← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere Plan Explorer

Watford

18 sections of the plan, in document order.

The human version (we wrote this, not the council)This section gives a snapshot of Hertsmere today. It is a south Hertfordshire borough whose population grew from 94,762 in 2001 to an estimated 110,212 in 2024. It describes areas of wealth alongside pockets of deprivation, such as Cowley Hill in Borehamwood. It names the four main settlements, Borehamwood, Potters Bar, Radlett and Bushey, and notes 15 conservation areas and 325 statutory listed assets. It covers the film and television industry at Elstree Studios, and high house prices, with an average of £555,000 and a house-price-to-income ratio of 11.9.

The human version (we wrote this, not the council)This policy covers the District Centres. Proposals must support the vitality, viability and local character of the centre. Primary Shopping Areas are identified in all District Centres. Those in Potters Bar High Street, Bushey, Bushey Heath and Radlett should focus on specialist, independent shops, services and food and drink. Small and moderately sized units are encouraged and should be protected. Major development must include units suitable for micro, small and independent businesses. Changes of use from Class E need an appropriate replacement use and an active ground floor frontage or window display.

The human version (we wrote this, not the council)This policy sets out how development must manage flood risk. Proposals must apply a sequential approach, not increase flood risk, leave an undeveloped setback from watercourses, and stay safe and operational in a flood. A site-specific Flood Risk Assessment is required in Flood Zones 2, 3a and 3b, for all major development in Flood Zone 1, and elsewhere where other flood sources may affect a site. Schemes passing the Sequential and Exception Tests must put vulnerable uses in the lowest risk areas, avoid net loss of flood storage and include safe access and egress. A Flood Emergency Response Plan is required where appropriate.

The human version (we wrote this, not the council)This section sets out the context, vision and objectives for the Bushey area. Bushey is one of Hertsmere's principal settlements, made up of Bushey Village, Bushey Heath and North Bushey, close to Watford and the London Borough of Harrow. The Plan identifies it as a location for managed and character-led growth, focused on previously developed land, infill, small-site intensification and local centres. The vision is for sensitive growth that protects heritage, identity and green setting, strengthens the local centres and improves walking, cycling and public transport links. The section lists 13 key spatial objectives.

The human version (we wrote this, not the council)This policy requires development in Bushey to support safer, more accessible and more sustainable movement within the settlement and to neighbouring centres. Proposals should prioritise walking, cycling, wheeling and public transport, and improve links between Bushey Village, Bushey Heath, North Bushey, Bushey railway station, schools and parks. They should reduce severance from main roads and junctions, provide cycle parking and support a green active travel network. Where improvements depend on land outside Hertsmere, proposals must show how cross-boundary coordination will be addressed. Major development must show how it reduces car dependency.

The human version (we wrote this, not the council)This site allocation covers Bushey Hall Golf Club, Bushey Hall Drive, a privately owned 41.71 ha former golf course and private open space in the Metropolitan Green Belt. It is allocated for at least 500 homes, with community, healthcare and wellbeing facilities, extensive public open space and green and blue infrastructure. The principle of redevelopment has been established through outline permission 24/1022/OUT. The site is defined as grey belt, and development must secure a defensible Green Belt boundary that keeps landscape separation between Bushey Village and North Bushey. A site-wide masterplan under Policy DM3 is required.

The human version (we wrote this, not the council)This site allocation covers Bushey Golf and Country Club on the High Street, a 12.42 ha publicly owned site that has housed leisure, commercial, events and community uses. It is allocated for residential-led mixed-use regeneration of at least 250 homes, with community and cultural facilities, compatible commercial uses and substantial publicly accessible open space. The site is defined as grey belt, and development must keep strategic separation between Bushey and Oxhey. A substantial part of the former estate must stay as permanent open space, and the project ambition is 50% genuinely affordable homes.

The human version (we wrote this, not the council)This site allocation covers the Northwest Radlett Strategic Urban Extension, a privately owned 68.81 ha site of agricultural land and woodland, made up of Kemprow Farm, land off Watford Road, land south of Hill Farm, land off Oakridge Avenue and land at Starveacres. It proposes at least 1,573 homes with commercial, community and main town centre uses. Parts are grey belt and the rest provisionally grey belt. A defensible Green Belt boundary on the northern and western edges must keep separation from Watford. Landowners must work together under a masterplan, and school place needs must be agreed with Hertfordshire County Council.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.