for Class E(g) office uses, recognising that these uses will also be acceptable in designated employment areas, consistent with Policy EC2 (Protecting employment land and delivering new workspace). Main town centre uses in rural locations 8.93 Proposals for rural diversification will be subject to the Sequential Test to ensure that they will not undermine the vitality and viability of the Borough’s retail centres, and that of any identified retail centres that lie outside of the Borough. The need for farm diversification is recognised, and proposals that pass the Sequential Test will be permitted where they are not in conflict with other policies in this plan. 8.94 To protect the role of established retail centres in Radlett as well as Potters Bar and London Colney (in neighbouring St Albans District), further retail development at Battlers Green Farm or Willows Farm will be resisted. Retail impact assessments 8.95 Retail Impact Assessments (RIAs) apply to any main town centre uses must demonstrate that there is a clear need and demand for the type and amount of the use being proposed in that location, and that it will not adversely affect any of the Borough’s retail centres, or any identified retail centres located outside of the Borough in neighbouring administrative areas. 8.96 The Council may call upon specialist consultants to review RIAs where necessary, the cost of which is to be charged to the applicant. The need for external review will be determined on a case-by-case basis, depending on factors including the size and complexity of the proposal, and the level of likely impact on retail centres. Meeting future needs 8.97 With the levels of growth planned in the Borough up to 2043, it is important that neighbourhoods and local communities are appropriately supported with good 9 The Hertsmere Retail and Town Centres Study (AECOM, 2026) concludes that the 2,500 square metre gross threshold set in national policy is inappropriate for Hertsmere and that a lower threshold should be used. provision of shops, services and community facilities. The Hertsmere Retail and Town Centre Study (AECOM 2026) include an assessment of retail floorspace needs in the Borough. The study has considered current market trends, whilst recognising that the retail market is fast-moving. The indications are that there is no real scope for new retail development within Hertsmere over the plan period, and there is no need to allocate sites for new retail development10. Nevertheless, the Local Plan does consider the comprehensive redevelopment and replacement of existing provision that has reached the end of its lifespan or provides an out-dated platform. These places are the subject of site allocations (in Part 3) and specify the mix of uses that will be delivered through comprehensive redevelopment. Figure 8.3: Borehamwood Town Centre 10 The evidence recommends that the capacity forecasts, particularly beyond the next five years, should be treated with a degree of caution as they are based on various assumptions and forecasts that can and will change. Therefore, greater weight should be placed on the capacity forecasts over the next 5–10-year period. The figure is included in Policy EC11 as a benchmark to support the plan - led approach to meeting objectively assessed needs for retail, consistent with the NPPF. Figure 8.4: Potters Bar Local Town Centre (Darkes Lane) Figure 8.5: High Street, Potters Bar District Centre Figure 8.6: Bushey Village District Centre Figure 8.7: Bushey Heath District Centre Figure 8.8: Radlett District Centre
Site allocationsTown centres & shopsTransport & travel📍 Borehamwood📍 Bushey📍 Bushey Heath📍 Elstree📍 Potters Bar📍 Radlett📍 Shenley📍 South Mimms
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.