← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HPBA6

Site allocation HPBA6

Tesco, Potters Bar

On pages 482 to 486 of the official PDF.

The human version

This site allocation covers the Tesco site on Mutton Lane, a 2.9 ha urban site with a supermarket, car park and petrol filling station. It proposes comprehensive redevelopment delivering at least 588 homes and the re-provision of the existing foodstore, mainly in the latter years of the plan period. Homes must be high quality and include at least 20% Affordable Housing. Development must follow a site-wide masterplan under Policy DM3, link well to the High Street and neighbouring Canada Life Place, and deliver new public realm and open space.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 482

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA6 Tesco, Potters Bar Site Address Tesco, Mutton Lane, Potters Bar Site Characteristics Site Size ha 2.9 ha Setting Urban Ownership Private Current Uses The site is occupied by a supermarket and associated car park and petrol filling station. How Site was Identified Identified by the Council. Planning Designations and Site Considerations The site includes trees that are subject to TPOs. There is a degree of measurable surface water flood risk. The site lies within Drinking Water and Sand and Gravel Safeguard Areas. Planning Status No recent relevant planning history. Indicative Development Capacity 588 dwellings and reprovision of the existing food store. Timeframe for delivery Strategic Objectives B A Thriving local economy C The regeneration of Borehamwood and Potters Bar E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity K Securing the timely delivery of infrastructure J Healthy and safe communities Non-Strategic Policy Site Allocation 15.75 The allocation proposes the comprehensive redevelopment of an urban site that is currently in a single low-intensity use. The delivery of the site will secure at least 588 homes and the reprovision of the existing foodstore. It is anticipated that this will be achieved during the latter years of the plan period. 15.76 The delivery of the site allocation provides an opportunity to secure comprehensive regeneration for Potters Bar High Street District Centre. Comprehensive redevelopment will secure the reconfiguration of spaces to facilitate a street-based layout that considers the re-provided foodstore fronting Mutton Lane, and the provision of new and improved routes into and through the site, public realm and environmental enhancements. 15.77 Redevelopment of the site will apply a design-led approach that takes full account of the site’s constraints, including the surface water flood risk. The development will secure other social and community infrastructure improvements, including proportionate investment in local public transport, public realm, and environmental enhancements. The latter is anticipated to include sustainable drainage solutions, improvements for nature in line with the aims of the LNRS. Opportunities 15.78 The delivery of this urban site provides an opportunity to achieve comprehensive mixed-use redevelopment comprised of the re-provided foodstore, other active main town centre, community and employment uses at ground floor level and residential above, and the integration of the site within the regular street pattern of the area. It will include genuinely affordable homes that are supported by compatible education, health, community, leisure and recreation facilities. On-site improvements will include improved public realm, and amenity space incorporating Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 space for nature, and will respond positively to the challenges of balancing growth and securing a thriving economy with minimising the impacts of the climate emergency. Development Requirements 15.79 Development must be planned and delivered comprehensively in accordance with Policy DM3. A site-wide masterplan must be prepared demonstrating how the urban redevelopment will deliver a mix of new homes and main town centre uses in accordance with the site allocation. 15.80 Residential accommodation must be of high-quality design and include at least 20% Affordable Housing in line with Policy H3 (Genuinely affordable housing). 15.81 Development must be fully integrated with the surrounding street network to improve access and permeability through onto the High Street, with enhanced walking and cycle connections including a functional link with neighbouring Canada Life Place. This may require reconfiguration of the site layout to achieve a hierarchy of routes that clearly articulate movement across east-west and north- south corridors. 15.82 Delivery of new and improved public realm and open space in accordance with a site-wide public realm strategy that aligns with and complements the regeneration of the wider High Street District Centre and incorporates space for nature including SuDS and urban greening in line with the relevant policies in the Green and Blue Infrastructure section of this plan. 15.83 The masterplan must consider the site and its surroundings, including surface water flood risk, the two-storey houses on Mutton Lane to the west, and the relationship with the neighbouring development at Canada Life Place to the east. These factors will inform the siting and massing of built form, open space and important views. The entrance onto the site from the High Street is identified as a key location within the allocation. Development will deliver a design-led solution that respects the existing urban form and better-defines the southern entrance to the High Street District Centre. 15.84 Development will enable transformative public realm enhancements to improve connections throughout the wider town centre area. The Council has identified the potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site. These are set out as part of the Vision for Potters Bar. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of Potters Bar’s regeneration. Development must be phased to ensure the timely provision of the infrastructure necessary to support the densification of this central urban site. Development Guidelines 15.85 Existing buildings should be retained wherever possible to reduce the environmental impact of the proposals in terms of embodied carbon, however this should be balanced with the need to provide a high-quality environment within the development and its surroundings in this prominent town centre location, and to connect with the neighbouring allocation at Canada Life Place. 15.86 Development should provide a site-wide public realm strategy that aligns with and complements the regeneration of the wider High Street District Centre. 15.87 All residential units should benefit from positive aspects, orientation, daylight and ventilation, and the development should be well-integrated with the High Street District Centre. 15.88 High-quality public spaces should be created within and around the development which are addressed by positive and/or active building frontages. These should incorporate residential amenity space and play provision that addresses local shortfalls and is accessible to all, and appropriate planting for biodiversity benefit and urban greening as set out in Chapter 10 Green and Blue Infrastructure. 15.89 Development should prioritise active travel modes over parking and vehicular access in line with the Local Transport Plan and LCWIP proposals. The masterplan will include a forward-facing car parking strategy that introduces maximum standards for the site that will secure a shift towards a car-lite/car-free future. 15.90 The site has a small but measurable level of flood risk and will be subject to the Sequential and possibly the Exception Test. Developers should work in partnership with the Environment Agency and engage with them early at pre-application stage, to mitigate against potential flood risk.
Design & placemakingSite allocationsTown centres & shops📍 Borehamwood📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.