The human version

This site allocation covers Land rear of Park Avenue, east of Southgate Road, Potters Bar, a 17.4 ha publicly owned site of agricultural land. It proposes an urban extension delivering at least 260 homes, with compatible community and open space uses and walkable neighbourhoods linked by walking and cycling routes to the High Street District Centre. The site is confirmed as grey belt. Development must follow a site-wide masterplan under Policy DM3 and keep and enhance the mature field-edge trees on the southeastern boundary, which with the M25 will form a defensible Green Belt boundary.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 499

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA10 Land rear of Park Avenue Site Address Land rear of Park Avenue, Potters Bar (Land East of Southgate Road, Potters Bar) Site Characteristics Site Size ha Setting Ownership 17.4 ha Urban Extension Public Current Uses Agricultural land. How Site was Identified Call for Sites process. Planning Designations and Site Considerations The M25 adjoins the southern site boundary, giving rise to considerations around noise and air quality mitigation. There are vehicular access limitations to the access from Southgate Road due to proximity to M25 Junction 24. There is a small but measurable level of surface water flood risk to the north-eastern corner of the site. The site is subject to some surface water flood risk, particularly around the entrance to the site off Park Avenue. The site is within the Sand & Gravel and Drinking Water Safeguard Areas. Planning Status No relevant planning history Indicative Development Capacity 260 dwellings Timeframe for delivery Strategic Objectives A Delivering a better future for Hertsmere E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency K Securing the timely delivery of infrastructure J Healthy and safe communities Non-strategic policy Site Allocation 15.145 The site allocation proposes an urban extension to Potters Bar that will deliver at least 260 homes during the plan-period. It will be comprised of comprehensive mixed-use developments with compatible residential, community and open space uses. It will deliver new walkable neighbourhoods with an integrated network of walking and cycling routes, including improved active travel networks that access Potters Bar High Street District Centre. The delivery of the urban extension will also secure other social and community infrastructure improvements, including proportionate investment in local public transport; public realm and environmental enhancements. The latter is anticipated to include new public open space and improvements for nature in line with the aims of the LNRS. 15.146 The Borough-wide Green Belt Assessment Stage 1 confirms the site’s grey belt status. It concludes that the site (which fully-comprises sub-area PB-05) forms only a small part of the gap between Potters Bar and Greater London and could be developed without the loss of visual separation between the two built-up areas. Whilst the M25 forms a strong defensible boundary to the site’s southern edge, the trees and planting that demarcate its eastern edge must be reinforced to ensure that the boundary remains as such in perpetuity. Opportunities 15.147 The delivery of this urban extension provides an opportunity to create a new successful and sustainable community located to the south of Potters Bar, within walking distance of the High Street District Centre. It will be a walkable place, with a diverse mix of homes, including genuinely affordable homes that are supported by compatible education, health, community, leisure and recreation facilities. The new neighbourhood will respond positively to the challenges of balancing growth Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 and securing a thriving economy with minimising the impacts of the climate emergency. These new uses will be linked by a comprehensive high-quality green and blue infrastructure network. Development Requirements 15.148 Development must be planned and delivered comprehensively in accordance with Policy DM3. A site-wide masterplan must be prepared demonstrating how the urban redevelopment will deliver a mix of new homes and main town centre uses in accordance with the site allocation. 15.149 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high-quality and higher density homes. It is anticipated that high intensity mixed-use could be delivered as part of the new community’s local centre and other appropriate locations across the site where higher density homes may be appropriate. 15.150 The masterplan must consider the site and its surroundings, including the adjoining motorway, and the element of flood risk on the site. These factors will inform the siting and massing of built form, open space and important views. 15.151 The site has a measurable level of flood risk and will be subject to the Sequential Test and possibly the Exception Test. If passed, sites at the higher end of the range will require site layouts to avoid areas of flood risk. 15.152 The potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site are set out as part of the Vision for Potters Bar. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of Potters Bar’s regeneration. 15.153 The site will deliver space for nature, including the provision of SuDS, Biodiversity Net Gain and urban greening in line with the relevant policies in Chapter 10 Green and Blue Infrastructure. Development Guidelines 15.154 The delivery of the urban extension must take account of the small but measurable surface water flood risk that affects the site and incorporate Sustainable Drainage (SuDS) and flood risk attenuation measures into the earliest stages of the layout. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk. 15.155 The delivery of the urban extension will provide new and improved public realm and suitable open space in accordance with a site-wide public realm strategy. This must incorporate, retain and enhance the row of mature field-edge trees located on the site’s southeastern boundary, which, along with the M25, will form a defensible Green Belt boundary in the long term. The public realm strategy will also secure the retention of existing tree and hedge cover along the southeastern edge of the site. 15.156 Development must deliver biodiversity net gain (BNG) and enhancement of the habitat network in line with the actions identified in the Hertfordshire Local Nature Recovery Strategy (LNRS). Applicants are expected to work with Hertfordshire Ecology (or any successor body following LGR) and Herts and Middlesex Wildlife Trust to ensure that open space provision and Biodiversity Net Gain incorporate the relevant actions in the LNRS. 15.157 Development adjoining the M25 Motorway should consider the use of land-use disposition, built form, landscaping and good acoustic design to address noise and other environmental effects. Necessary acoustic measures and mitigations will be justified and identified by appropriate and proportionate technical evidence submitted to the decision-taking process. Developers should demonstrate that they have undertaken engagement with National Highways. 15.158 Vehicular access from Southgate Road requires a junction that will not impact on the safety of the existing Junction 24 of the M25. This could include access from Park Avenue to provide a secondary access point that is outside of the area affected by flood risk to the far eastern edge of the site. 15.159 The delivery of the site provides an opportunity to enhance the walking and cycling provision along Southgate Road and Barnet Road/the High Street, in line with the LCWIP.
Flooding & waterSite allocationsTransport & travel📍 Barnet📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.