← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBA2

Policy HBA2

Borehamwood Town Centre Regeneration

On pages 360 to 364 of the official PDF.

The human version

This policy covers regeneration of Borehamwood Town Centre. Development there must contribute to housing-led mixed-use regeneration, active streets, better public realm and the infrastructure needed for growth. Proposals are supported where they add homes, keep the centre viable, provide a mix of town centre uses, give active ground floor frontages, and strengthen Shenley Road as the civic, commercial and social spine. They should also improve the arrival experience at Elstree & Borehamwood railway station. Residential-only redevelopment of strategically important sites is not supported unless mixed use is shown to be unviable or unnecessary. Major development needs a masterplan or design and access statement.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 360

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBA2 Borehamwood Town Centre Regeneration Strategic Objectives A Delivering a better future for Hertsmere B A thriving local economy C The regeneration of Borehamwood and Potters Bar D Support a well-educated and skilled population E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A Proposals for development located within Borehamwood Town Centre, as identified on Figure 14.3: Borehamwood Town Centre Regeneration, must contribute to the housing-led mixed-use regeneration of the town centre, support active streets, improve public realm, provide or re-provide town centre uses and contribute to the infrastructure required to support growth. B Development proposals within Borehamwood Town Centre will be supported where they: i. Make a significant contribution to housing delivery through the redevelopment and intensification of suitable town centre sites; ii. Deliver residential development above, behind or alongside active town centre uses where this would support town centre vitality and provide an appropriate standard of residential amenity; iii. Maintain and enhance the vitality and viability of the town centre; iv. Provide an appropriate mix of retail, food and drink, leisure, cultural, civic, community, workspace, employment and residential uses; v. Provide active ground floor frontages on Shenley Road, the station approach, key public spaces and other frontages identified on Figure 14.3; vi. Strengthen Shenley Road as the town’s principal civic, commercial and social spine; vii. Improve the arrival experience at Elstree & Borehamwood railway station, including through public realm, interchange, walking, cycling, bus and wayfinding improvements; viii. Support a stronger evening, leisure and cultural economy where compatible with residential amenity, public safety and the role of the town centre; ix. Retain, modernise or re-provide community, cultural, health, civic and social infrastructure, where affected by redevelopment, unless it is demonstrated that the facility is no longer required; x. Provide high-quality shopfronts, signage and building frontages that contribute positively to townscape character; xi. Improve the quality, safety, accessibility and attractiveness of streets and public spaces, including through better footways, crossings, greening, seating, lighting, public art and wayfinding; xii. Manage servicing, deliveries, parking, access and waste so that these do not dominate streets or public spaces; and xiii. Contribute to infrastructure and public realm improvements identified in Figure 14.2: Borehamwood Spatial Strategy, Figure 14.3: Borehamwood Town Centre Regeneration, the Infrastructure Delivery Plan and relevant site allocation policies; C Residential development will be supported where it forms part of a mixed-use approach that maintains or strengthens the town centre’s retail, leisure, cultural, community, civic and employment role. Residential-only redevelopment of strategically important town centre sites will not be supported unless it is demonstrated that mixed-use development is not viable or is not necessary to support the role, function and vitality of the centre. D Major development within the town centre must be accompanied by a masterplan, design and access statement, or other proportionate material demonstrating how the proposal contributes to the comprehensive regeneration of the town centre, responds to the priorities identified in Figure 14.3: Borehamwood Town Centre Regeneration. E Development that would result in inactive frontages, poor pedestrian environments, isolated residential blocks, car-dominated layouts, loss of important town centre uses, or fragmented development that undermines the wider town centre strategy will not be supported. Explanation 14.25 Borehamwood Town Centre is Hertsmere’s principal retail and service centre and is the most appropriate location in the Borough for significant housing-led mixed-use regeneration. The town centre benefits from strong accessibility, including proximity to Elstree & Borehamwood railway station, and contains several sites where redevelopment and intensification can make a significant contribution to housing delivery and place-making. 14.26 Policy HBA2 ensures that new homes are delivered as part of a wider mixed-use approach. Residential development should increase footfall, support shops and services, contribute to the evening and leisure economy, and help fund improvements to streets, public spaces, community infrastructure and movement networks. 14.27 Housing-led regeneration must not result in the loss of the town centre’s role or function. Development should support active frontages, maintain or re-provide important town centre uses, and contribute to a more attractive and welcoming town centre. Strategically important town centre sites should be planned comprehensively and should not come forward as isolated residential schemes unless robustly justified. 14.28 Shenley Road will remain the main civic, commercial and social spine of Borehamwood. Development should support its role through active frontages, improved shopfronts, better public realm, enhanced pedestrian and cycle movement, and a stronger cultural, leisure, community and evening economy offer. 14.29 Figure 14.3: Borehamwood Town Centre Regeneration identifies the broad area and priorities to which Policy HBA2 applies. It should be read alongside Figure 14.2: Borehamwood Spatial Strategy, the Policies Map, and relevant site allocation policies. Figure 14.3 Borehamwood Town Centre Regeneration
Homes & housingTown centres & shopsTransport & travel📍 Borehamwood📍 Elstree📍 Potters Bar📍 Shenley📍 Shenley Road
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.