← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBA12

Site allocation HBA12

Imperial Place, Elstree Way, Borehamwood

On pages 403 to 407 of the official PDF.

The human version

This site allocation covers Imperial Place on Elstree Way, Borehamwood, a privately owned 2.2 ha site of office buildings and a multi-storey car park. It is allocated for comprehensive mixed-use regeneration delivering at least 550 new homes in the first half of the plan period, with employment and workspace retained, re-provided or intensified, plus public realm and green infrastructure. Parts of the site lie in Flood Zones 2 and 3, and a culverted watercourse runs along its eastern boundary. A site-wide masterplan is required. Development must respond to the operational needs of Elstree Studios and neighbouring employment uses.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 403

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBA12 Imperial Place, Elstree Way Site Address Imperial Place, Elstree Way, Borehamwood Site Characteristics Site Size ha Setting Ownership 2.2 ha Urban Private Current Uses Office buildings and associated multi-storey car park. How Site was Identified Regulation 18 candidate regeneration site Planning Designations and Site Considerations Public right of way adjoining the site; culverted watercourse on the eastern boundary; the multi-storey car park lies within Flood Zones 2 and 3 and much of the site is affected by surface-water flood risk. Planning Status No recent relevant planning history. Indicative Development Capacity 550 Dwellings, and commercial, retail floorspace Timeframe for delivery Strategic Objectives B A thriving local economy C The regeneration of Borehamwood and Potters Bar E Meet the Borough’s housing needs by delivering homes for everyone G Securing a greener Borough H Responding to the climate emergency K Securing the timely delivery of infrastructure Non-Strategic Policy Site Allocation 14.162 Imperial Place is allocated for comprehensive mixed-use regeneration. It will deliver at least 550 new homes during the first half of the plan period. It will also secure retained, re-provided or intensified employment and workspace uses, public realm and green infrastructure. Opportunities 14.163 The scale of Imperial Place provides an opportunity to renew an established office location, substantially reduce land devoted to parking and create a new network of streets, spaces and mixed-use buildings within the Elstree Way corridor. 14.164 The culverted watercourse, flood-risk areas and existing public right of way provide an opportunity to structure a stronger blue-green and active-travel network. The site can also provide modern flexible workspace supporting Borehamwood’s film, television, digital and wider creative economy. Development Requirements 14.165 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating how the strategic urban site will deliver a mix of new homes and other compatible uses in accordance with the site allocation. 14.166 The masterplan must use the design-led approach to achieve a high intensity mixed-use development that includes positive frontages that address key routes and public spaces. This will incorporate high-quality, medium-density, town centre homes, active ground floor frontages in line with the Retail and Town Centre policies, and new and improved public realm and open space. 14.167 Development must safeguard and strengthen the site’s employment role. An appropriate quantum of modern employment or workspace must be retained or re- Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 provided, with proposals demonstrating how the development supports the wider Elstree Way employment and creative cluster. 14.168 Development must respond appropriately to the operational requirements of Elstree Studios and other neighbouring employment uses. Residential amenity must be secured without imposing unreasonable constraints on established lawful employment activity. 14.169 Flood Zones 2 and 3, surface-water flood risk and the culverted watercourse must shape the masterplan from the outset. More vulnerable development should be directed to areas of lower risk and a sequential approach applied within the site. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 14.170 The masterplan must investigate opportunities to enhance the watercourse corridor, including de-culverting or ecological improvement where technically feasible, and integrate SuDS with public realm, biodiversity and landscape. 14.171 The adjoining public right of way must be retained and enhanced as part of a safe, overlooked and accessible walking and cycling network connecting Elstree Way, Maxwell Road and surrounding destinations. 14.172 Development must respond positively to the site’s Areas that Could Become of Importance for Biodiversity designation and deliver biodiversity net gain through a connected landscape and habitat framework. Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. Development Guidance 14.173 Greater height and density are appropriate in principle within this highly accessible town-centre location. Taller elements may be appropriate at the principal Elstree Way gateway and on the most accessible parts of the cluster. Proposals for tall buildings will consider townscape, public realm, movement, daylight and sunlight, microclimate and transitions to adjoining lower-rise residential areas. 14.174 The masterplan should use buildings to define Elstree Way as an urban street rather than an area of freestanding buildings behind parking. Entrances, active uses, street trees and pedestrian space should strengthen the corridor’s role as a civic and mixed-use connection to the town centre. 14.175 The masterplan should create a clear hierarchy of streets, pedestrian routes and public spaces, with active employment or other non-residential uses focused along Elstree Way and the most important internal routes. 14.176 Employment floorspace should be flexible and adaptable, capable of accommodating offices, studios, workshops, co-working or other creative and technical businesses. Ground-floor depths and servicing arrangements should allow genuine long-term commercial occupation. 14.177 The eastern watercourse corridor should be treated as a positive placemaking feature rather than a residual service edge. Landscape, SuDS and habitat improvements should be coordinated with walking and cycling where compatible with flood and ecological functions. 14.178 Building and landscape design should ensure that new residential uses can coexist with Elstree Studios and other employment activity, including through appropriate orientation, acoustic design, separation and internal layout where necessary. 14.179 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future.
Design & placemakingFlooding & waterSite allocations📍 Borehamwood📍 Elstree📍 Elstree Way📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.