This site allocation covers Bushey Hall Golf Club, Bushey Hall Drive, a privately owned 41.71 ha former golf course and private open space in the Metropolitan Green Belt. It is allocated for at least 500 homes, with community, healthcare and wellbeing facilities, extensive public open space and green and blue infrastructure. The principle of redevelopment has been established through outline permission 24/1022/OUT. The site is defined as grey belt, and development must secure a defensible Green Belt boundary that keeps landscape separation between Bushey Village and North Bushey. A site-wide masterplan under Policy DM3 is required.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HBUSA7 Bushey Hall Golf Club, Bushey Hall Drive
Site Address Bushey Hall Golf Club, Bushey Hall Drive (Scotts Wood Park,
Hertsmere)
Site
Characteristics
Site Size ha Setting Ownership
41.71 ha Strategic Urban
Extension
Private
Current Uses Former golf course/private open space.
How Site was
Identified
Call for Sites 2025 (CFS-2025-143) and HELAA (HEL-0905-22)
Planning
Designations and
Site
Considerations
Metropolitan Green Belt. Scotts Wood Local Wildlife Site and Local Nature
Reserve; LNRS APIB/ACIB areas; TPOs; Flood Zones 2/3, surface-water
and reservoir flood risk; Main Rivers; sand/gravel safeguarding; public right of
way; nearby listed buildings/Scheduled Monument; gas and National Grid
infrastructure.
Planning Status 24/1022/OUT – outline permission for up to 350 homes together with
community, healthcare and wellbeing facilities, access, landscaping and
associated works; granted 26 February 2026.
Indicative
Development
Capacity
500 dwellings
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Non-Strategic Policy
Existing Planning Consent
16.98 The site benefits from the following extant consent:
• 24/1022/OUT – outline permission for up to 350 homes together with
community, healthcare and wellbeing facilities, access, landscaping and
associated works.
Site Allocation
16.99 Bushey Hall Golf Club is allocated for at least 500 homes together with community,
healthcare and wellbeing facilities, extensive public open space, green and blue
infrastructure and associated transport/community infrastructure. It is anticipated that
the site allocation will be delivered during the plan period. The principle of
redevelopment of the former golf course/private open space has been established
through outline permission 24/1022/OUT.
16.100 The Borough-wide Green Belt Assessment Stage 2 further considers the site’s
contribution to the purposes of the Green Belt. It concludes that the site is defined as
grey belt. The comprehensive development of the strategic urban extension must
secure a defensible Green Belt Boundary that maintains effective landscape
separation between Bushey Village and North Bushey.
Opportunities
16.101 The allocation provides an opportunity to deliver a substantial residential
neighbourhood in a comparatively well-connected location between Bushey and
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
Watford whilst securing the retention of extensive landscape, ecological and flood-
management areas. The delivery of the site allocation provides an opportunity to
secure investment that significantly improves walking and cycling networks between
existing neighbourhoods in Watford and Bushey and supports healthier and more
sustainable lifestyles.
16.102 Development must retain and deliver the substantial publicly accessible open space,
green and blue infrastructure and community, healthcare and wellbeing benefits
forming part of the extant permission. Subsequent proposals that seek to materially
alter these elements must demonstrate that the resulting open-space, recreation and
community-infrastructure provision is equivalent or exceeds and complies with
Policies GI7, SCI1 and SCI3 as applicable.
Development Requirements
16.103 Development must be planned and delivered comprehensively in accordance with
Policy DM3. This requires that a site-wide masterplan be prepared demonstrating
how the strategic urban extension will deliver a mix of new homes and other
compatible uses in accordance with the site allocation.
16.104 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density homes. It is
anticipated that higher intensity mixed-use development could be delivered as part
of the new community’s local centre and other appropriate locations across the site
where higher density homes may be appropriate.
16.105 Development must be phased to ensure the timely provision of the infrastructure
necessary to support the strategic urban extension. The potential improvements that
could be enabled and delivered through the comprehensive redevelopment of the
site are set out as part of the Vision for Bushey. These will be funded through a
combination of developer contributions (inclusive of CIL) and other sources of
funding secured in support of future growth across Bushey.
16.106 Delivery of the strategic urban extension will secure a natural landscaped boundary
that is informed by the development’s masterplan and landscape plan. Specifically,
development will provide a defensible Green Belt Boundary that maintains effective
landscape separation between Bushey Village and North Bushey and establishes a
durable boundary to retained Green Belt.
16.107 The delivery of the strategic urban extension must take account of the flood risk that
affects the site and incorporate Sustainable Drainage (SuDS) and flood risk
attenuation measures into the earliest stages of the layout. Developers should work
in partnership with the Environment Agency and engage with them early at pre-
application stage, to mitigate against potential flood risk.
16.108 Applicants are expected to work with Hertfordshire Ecology (or any successor body
following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space
provision and Biodiversity Net Gain measures incorporate the relevant actions in the
LNRS. Scotts Wood Local Wildlife Site and Local Nature Reserve must be
protected from built development and enhanced as part of the site-wide ecological
and green-infrastructure network. Important existing trees and TPO groups must be
retained and integrated into the landscape framework.
16.109 Development must safeguard National Grid and gas infrastructure, including
operational access and appropriate easements, and must not prejudice safe
operation, maintenance or future reinforcement. Developers are encouraged to
engage with relevant utility infrastructure partners to meet their requirements at an
early stage in the delivery process.
16.110 Development must conserve the significance and setting of nearby heritage assets
and address archaeological/mineral safeguarding requirements.
Development Guidance
16.111 Residential development should generally be low to medium rise and transition
sensitively to adjoining low-density neighbourhoods and retained open landscape.
16.112 Development should prioritise active travel modes over parking and vehicular access
in line with the Local Transport Plan and LCWIP proposals. Proposals should
consider network improvements towards Bushey, Watford and public transport,
including links to the LCWIP route on Park Avenue. Existing rights of way must be
retained and enhanced and opportunities should be taken to provide an additional
east-west walking route south of Hilfield Brook and improve the surrounding footpath
network. The masterplan will include a forward-facing car parking strategy that
introduces maximum standards for the site that will secure a shift towards a car-lite/
car-free future.
16.113 The long-term management and stewardship arrangements secured through
permission 24/1022/OUT must be implemented for the lifetime of the development.
Any subsequent or replacement permission must provide a 30-year stewardship
strategy, consistent with Policy HQD1(K), covering public open space, ecological
areas, SuDS, landscape, walking and cycling routes and shared community
infrastructure.