← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere Plan Explorer

Town centres & shops

High streets, town centres, shops, markets, food and drink, and leisure uses.

126 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy requires shopfronts, including their signs, canopies and security installations, to be of a high standard that does not harm local character, amenity or public safety. New or altered shopfronts should keep features of architectural interest, suit the host building, use quality materials and keep glazed shop windows. Fascias should not be overly large or extend above first floor windows. Open shopfronts without a stall riser and glazed screen will be resisted. Historic shopfronts in Conservation Areas and on listed buildings should be kept or restored. Internally illuminated box fascia signs and projecting signs are restricted in Conservation Areas and residential areas.

The human version (we wrote this, not the council)This section introduces Chapter 8 on the economy and culture. It lists the twenty policies in the chapter, from EC1 Meeting Hertsmere's Economic Needs to EC20 Visitor accommodation. They cover employment land and workspace (EC2 to EC10), including affordable workspace and rural employment, and town centres (EC11 to EC16). They also cover harmful uses (EC17), public houses (EC18), markets (EC19) and visitor accommodation (EC20).

The human version (we wrote this, not the council)This policy requires workspace proposals to provide suitable unit types, sizes and rents, particularly for social, cultural or economic development uses. Existing affordable workspace should be kept or re-provided unless this harms industrial intensification. Major commercial development should, when viable, provide at least 10% of rentable floorspace (Net Internal Area) as affordable workspace at 50% of market rents, on site. Off-site provision is acceptable only if on-site provision is not feasible or gives greater economic benefits, with payments in lieu calculated using Table 8.3. Affordable workspace must be secured for a period agreed by the Council.

The human version (we wrote this, not the council)This policy says town centres should remain at the heart of Hertsmere's settlements as focal points for retail, commercial, cultural, leisure, community and civic activities. They will be managed positively to be inclusive, diverse, attractive and resilient to change, including online shopping and climate change. Proposals should secure long-term vitality and viability by optimising land use, keeping distinctive character, and creating barrier-free, safe and healthy environments. These should reduce vehicle dominance, encourage walking, cycling and public transport, and provide open space and green and blue infrastructure.

The human version (we wrote this, not the council)This policy sets Hertsmere's town centre network and hierarchy, shown in Table 8.5 and on the Policies Map, with Borehamwood Town Centre as the primary retail centre and Darkes Lane, Potters Bar as a second tier centre. It applies a town centres first approach and the Sequential Test to main town centre uses. Out-of-centre proposals are refused unless provided for in the Plan or they pass the sequential test. Retail Impact Assessments are required for main town centre uses of 350 square metres gross floorspace or more at edge-of-centre and out-of-centre locations. Farm shops are restricted to land-based goods.

The human version (we wrote this, not the council)This policy asks development to make the best use of land and floorspace in town centres and at their edges. It supports new mixed-use schemes, comprehensive redevelopment, reuse and reconfiguration of existing space, space above or below commercial units, and multi-storey buildings rather than single-storey development. Mixed-use proposals are judged on the centre's role, effect on vitality and viability, active frontage and compatibility with neighbours. Where housing is included, it must not harm the centre's function, appearance and character, and must have adequate access, including separate secured access for homes.

The human version (we wrote this, not the council)This policy covers the Main Town Centre and Local Town Centre. Proposals must show how they support vitality and viability and add to local character. In Primary Shopping Areas, retail, leisure, retail services and other Class E uses are permitted where an active window display can be kept. Class E and other main town centre uses that do not give an active ground floor frontage must submit a Shopping Area Impact Statement showing no unacceptable harm. Proposals must also avoid unreasonable noise, odour and fumes. Planning conditions may be used to secure Class E(a) retail uses.

The human version (we wrote this, not the council)This policy covers the District Centres. Proposals must support the vitality, viability and local character of the centre. Primary Shopping Areas are identified in all District Centres. Those in Potters Bar High Street, Bushey, Bushey Heath and Radlett should focus on specialist, independent shops, services and food and drink. Small and moderately sized units are encouraged and should be protected. Major development must include units suitable for micro, small and independent businesses. Changes of use from Class E need an appropriate replacement use and an active ground floor frontage or window display.

The human version (we wrote this, not the council)This policy covers smaller centres and individual shops, including Local Centres, Key Neighbourhood Parades, Neighbourhood Centres and Parades, and Individual Shops. Their retail uses should be protected wherever possible. Changes of use from Class E need similar alternative provision within normally 400 to 800 metres by walking, plus an active frontage. Changing a main town centre use to ground floor residential needs a marketing exercise of a minimum continuous period of one year showing no reasonable prospect of retention, and no harm to frontage continuity. Conditions may secure some retail in out-of-centre schemes.

The human version (we wrote this, not the council)This policy prevents a harmful overconcentration of uses such as hot food takeaways, betting offices, casinos and bingo halls, payday loan shops, vape shops, pawnbrokers, nightclubs, drinking establishments and uses that add to local air quality issues. Concentration is assessed within a 400-metre radius, using the thresholds in Table 8.6. In Main and Local Town Centres, hot food takeaways must not exceed 10% of units. Shopping parades of 20 units or more can have a maximum of 2 takeaways. New takeaways visible from school access points must not undermine school healthy eating policies.

Policy EC19

Markets

pp. 210–213

The human version (we wrote this, not the council)This policy says proposals must protect and seek to enhance existing markets and market spaces. New markets that complement the town centre network are encouraged and should be directed to town centre locations. Outside centres, new market space is supported only if the sequential approach shows it will not harm town centre vitality, uses vacant or underused sites, is well served by public transport, can be accommodated on streets or public realm, and is temporary. The supporting text notes Borehamwood and Potters Bar have monthly farmers and craft markets, and Borehamwood has a twice-weekly street market on Shenley Road.

The human version (we wrote this, not the council)This policy covers serviced visitor accommodation, which should be within or at the edge of town centres, or on well-connected sites. Proposals are supported where they are proportionate, avoid harmful overconcentration, meet parking standards, are well designed with accessible bedrooms, and have an operator agreement in place before work starts. Active ground floor frontages are needed, and ancillary facilities should be open to public use where appropriate. Visitor accommodation must not cause a net loss of housing. Use of a residential property for short-term or holiday let must not exceed 90 nights within a calendar year.

The human version (we wrote this, not the council)This section sets out the context, vision and key spatial objectives for Borehamwood. It describes Borehamwood as Hertsmere's largest settlement, principal town and economic centre, with strong rail and road links and an internationally known film and television industry. The Plan makes it the main focus for housing-led growth and regeneration, using a brownfield-first approach and coordinated, rather than piecemeal, redevelopment. The vision includes a regenerated town centre, a stronger Shenley Road, protection of the studios cluster, and a network of connected neighbourhoods. It lists eleven key spatial objectives covering housing, town centre vitality, film and creative industries, movement, design, green infrastructure and infrastructure delivery.

The human version (we wrote this, not the council)This policy covers regeneration of Borehamwood Town Centre. Development there must contribute to housing-led mixed-use regeneration, active streets, better public realm and the infrastructure needed for growth. Proposals are supported where they add homes, keep the centre viable, provide a mix of town centre uses, give active ground floor frontages, and strengthen Shenley Road as the civic, commercial and social spine. They should also improve the arrival experience at Elstree & Borehamwood railway station. Residential-only redevelopment of strategically important sites is not supported unless mixed use is shown to be unviable or unnecessary. Major development needs a masterplan or design and access statement.

The human version (we wrote this, not the council)This site allocation covers the Retail Park in Borehamwood Town Centre, a 5.01 ha urban site in public and private ownership with about 20,000 sqm of mainly large-format retail, leisure and health uses and extensive surface parking. It is allocated for comprehensive mixed-use redevelopment, delivering at least 500 new homes in the latter stages of the plan period, with the 20,000 sqm of main town centre uses re-provided. A site-wide masterplan is required, with phasing that keeps a critical mass of retail activity. Constraints include the culverted Borehamwood Brook beneath part of the car park and flood risk.

The human version (we wrote this, not the council)This site allocation covers the Aycliffe Road and Leeming Road Local Centre in Borehamwood, a 1.42 ha urban site. It has ground-floor shops and services with homes above, adjoining residential blocks, parking, garages and open space. The main commercial and maisonette blocks are in public ownership. It is allocated for phased residential-led mixed-use regeneration delivering at least 200 homes and an improved local centre, with public realm, open space and green infrastructure. Existing shops and services must be kept, re-provided or replaced with an equivalent or better offer. Phasing must keep trading going, and affected tenants and leaseholders need a rehousing strategy. A site-wide masterplan is required.

The human version (we wrote this, not the council)This section sets out the context, vision and objectives for the Potters Bar area. Potters Bar is one of Hertsmere's main towns, with a railway station, two town centres at Darkes Lane and the High Street, and a suburban, green character. The Plan names it a key location for housing-led regeneration, town centre renewal and infrastructure investment. The vision is for a well-connected town where growth is focused on the town centres and brownfield sites, backed by better public realm, walking and cycling, and green and blue infrastructure. The section lists 11 key spatial objectives.

The human version (we wrote this, not the council)This policy makes Potters Bar's two town centres, Darkes Lane and the High Street, the main focus for housing-led mixed-use regeneration, town centre renewal and public realm improvement. Proposals are supported where they add homes, keep active ground floor frontages, improve streets and public spaces, and protect or re-provide community and employment uses. Darkes Lane should work as a station-linked centre and the High Street as a local service and community centre. Residential-only redevelopment of strategically important sites is not supported unless mixed use is shown to be unviable or unnecessary. Major development needs a masterplan or similar material.

The human version (we wrote this, not the council)This site allocation covers Canada Life Place, off Mutton Lane, a 1.84 ha urban site with a 13-storey office building, a 6-storey office building and smaller buildings on the High Street. It proposes comprehensive mixed-use redevelopment delivering at least 369 homes during Years 1 to 10, with town centre, commercial, leisure and cultural uses on the ground floor. Development must follow a masterplan under Policy DM3, be design-led, and take account of nearby Grade II listed buildings, Ladbrooke School and surface water flood risk.

The human version (we wrote this, not the council)This site allocation covers the Tesco site on Mutton Lane, a 2.9 ha urban site with a supermarket, car park and petrol filling station. It proposes comprehensive redevelopment delivering at least 588 homes and the re-provision of the existing foodstore, mainly in the latter years of the plan period. Homes must be high quality and include at least 20% Affordable Housing. Development must follow a site-wide masterplan under Policy DM3, link well to the High Street and neighbouring Canada Life Place, and deliver new public realm and open space.

The human version (we wrote this, not the council)This site allocation covers the Bus Garage on the High Street, a 1.2 ha publicly owned urban site currently used as a bus depot. It proposes comprehensive redevelopment delivering at least 119 homes, with compatible employment, main town centre and community uses at ground or lower level, mainly in the latter years of the plan period. Existing buildings will be demolished and the site reconfigured with a street-based layout and better routes. Development must follow a site-wide masterplan under Policy DM3 and take account of constraints, including the locally listed wall on the southern boundary.

The human version (we wrote this, not the council)This section sets out the context, vision and objectives for the Bushey area. Bushey is one of Hertsmere's principal settlements, made up of Bushey Village, Bushey Heath and North Bushey, close to Watford and the London Borough of Harrow. The Plan identifies it as a location for managed and character-led growth, focused on previously developed land, infill, small-site intensification and local centres. The vision is for sensitive growth that protects heritage, identity and green setting, strengthens the local centres and improves walking, cycling and public transport links. The section lists 13 key spatial objectives.

The human version (we wrote this, not the council)This policy aims to strengthen Bushey Village, Bushey Heath and other local centres and parades as attractive, accessible and distinctive places. Proposals are supported where they keep centres lively and viable, offer a mix of local shops, services and homes, provide active frontages and improve public realm and shopfronts. Heritage assets and conservation areas must be protected. In Bushey Village, development should reinforce its role as the historic and cultural heart. In Bushey Heath, it should support its role as a local service and convenience centre, including small-scale mixed-use development and public realm improvements.

The human version (we wrote this, not the council)This policy sets conditions for meanwhile (temporary) use of vacant land or buildings. Such uses are supported only where the site or unit is being actively marketed, lies within a site allocation not expected to be redeveloped soon, or is within a phased major scheme. The use must suit its location, with priority for employment, community or cultural uses, and must not harm neighbours' amenity under the Agent of Change principle. It must not prevent permanent use or delivery of the allocation, and must be temporary. In town centres and employment areas it must not harm viability or function.

The human version (we wrote this, not the council)This section is Appendix 3, a table showing whether each policy and site allocation in the Hertsmere Local Plan is strategic or non-strategic. It explains that the NPPF says local plans should distinguish strategic policies from non-strategic ones. The table lists policies chapter by chapter, including High-Quality Design, Heritage, Housing, Economy and Culture, Social and Community Infrastructure, Green and Blue Infrastructure and Sustainable Design. For example, HQD1 is strategic, HQD2 is non-strategic, and H1 to H3 are strategic.

The human version (we wrote this, not the council)This section is Appendix 4, a table showing what has happened to each adopted policy from the earlier planning documents. It states whether each policy is deleted, replaced or newly added in the new Local Plan, and names the new policy that takes its place. Examples include Core Strategy Policy CS1 on new homes, replaced by Policy H1, and CS4 on Affordable Housing, replaced by H3. CS5 on rural exception sites is deleted, and CS13 on the Green Belt is deleted because it duplicates national policy.

The human version (we wrote this, not the council)This section is Appendix 8, giving further information on proposals for public houses. It is read with the Local Plan policy on public houses, and the Council may use discretion case by case. A viability statement is required for a change of use, including at least the last three trading years of audited accounts and evidence that diversification options were explored. A marketing statement must show a marketing process lasting at least three years, with an asking price agreed after independent RICS valuation. Evidence of consultation with community and voluntary organisations is also required.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.