← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBUSA2

Policy HBUSA2

Movement and Connectivity in Bushey

On pages 537 to 540 of the official PDF.

The human version

This policy requires development in Bushey to support safer, more accessible and more sustainable movement within the settlement and to neighbouring centres. Proposals should prioritise walking, cycling, wheeling and public transport, and improve links between Bushey Village, Bushey Heath, North Bushey, Bushey railway station, schools and parks. They should reduce severance from main roads and junctions, provide cycle parking and support a green active travel network. Where improvements depend on land outside Hertsmere, proposals must show how cross-boundary coordination will be addressed. Major development must show how it reduces car dependency.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 537

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBUSA2 Movement and Connectivity in Bushey Strategic Objectives A Delivering a better future for Hertsmere H Responding to the climate emergency I Celebrating our local identity J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A Development in Bushey must contribute to safer, more accessible and more sustainable movement within the settlement and to neighbouring centres. B Development proposals will be expected to: i. Prioritise walking, cycling, wheeling and public transport in accordance with the transport user hierarchy; ii. Improve connections between Bushey Village, Bushey Heath, North Bushey, local schools, parks, community facilities and open spaces; iii. Improve walking, cycling and public transport connections to Bushey railway station and other nearby public transport hubs, including where these lie outside the borough boundary; iv. Support safe, legible and accessible routes to Watford, Stanmore, Harrow, South Oxhey and other neighbouring communities where relevant; v. Reduce severance caused by main roads and difficult junctions through improved crossings, continuous footways, traffic calming, junction improvements and inclusive design; vi. Improve pedestrian and cycle access to local centres, schools, health facilities, recreation grounds, parks, countryside routes and Public Rights of Way; vii. Support a coherent green active travel network, including routes that connect parks, open spaces, green corridors and neighbourhoods; viii. Support improved links along and across London Road, High Road, Sparrows Herne, Little Bushey Lane and other key routes identified in Figure 16.2: Bushey Spatial Framework and Figure 16.4: Sustainable Travel Networks and Opportunities Across Bushey; ix. Improve the quality, accessibility and safety of pedestrian routes, including through better surfacing, lighting, visibility, seating, wayfinding and maintenance; x. Provide secure and accessible cycle parking in local centres, residential developments, community facilities and other key destinations; xi. Support improved bus stops, real -time information, shelters, seating and service reliability where required to mitigate development impacts; xii. Manage parking, servicing, deliveries and construction impacts so that they do not undermine pedestrian safety, public realm quality or local -centre vitality; xiii. Provide appropriate disabled parking and accessible drop -off arrangements in local centres and close to key facilities; xiv. Support shared mobility, car clubs, cycle hire and other low-carbon transport measures where appropriate; xv. Contribute to transport infrastructure and mitigation measures identified through the Infrastructure Delivery Plan, Transport Assessment, Local Cycling and Walking Infrastructure Plan, site allocation policies and other relevant evidence; and xvi. Demonstrate how movement, access, public realm and active travel measures respond, where relevant and proportionate, to the routes, links, crossing points and green movement priorities identified in Figure 16.2: Bushey Spatial Framework, Figure 16.4: Susta inable Travel Networks and Opportunities Across Bushey. C Major development must demonstrate how its layout, access, street design and public realm will support reduced car dependency and increased use of walking, cycling, wheeling and public transport. D Where movement improvements depend on land or infrastructure outside Hertsmere, proposals should demonstrate how they have had regard to cross- boundary connections shown indicatively on Figure 16.2 and Figure 16.4, and how any necessary coordination with neighbouring authorities or infrastructure providers will be addressed. E Where development forms part of a wider group of related sites or a local centre opportunity area, proposals must demonstrate how access and movement arrangements have been coordinated with adjoining sites and with the Bushey Spatial Framework. Explanation 16.24 Policy HBUSA2 delivers Key Spatial Objectives 9 to 13 by supporting safer and more sustainable movement within Bushey and between Bushey and neighbouring centres. Bushey’s movement challenges reflect its dispersed settlement structure, the separation between Bushey Village, Bushey Heath and North Bushey, the location of Bushey railway station to the west of the main settlement, and the influence of major roads and cross-boundary travel patterns. 16.25 The policy recognises that Bushey’s accessibility is not limited to infrastructure within Hertsmere. Bushey residents rely on connections to Watford, Stanmore, Harrow, South Oxhey and other nearby places for rail, employment, education, services and leisure. Development should therefore have regard to cross-boundary connections and should support improvements where appropriate and deliverable. 16.26 The Bushey Spatial Framework identifies the need to overcome severance, improve active travel links and prioritise sustainable movement. This includes improving the quality of pedestrian routes, strengthening cycle links, improving access to Bushey railway station, supporting links to nearby public transport hubs, improving wayfinding and creating a green active travel network that connects open spaces and neighbourhoods. 16.27 Figure 16.4: Sustainable Travel Networks and Opportunities Across Bushey identifies existing and proposed sustainable travel routes and opportunities across Bushey, including connections to local centres, public transport hubs, open spaces, neighbouring settlements and cross-boundary destinations. The map should be read alongside Figure 16.2: Bushey Spatial Framework, the Policies Map, site allocation policies, the Infrastructure Delivery Plan, and transport evidence. 16.28 Movement improvements should not be limited to site access or highway capacity. Development should contribute to wider placemaking objectives by improving public realm, reducing traffic dominance, providing safer crossings, supporting local centres, connecting parks and community facilities, and creating routes that are accessible for all ages and abilities. 16.29 Proposals will be expected to coordinate with the Bushey Spatial Framework, site allocation policies, the Infrastructure Delivery Plan, the Local Cycling and Walking Infrastructure Plan and other relevant transport evidence. Where improvements depend on land or infrastructure outside Hertsmere, the Council will work with neighbouring authorities and infrastructure providers to support coordinated delivery. F Development proposals that would prejudice identified walking, cycling, public transport, accessibility, green-link or public realm improvements will not be supported. 16.30 The delivery of improved movement and connectivity will support Bushey’s managed growth role by helping residents access shops, services, schools, parks, public transport and community facilities without relying solely on private cars. Figure 16.4: Sustainable Travel Networks and Opportunities
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Bushey📍 Bushey Heath📍 Little Bushey📍 Stanmore📍 Watford
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.