← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HBUSA8

Site allocation HBUSA8

Bushey Golf and Country Club, High Street

On pages 564 to 569 of the official PDF.

The human version

This site allocation covers Bushey Golf and Country Club on the High Street, a 12.42 ha publicly owned site that has housed leisure, commercial, events and community uses. It is allocated for residential-led mixed-use regeneration of at least 250 homes, with community and cultural facilities, compatible commercial uses and substantial publicly accessible open space. The site is defined as grey belt, and development must keep strategic separation between Bushey and Oxhey. A substantial part of the former estate must stay as permanent open space, and the project ambition is 50% genuinely affordable homes.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 564

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HBUSA8 Bushey Golf and Country Club, High Street Site Address Bushey Golf and Country Club, High Street, Bushey Site Characteristics Site Size ha Setting Ownership 12.42 ha Urban extension Public Current Uses Former Bushey Golf and Country Club. Buildings and parts of the site have subsequently accommodated leisure, commercial, events and community- related uses How Site was Identified Call for Sites (CFS-2025-149) and HELAA (HEL176) Planning Designations and Site Considerations Metropolitan Green Belt and partly previously developed land. Adjacent/near Bushey High Street and Melbourne Road Conservation Areas, Bushey Rose Garden Registered Park and Garden and multiple listed buildings. Also archaeological potential, TPOs, LNRS ACIB, sand/gravel safeguarding, limited Flood Zones 2/3 and surface-water risk. Planning Status No recent relevant planning history. Indicative Development Capacity 250 dwellings, commercial and community space Timeframe for delivery Strategic Objectives E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough J Healthy and safe communities K Securing the timely delivery of infrastructure Non-Strategic Policy Site Allocation 16.114 Bushey Golf and Country Club is allocated for comprehensive residential-led mixed-use regeneration comprising at least 250 homes during the plan period. The delivery of the site allocation will also secure new community and cultural facilities, compatible commercial uses and substantial publicly accessible open space and green infrastructure. 16.115 The Borough-wide Green Belt Assessment Stage 2 further considers the site’s contribution to the purposes of the Green Belt. It concludes that the site is defined as grey belt. The comprehensive development of the urban extension must maintain effective strategic separation between Bushey and Oxhey and establish a durable long-term Green Belt boundary. Opportunities 16.116 The site is in Council ownership and serves as one of Bushey’s principal regeneration opportunities. It includes previously developed land that is highly accessible to a variety of sustainable travel networks. Its redevelopment provides an opportunity to accommodate a mix of new housing, community and main town centre uses while retaining a significant area of the wider site as publicly accessible green space. As a publicly owned site there is an opportunity to deliver a higher proportion of new dwellings on the site as genuinely affordable homes. 16.117 The Council-led regeneration of the site can create a community and cultural focus for Bushey. Regeneration can also secure public access through the former golf course, which was not previously open to the public, strengthen connections to the High Street and establish a permanent green edge towards Oxhey. Development Requirements 16.118 Development must be planned and delivered comprehensively in accordance with Policy DM3. This requires that a site-wide masterplan be prepared demonstrating Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 how the strategic urban extension will deliver a mix of new homes and other compatible uses in accordance with the site allocation. 16.119 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It must coordinate housing, community and commercial uses, public open space, landscape, heritage, movement, infrastructure and phasing across the allocation and its relationship with the wider Country Club estate. 16.120 A substantial proportion of the former Country Club estate must be retained and secured as permanent publicly accessible open space and green infrastructure, with built development focused on parts capable of accommodating development without unacceptable Green Belt, landscape or heritage harm. Retained public open space should have a clear long-term stewardship and management arrangement securing public access, landscape quality, biodiversity and recreation. 16.121 A strong and permanent Green Belt boundary must be established along the western and south-western edge of the developed area, using Merry Hill Road, retained woodland, mature vegetation and other permanent landscape features wherever possible. The landscape framework must maintain a clear transition to the retained Green Belt and preserve effective visual and physical separation between Bushey and Watford. 16.122 As a strategic allocation, development proposals must be prepared in accordance with Policy HQD1(K) and must be supported by a site-wide Design Code prepared in alignment with the National Model Design Code, or successor guidance. The site- specific design code will be coordinated with the masterplan required by Policy DM3. 16.123 Development must be phased to ensure the timely provision of the infrastructure necessary to support the strategic urban extension. The potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site are set out as part of the Vision for Bushey. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of future growth across Bushey. 16.124 The delivery of the strategic urban extension must take account of the flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them early at pre- application stage, to mitigate against potential flood risk. 16.125 Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain measures incorporate the relevant actions in the LNRS. Existing TPO trees, woodland and important landscape features must be retained wherever practicable and integrated with habitat creation, biodiversity net gain and the LNRS ACIB. 16.126 Applicants and developers are required to carry out necessary geophysical survey and archaeological evaluation to reveal the archaeological potential of the site. 16.127 Development proposals must consider and respond positively to the significance and setting of the Bushey High Street and Melbourne Road Conservation Areas, Bushey Rose Garden Registered Park and Garden and nearby listed buildings. Masterplans prepared in support of proposals will be informed by the local heritage assets in terms of how they provide a positive response to scale, massing, landscape and architectural across the site allocation. Development Guidance 16.128 Development should provide for complementary and distinctive character areas across the strategic urban extension that link in with and complement the masterplan across this site and existing neighbourhoods to the north. The design and layout of the development should reflect and reinforce the hierarchy of streets and open/green spaces, with a differentiation in design, density, scale and massing, including a range of plot sizes and building heights, with reference to Bushey’s established character. Built development should be concentrated principally towards High Street and previously developed parts of the site, with scale and density reducing towards retained open landscape and sensitive Green Belt edges. 16.129 Residential development should generally be between two to four storeys. Localised increases in height may be used to mark important routes, spaces or community focal points where this is justified through the masterplan and heritage and townscape assessment. Buildings meeting the definition of a tall building in Policy HQD5 will not be supported, as the site is not within a Tall Building Suitability Zone. 16.130 The new main town centre uses must complement the vitality and viability of Bushey High Street. It should seek to support the community function of the new community forming on the site rather than create a competing out-of-centre destination. 16.131 Development must provide a new community hub incorporating flexible community and cultural space and make appropriate provision for arts, education and uses associated with the Council-led regeneration. 16.132 Affordable housing must be provided in accordance with Local Plan policy, with the Council-owned site expected to maximise affordable delivery. Ideally developers should seek to achieve the current project ambition of 50% genuinely affordable homes. 16.133 Developers should ensure that the new community hub is well located in relation to the site’s wider open space provision. This is to enable access to the open space and take advantage of the area around the pond to facilitate outdoor dining and events. Masterplans prepared in support of proposals should identify other suitable locations for the community hub, but in all instances it should be located close to principal walking routes. 16.134 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. Development must provide substantially improved walking/cycling permeability through the site, including connections to High Street, surrounding neighbourhoods, Bushey Station and routes towards Watford, and should investigate a new public route between High Street and Merry Hill Road. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/ car-free future.
Design & placemakingSite allocationsTransport & travel📍 Bushey📍 Watford
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.