← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBA6

Site allocation HBA6

Retail Park, Borehamwood

On pages 378 to 383 of the official PDF.

The human version

This site allocation covers the Retail Park in Borehamwood Town Centre, a 5.01 ha urban site in public and private ownership with about 20,000 sqm of mainly large-format retail, leisure and health uses and extensive surface parking. It is allocated for comprehensive mixed-use redevelopment, delivering at least 500 new homes in the latter stages of the plan period, with the 20,000 sqm of main town centre uses re-provided. A site-wide masterplan is required, with phasing that keeps a critical mass of retail activity. Constraints include the culverted Borehamwood Brook beneath part of the car park and flood risk.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 378

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBA6 Retail Park, Borehamwood Site Address Retail Park Borehamwood Site Characteristics Site Size ha 5.01 ha Setting Urban Ownership Public and Private Current Uses The site is comprised of approximately 20,000 sqm of main town centre floorspace, principally comprised of large-format retail units, together with leisure and health uses. The site also includes The Grove Surgery, gym provision, extensive surface customer parking and servicing areas. How Site was Identified Identified through the Council’s Local Plan urban capacity and site-selection process and assessed through the HELAA. Planning Designations and Site Considerations Strategic urban redevelopment site within Borehamwood Town Centre and forming a substantial component of the proposed Primary Shopping Area; the culverted Borehamwood Brook/Main River beneath part of the existing car park; reservoir and other flood risk. Planning Status No recent relevant planning history. Indicative Development Capacity 500 dwellings Reprovision of 20,000 sqm of main town centre uses Timeframe for delivery Strategic Objectives B A thriving local economy C The regeneration of Borehamwood and Potters Bar E Meet the Borough’s housing needs by delivering homes for everyone H Responding to the climate emergency K Securing the timely delivery of infrastructure Non-Strategic Policy Site Allocation 14.46 Borehamwood Town Centre Retail Park is allocated for comprehensive mixed-use redevelopment comprising residential development together with an appropriate quantum and range of main town centre uses, including retail; and compatible leisure, employment, health, commercial and community uses. The re-provided town centre will be supported by new public realm, public open space and green and blue infrastructure. The site allocation will deliver at least 500 new homes during the latter stages of the plan period. 14.47 Development must maintain and strengthen the site’s important contribution to the vitality and viability of Borehamwood Town Centre while transforming its existing low-density and car-dominated urban form. Opportunities 14.48 The site forms a substantial part of Borehamwood Town Centre and the Primary Shopping Area but is currently characterised by single-use large-format retail buildings, extensive surface parking and a relatively inward-looking urban form. 14.49 Comprehensive redevelopment provides an opportunity to create a more efficient and sustainable mixed-use part of the town centre while retaining and modernising its important retail and other town-centre functions. 14.50 Development provides opportunities to deliver a range of regeneration objectives. These include substantial new housing in one of the Borough’s most accessible locations; retention and modernisation of important appropriate and compatible retail, employment, health, leisure and community functions. It will also deliver the re-establishment of a traditional town centre street and block structure with active ground-floor uses and residential development above. This will secure the improvement of physical and visual connections with Shenley Road; the creation of new east-west and north-south pedestrian and cycle routes through the site; the substantial reduction in the dominance of surface parking. It will also secure the delivery of new public spaces, landscaping and urban greening; the enhancement Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 in the relationship with Borehamwood Brook and explore opportunities for de- culverting or naturalisation where technically feasible. 14.51 The redevelopment must be planned as a coherent whole rather than as a series of disconnected redevelopment parcels. The masterplan should establish the overall spatial and land-use framework, development parcels and phasing, movement hierarchy, public realm and blue-green infrastructure, building heights and massing, parking and servicing strategy and infrastructure requirements. 14.52 Given the importance of the existing Shopping Park to Borehamwood’s retail offer, the masterplan must demonstrate how redevelopment can be phased while maintaining an appropriate critical mass of retail and other town-centre activity. Development Requirements 14.53 Development must be planned comprehensively in accordance with Policy DM3 (Masterplans and comprehensive development). A site-wide masterplan must demonstrate how the allocation will deliver a coordinated mix of residential, retail, leisure, commercial, health, community and other compatible town centre uses. 14.54 Landowners and other relevant interests must work positively together in preparing and delivering the masterplan. The lead landowner or developer bringing forward the site-wide masterplan must demonstrate that reasonable efforts have been made to undertake positive and meaningful engagement with other landowners, occupiers and interests whose land is necessary for or may be affected by the comprehensive redevelopment of the allocation. 14.55 The masterplan must establish the overall spatial framework for the allocation, including: • The distribution and relationship of uses; • Development parcels and phasing; • The street and movement hierarchy; • Connections to Shenley Road, Theobald Street and surrounding neighbourhoods; • Public realm and open space; • Green and blue infrastructure; • Building heights and massing; • Parking, servicing and delivery arrangements; and • Infrastructure requirements and their delivery. • The masterplan must demonstrate how individual phases can be delivered without prejudicing the comprehensive redevelopment of remaining parts of the allocation or the achievement of the wider regeneration objectives for Borehamwood Town Centre. 14.56 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high intensity mixed-use development that provides positive frontages that address key routes and public spaces. This will incorporate high-quality and high-density residential, active ground floor frontages in line with the Retail and Town Centre policies and incorporate new and improved public realm and open space. 14.57 The masterplan must contain a site-wide design code consistent with policy HQD1(K) and undergo assessment through the Design Review Panel. 14.58 Greater height and density are appropriate in principle within this highly accessible town-centre location. Taller elements should be located through the master planning process having regard to townscape, public realm, movement, daylight and sunlight, microclimate and transitions to adjoining lower-rise residential areas. The site is located within the Borehamwood Town Centre Tall Building Suitability Zone. This identifies a maximum building height of 20-storeys. This is not an assumed target height, and remains subject to townscape, heritage, microclimate and amenity evidence. 14.59 Development must retain and strengthen the site’s main town centre function and re-provide an appropriate quantum and range of retail and other main town centre floorspace. The amount and type of retail, leisure, health and community floorspace must be justified against the Retail and Town Centres evidence and the objective of maintaining town-centre vitality. 14.60 The phasing strategy must demonstrate how an appropriate retail and service offer will be maintained during redevelopment so that the vitality and viability of Borehamwood Town Centre is not unacceptably harmed. 14.61 The site must be fully reintegrated with the surrounding street network, with substantially improved access and permeability between Shenley Road, Theobald Street and surrounding neighbourhoods. 14.62 Development must establish a hierarchy of new routes through the site, including strong east-west and north-south pedestrian and cycle connections linking redevelopment directly with Shenley Road. 14.63 Development must provide positive and active ground-floor frontages within the Primary Shopping Area and along principal new streets and public spaces. 14.64 A site-wide public realm strategy must deliver new and improved public spaces, street trees, landscaping, urban greening and high-quality pedestrian environments and complement wider improvements to Borehamwood Town Centre. 14.65 The culverted Borehamwood Brook, flood risk and drainage constraints must inform the masterplan from the outset. The masterplan must investigate opportunities to de-culvert, naturalise or otherwise enhance the watercourse where technically feasible and environmentally beneficial. The masterplan should explore opportunities for Borehamwood Brook to become a positive component of the public realm and blue-green infrastructure network rather than remaining solely as buried infrastructure. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 14.66 Applicants should work in partnership with Thames Water to manage surface water, divert existing sewers where applicable and ensure infrastructure upgrades are delivered ahead of the site being occupied. 14.67 Development adjoining existing residential areas must provide appropriate transitions in scale and protect residential amenity. 14.68 Existing health and community facilities, including The Grove Surgery where a continuing need is demonstrated, must be retained, appropriately re-provided or relocated to suitable modern accommodation as part of redevelopment. Development Guidance 14.69 Development should create a new piece of Borehamwood Town Centre rather than simply rebuild the existing retail park. 14.70 The masterplan should generally establish a street-based urban form, with main town centre and other active uses concentrated at ground and lower levels and residential development above. 14.71 A range of building footprints should be provided to accommodate larger-format retail uses alongside smaller retail, leisure, commercial, health and community premises. Buildings should be designed to allow adaptation and subdivision over time. 14.72 Higher development may be appropriate towards the central and more accessible parts of the allocation, with scale generally stepping down towards sensitive residential edges. 14.73 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that secures maximum standards for the site that will secure a shift towards a car-lite / car-free future. 14.74 Phasing should be integral to the masterplan. Early phases must establish routes, public spaces and development parameters that enable rather than constrain subsequent phases.
Design & placemakingSite allocationsTown centres & shops📍 Borehamwood📍 Potters Bar📍 Shenley📍 Shenley Road
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.