The human version (we wrote this, not the council)
This site allocation covers the Tesco site on Mutton Lane, a 2.9 ha urban site with a supermarket, car park and petrol filling station. It proposes comprehensive redevelopment delivering at least 588 homes and the re-provision of the existing foodstore, mainly in the latter years of the plan period. Homes must be high quality and include at least 20% Affordable Housing. Development must follow a site-wide masterplan under Policy DM3, link well to the High Street and neighbouring Canada Life Place, and deliver new public realm and open space.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HPBA6 Tesco, Potters Bar
Site Address Tesco, Mutton Lane, Potters Bar
Site Characteristics Site Size ha
2.9 ha
Setting
Urban
Ownership
Private
Current Uses The site is occupied by a supermarket and associated car park and
petrol filling station.
How Site was Identified Identified by the Council.
Planning Designations
and Site Considerations
The site includes trees that are subject to TPOs. There is a degree of
measurable surface water flood risk. The site lies within Drinking
Water and Sand and Gravel Safeguard Areas.
Planning Status No recent relevant planning history.
Indicative Development
Capacity
588 dwellings and reprovision of the existing food store.
Timeframe for delivery
Strategic Objectives
B A Thriving local economy
C The regeneration of Borehamwood and Potters Bar
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
K Securing the timely delivery of infrastructure
J Healthy and safe communities
Non-Strategic Policy
Site Allocation
15.75 The allocation proposes the comprehensive redevelopment of an urban site that is
currently in a single low-intensity use. The delivery of the site will secure at least
588 homes and the reprovision of the existing foodstore. It is anticipated that this
will be achieved during the latter years of the plan period.
15.76 The delivery of the site allocation provides an opportunity to secure comprehensive
regeneration for Potters Bar High Street District Centre. Comprehensive
redevelopment will secure the reconfiguration of spaces to facilitate a street-based
layout that considers the re-provided foodstore fronting Mutton Lane, and the
provision of new and improved routes into and through the site, public realm and
environmental enhancements.
15.77 Redevelopment of the site will apply a design-led approach that takes full account
of the site’s constraints, including the surface water flood risk. The development
will secure other social and community infrastructure improvements, including
proportionate investment in local public transport, public realm, and environmental
enhancements. The latter is anticipated to include sustainable drainage solutions,
improvements for nature in line with the aims of the LNRS.
Opportunities
15.78 The delivery of this urban site provides an opportunity to achieve comprehensive
mixed-use redevelopment comprised of the re-provided foodstore, other active
main town centre, community and employment uses at ground floor level and
residential above, and the integration of the site within the regular street pattern of
the area. It will include genuinely affordable homes that are supported by
compatible education, health, community, leisure and recreation facilities. On-site
improvements will include improved public realm, and amenity space incorporating
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
space for nature, and will respond positively to the challenges of balancing growth
and securing a thriving economy with minimising the impacts of the climate
emergency.
Development Requirements
15.79 Development must be planned and delivered comprehensively in accordance with
Policy DM3. A site-wide masterplan must be prepared demonstrating how the
urban redevelopment will deliver a mix of new homes and main town centre uses
in accordance with the site allocation.
15.80 Residential accommodation must be of high-quality design and include at least
20% Affordable Housing in line with Policy H3 (Genuinely affordable housing).
15.81 Development must be fully integrated with the surrounding street network to
improve access and permeability through onto the High Street, with enhanced
walking and cycle connections including a functional link with neighbouring
Canada Life Place. This may require reconfiguration of the site layout to achieve a
hierarchy of routes that clearly articulate movement across east-west and north-
south corridors.
15.82 Delivery of new and improved public realm and open space in accordance with a
site-wide public realm strategy that aligns with and complements the regeneration
of the wider High Street District Centre and incorporates space for nature including
SuDS and urban greening in line with the relevant policies in the Green and Blue
Infrastructure section of this plan.
15.83 The masterplan must consider the site and its surroundings, including surface
water flood risk, the two-storey houses on Mutton Lane to the west, and the
relationship with the neighbouring development at Canada Life Place to the east.
These factors will inform the siting and massing of built form, open space and
important views. The entrance onto the site from the High Street is identified as a
key location within the allocation. Development will deliver a design-led solution
that respects the existing urban form and better-defines the southern entrance to
the High Street District Centre.
15.84 Development will enable transformative public realm enhancements to improve
connections throughout the wider town centre area. The Council has identified the
potential improvements that could be enabled and delivered through the
comprehensive redevelopment of the site. These are set out as part of the Vision
for Potters Bar. These will be funded through a combination of developer
contributions (inclusive of CIL) and other sources of funding secured in support of
Potters Bar’s regeneration. Development must be phased to ensure the timely
provision of the infrastructure necessary to support the densification of this central
urban site.
Development Guidelines
15.85 Existing buildings should be retained wherever possible to reduce the
environmental impact of the proposals in terms of embodied carbon, however this
should be balanced with the need to provide a high-quality environment within the
development and its surroundings in this prominent town centre location, and to
connect with the neighbouring allocation at Canada Life Place.
15.86 Development should provide a site-wide public realm strategy that aligns with and
complements the regeneration of the wider High Street District Centre.
15.87 All residential units should benefit from positive aspects, orientation, daylight and
ventilation, and the development should be well-integrated with the High Street
District Centre.
15.88 High-quality public spaces should be created within and around the development
which are addressed by positive and/or active building frontages. These should
incorporate residential amenity space and play provision that addresses local
shortfalls and is accessible to all, and appropriate planting for biodiversity benefit
and urban greening as set out in Chapter 10 Green and Blue Infrastructure.
15.89 Development should prioritise active travel modes over parking and vehicular
access in line with the Local Transport Plan and LCWIP proposals. The
masterplan will include a forward-facing car parking strategy that introduces
maximum standards for the site that will secure a shift towards a car-lite/car-free
future.
15.90 The site has a small but measurable level of flood risk and will be subject to the
Sequential and possibly the Exception Test. Developers should work in partnership
with the Environment Agency and engage with them early at pre-application stage,
to mitigate against potential flood risk.