← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / GI2

Policy GI2

Hertsmere’s Watercourses and Blue Infrastructure

On pages 244 to 247 of the official PDF.

The human version

This policy deals with the Borough's watercourses and blue infrastructure. Development should respond to the ecological, recreational and character value of waterways, and protect and enhance the quality of the borough's chalk streams. Proposals on sites containing or next to a main river, ordinary watercourse or other water space must keep an undeveloped buffer of at least 10m, managed for ecology and biodiversity. They must look to restore river channels and floodplains, remove barriers to wildlife including by de-culverting where feasible, and avoid new culverts or permanent overshading. They should also improve public access, with areas for people and for wildlife, and provide life-saving equipment and signage.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 244

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

GI2 Hertsmere’s Watercourses and Blue Infrastructure Strategic objectives A Delivering a better future for Hertsmere H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A Hertsmere’s watercourses and blue infrastructure provide multifunctional social, economic and environmental benefits that support sustainable neighbourhoods and communities. Development proposals should identify and respond positively to the unique attributes of waterways, considering: i. Environmental function and ecological qualities of blue infrastructure; ii. Safeguarding and creating priority habitats within blue infrastructure, in particular protecting and enhancing the ecological quality of the borough’s chalk streams; iii. Safeguarding priority areas for habitat enhancement in the Local Nature Recovery Strategy, in accordance with Policy GI3 Local Nature Recovery Strategy; iv. Contribution to the Borough’s network of open spaces; v. Recreational and amenity value; vi. Distinctive features that help to shape and reinforce the Borough’s physical, cultural and historical character; and vii. Support for the visitor economy. B Development proposals on sites containing or adjacent to a main river, ordinary watercourse or other water space must: i. Maintain an undeveloped buffer zone of at least 10m that is designed and managed for the benefit of ecology and biodiversity, and includes a long- term landscape and ecological management plan which includes the management of invasive non-native species (INNS); ii. Investigate and maximise opportunities to enhance or restore river channels and their riparian zones, flood flow pathways, floodplains and other natural flood management features with the objective of returning them to their natural state wherever possible; iii. Incorporate measures to enhance the ecological value of water spaces, including integrating riparian planting, wet woodland and soil protection where these are ecologically appropriate, and removing artificial structures Explanation 10.9 The Council considers that the Borough’s watercourses and blue infrastructure provide multifunctional social, economic and environmental benefits that support sustainable neighbourhoods and communities. They can make a valuable contribution towards successful and sustainable place-making. In this policy, a watercourse includes Main Rivers (as defined by the Environment Agency) and ordinary watercourses. Ordinary watercourses are passages of water that do not form part of a Main River; they can include streams; ditches, drains, mills, dams, culverts and weirs. 10.10 It is acknowledged that Hertfordshire has a variety of different habitats that are worthy of protection. Within the context of the Borough’s watercourses there is an established international and national responsibility for protecting its special chalk rivers and their unique ecology. It is highlighted that there are only 260 chalk streams globally, and Hertfordshire is the custodian of about 10% of that resource. 10.11 It is further noted that not all chalk streams are fully recognised/protected by statutory or non-statutory designations. Rivers, chalk streams and floodplains are an important element of the Hertfordshire Nature Recovery Strategy. Consequently, that act as barriers to the movement of animal species, including de- culverting where feasible. iv. Not include buildings that introduce permanent overshading to a watercourse, propose the culverting of a watercourse, or prejudice future opportunities for de-culverting; v. Incorporate measures to enhance the amenity, recreational and historic value of water spaces, including enhancing public access to these spaces. Where access to a watercourse is proposed the development must include appropriate zoning to establish areas for people and areas for wildlife as agreed by the Environment Agency; and vi. Contribute to a safe riverside environment by making appropriate provision for riparian life-saving equipment such as grab chains, access ladders, life buoys, along with information signage and CCTV. vii. Protect hydrology, soil conditions and natural drainage patterns, especially in situations when nearby woodland, wet habitats or veteran trees may be affected. Applicants should assess and avoid impacts on adjacent habitats arising from changes in runoff, drainage, water levels or ground conditions. viii. Give preference to flood mitigation measures which restore and work with natural processes and favour Natural Flood Management techniques (NFM). Sustainable drainage solutions should minimise the requirement for hard engineering to rivers. SUDs features should be designed so that they have biodiversity value in addition to their flood management function. the Council agrees that it is important that local plans explicitly recognise them as a priority habitat reflected by policy. Development Proposals Involving Watercourses 10.12 The policy seeks at least a 10m undeveloped buffer zone between new development and watercourses and blue infrastructure. This is in accordance with the definition of a riparian zone set out in the Statutory Biodiversity Net Gain metric. This width ensures development does not encroach on waterways, potentially damaging banks, and provides the minimum width of habitat needed to provide for the functioning of wildlife habitats and reduce the levels of diffuse pollution reaching the watercourse. There may be instances where a smaller buffer is agreed with those proposing development, where circumstances demonstrably merit. Nevertheless, at least a 10m undeveloped buffer should be considered the standard. 10.13 Riparian zones support the ecological functioning of watercourses, providing habitat, buffering watercourses from disturbance and pollution, improving water quality, and supporting natural flood management. 10.14 Opportunities for de-culverting of watercourses should be actively pursued as an integral part of associated development proposals. Planning permission will be granted for proposals that do not involve the culverting of watercourses, and which do not prejudice future opportunities for de-culverting. Where this is clearly demonstrated not to be possible, planning obligations will be used to secure funding to help enable enhancement works to sections of watercourse in the vicinity. 10.15 De-culverting watercourses can provide a range of benefits. These include: • Improved biodiversity, habitat connectivity and climate resilience; • Reduced flood risk from blockages or collapse and slowing the flow; and • Improved social health and mental wellbeing through amenity and access to nature, urban cooling, improved air and water quality by filtration of air and water by aquatic and riparian vegetation. 10.16 As part of the plan-making process, the Council notes the Environment Agency’s opposition in principle to the culverting of watercourses, due to the potential adverse ecological, flood risk, geomorphological, human safety and aesthetic impacts. It is understood that changes to national planning policy will include measures that seek to prevent the enclosure of watercourses and encourage their de-culverting and the re-naturalising of river channels. These measures are intended to deliver multiple social and environmental benefits of re-naturalising rivers, including improvements to water management. 10.17 Proposals for development must ensure that new buildings do not overshadow a watercourse. This is necessary because excessive shade inhibits aquatic plant growth which can lead to a loss of biodiversity and a decrease in water quality due to loss of filtration and oxygenation provided by aquatic plants. It can also lead to the loss of riparian vegetation which prevents bank erosion and maintains water quality by filtering run-off. Explanation 10.18 The Hertfordshire Local Nature Recovery Strategy (LNRS) makes a commitment to restoring and enhancing nature across Hertfordshire and playing our part in the restoration of nature across England. It sets out a shared vision and identifies priority areas for investment and action, including protecting our ancient chalk streams. The partnership brings together organisations from the public, private and voluntary sectors, working closely with land managers, citizen scientists and local communities. 10.19 Earlier in 2026, the Government updated Natural Environment and Plan-making Planning Practice Guidance on LNRSs. These updates include references to how LNRSs will provide valuable evidence in support of the local plan-making process and how they can inform local planning authority decision making. 10.20 In response to these changes in national planning practice guidance, the Council has sought to embed the Hertfordshire Local Nature Recovery Strategy within the Hertsmere Local Plan. This approach is specifically reflected within the Local Plan’s site allocations.
Flooding & waterInfrastructure & utilitiesNature & environment
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.