The human version (we wrote this, not the council)
This site allocation covers Land rear of Park Avenue, east of Southgate Road, Potters Bar, a 17.4 ha publicly owned site of agricultural land. It proposes an urban extension delivering at least 260 homes, with compatible community and open space uses and walkable neighbourhoods linked by walking and cycling routes to the High Street District Centre. The site is confirmed as grey belt. Development must follow a site-wide masterplan under Policy DM3 and keep and enhance the mature field-edge trees on the southeastern boundary, which with the M25 will form a defensible Green Belt boundary.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HPBA10 Land rear of Park Avenue
Site Address Land rear of Park Avenue, Potters Bar (Land East of Southgate
Road, Potters Bar)
Site Characteristics Site Size ha Setting Ownership
17.4 ha Urban Extension Public
Current Uses Agricultural land.
How Site was Identified Call for Sites process.
Planning Designations
and Site Considerations
The M25 adjoins the southern site boundary, giving rise to
considerations around noise and air quality mitigation. There
are vehicular access limitations to the access from Southgate
Road due to proximity to M25 Junction 24. There is a small but
measurable level of surface water flood risk to the north-eastern
corner of the site. The site is subject to some surface water
flood risk, particularly around the entrance to the site off Park
Avenue. The site is within the Sand & Gravel and Drinking
Water Safeguard Areas.
Planning Status No relevant planning history
Indicative Development
Capacity
260 dwellings
Timeframe for delivery
Strategic Objectives
A Delivering a better future for Hertsmere
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
K Securing the timely delivery of infrastructure
J Healthy and safe communities
Non-strategic policy
Site Allocation
15.145 The site allocation proposes an urban extension to Potters Bar that will deliver at
least 260 homes during the plan-period. It will be comprised of comprehensive
mixed-use developments with compatible residential, community and open space
uses. It will deliver new walkable neighbourhoods with an integrated network of
walking and cycling routes, including improved active travel networks that access
Potters Bar High Street District Centre. The delivery of the urban extension will
also secure other social and community infrastructure improvements, including
proportionate investment in local public transport; public realm and environmental
enhancements. The latter is anticipated to include new public open space and
improvements for nature in line with the aims of the LNRS.
15.146 The Borough-wide Green Belt Assessment Stage 1 confirms the site’s grey belt
status. It concludes that the site (which fully-comprises sub-area PB-05) forms
only a small part of the gap between Potters Bar and Greater London and could be
developed without the loss of visual separation between the two built-up areas.
Whilst the M25 forms a strong defensible boundary to the site’s southern edge, the
trees and planting that demarcate its eastern edge must be reinforced to ensure
that the boundary remains as such in perpetuity.
Opportunities
15.147 The delivery of this urban extension provides an opportunity to create a new
successful and sustainable community located to the south of Potters Bar, within
walking distance of the High Street District Centre. It will be a walkable place, with
a diverse mix of homes, including genuinely affordable homes that are supported
by compatible education, health, community, leisure and recreation facilities. The
new neighbourhood will respond positively to the challenges of balancing growth
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
and securing a thriving economy with minimising the impacts of the climate
emergency. These new uses will be linked by a comprehensive high-quality green
and blue infrastructure network.
Development Requirements
15.148 Development must be planned and delivered comprehensively in accordance with
Policy DM3. A site-wide masterplan must be prepared demonstrating how the
urban redevelopment will deliver a mix of new homes and main town centre uses
in accordance with the site allocation.
15.149 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high-quality and higher density homes. It is
anticipated that high intensity mixed-use could be delivered as part of the new
community’s local centre and other appropriate locations across the site where
higher density homes may be appropriate.
15.150 The masterplan must consider the site and its surroundings, including the adjoining
motorway, and the element of flood risk on the site. These factors will inform the
siting and massing of built form, open space and important views.
15.151 The site has a measurable level of flood risk and will be subject to the Sequential
Test and possibly the Exception Test. If passed, sites at the higher end of the
range will require site layouts to avoid areas of flood risk.
15.152 The potential improvements that could be enabled and delivered through the
comprehensive redevelopment of the site are set out as part of the Vision for
Potters Bar. These will be funded through a combination of developer
contributions (inclusive of CIL) and other sources of funding secured in support of
Potters Bar’s regeneration.
15.153 The site will deliver space for nature, including the provision of SuDS, Biodiversity
Net Gain and urban greening in line with the relevant policies in Chapter 10 Green
and Blue Infrastructure.
Development Guidelines
15.154 The delivery of the urban extension must take account of the small but measurable
surface water flood risk that affects the site and incorporate Sustainable Drainage
(SuDS) and flood risk attenuation measures into the earliest stages of the layout.
Developers should work in partnership with the Environment Agency and engage
with them early at pre-application stage, to mitigate against potential flood risk.
15.155 The delivery of the urban extension will provide new and improved public realm
and suitable open space in accordance with a site-wide public realm strategy. This
must incorporate, retain and enhance the row of mature field-edge trees located on
the site’s southeastern boundary, which, along with the M25, will form a defensible
Green Belt boundary in the long term. The public realm strategy will also secure
the retention of existing tree and hedge cover along the southeastern edge of the
site.
15.156 Development must deliver biodiversity net gain (BNG) and enhancement of the
habitat network in line with the actions identified in the Hertfordshire Local Nature
Recovery Strategy (LNRS). Applicants are expected to work with Hertfordshire
Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife
Trust to ensure that open space provision and Biodiversity Net Gain incorporate
the relevant actions in the LNRS.
15.157 Development adjoining the M25 Motorway should consider the use of land-use
disposition, built form, landscaping and good acoustic design to address noise and
other environmental effects. Necessary acoustic measures and mitigations will be
justified and identified by appropriate and proportionate technical evidence
submitted to the decision-taking process. Developers should demonstrate that
they have undertaken engagement with National Highways.
15.158 Vehicular access from Southgate Road requires a junction that will not impact on
the safety of the existing Junction 24 of the M25. This could include access from
Park Avenue to provide a secondary access point that is outside of the area
affected by flood risk to the far eastern edge of the site.
15.159 The delivery of the site provides an opportunity to enhance the walking and cycling
provision along Southgate Road and Barnet Road/the High Street, in line with the
LCWIP.