The human version (we wrote this, not the council)
This site allocation covers the Bus Garage on the High Street, a 1.2 ha publicly owned urban site currently used as a bus depot. It proposes comprehensive redevelopment delivering at least 119 homes, with compatible employment, main town centre and community uses at ground or lower level, mainly in the latter years of the plan period. Existing buildings will be demolished and the site reconfigured with a street-based layout and better routes. Development must follow a site-wide masterplan under Policy DM3 and take account of constraints, including the locally listed wall on the southern boundary.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
HPBA7 Bus Garage, High Street
Site Address Bus Garage, High Street, Potters Bar
Site Characteristics Site Size ha Setting Ownership
1.2 ha Urban Public
Current Uses The site is in use as a bus depot
How Site was Identified Identified by the Council
Planning Designations
and Site Considerations
The site is within the setting of several Grade II Listed Buildings
and adjoins a locally listed wall. The site adjoins Hollies Way
Locally Significant Employment Site. The site lies within Drinking
Water and Sand and Gravel Safeguard Areas.
Planning Status No recent relevant planning history.
Indicative Development
Capacity
119 dwellings and main town centre uses
Timeframe for delivery
Strategic Objectives
B A Thriving local economy
C The regeneration of Borehamwood and Potters Bar
E Meet the Borough’s housing needs by delivering homes for everyone
F Delivering affordable homes
G Securing a greener Borough
H Responding to the climate emergency
I Celebrating our local identity
K Securing the timely delivery of infrastructure
J Healthy and safe communities
Non-strategic policy
Site Allocation
15.91 The allocation proposes the comprehensive redevelopment of an urban site that is
currently in a single low-intensity use. The delivery of the site will secure at least
119 homes and compatible employment, main town centre uses and community
uses at ground floor/ lower level. It is anticipated that this will be achieved during
the latter years of the plan period.
15.92 Development will involve the demolition of existing buildings and reconfiguration of
the site to facilitate a street-based layout with improved routes into and through the
site. Development will deliver high-quality public realm and amenity space. The
application of the design-led approach will take full account of the constraints of
the site, including the locally listed wall to the southern boundary. The
development will secure other social and community infrastructure improvements,
including proportionate investment in local public transport, public realm, and
environmental enhancements. The latter is anticipated to include sustainable
drainage solutions, improvements for nature in line with the aims of the LNRS.
Opportunities
15.93 The delivery of this accessible urban site provides an opportunity to achieve
comprehensive mixed-use redevelopment comprised of active main town centre,
community and employment uses at ground floor level and residential above, and
the integration of the site within the regular street pattern of the area. It will include
genuinely affordable homes that are supported by compatible education, health,
community, leisure and recreation facilities. On-site improvements will include
improved public realm, and amenity space incorporating space for nature, and will
respond positively to the challenges of balancing growth and securing a thriving
economy with minimising the impacts of the climate emergency.
Year 1-5 Year 6-10 Year 11-17 Beyond Year 17
15.94 Development also provides an opportunity to secure an improved bus garage
facility that contributes to the long-term evolution of sustainable transport network
provision for the Borough and beyond. It is anticipated that the new facility will be
at another location. The Council commits to working with Transport for London
and development industry partners to secure this opportunity.
Development Requirements
15.95 Development must be planned and delivered comprehensively in accordance with
Policy DM3. A site-wide masterplan must be prepared demonstrating how the
urban redevelopment will deliver a mix of new homes and main town centre uses
in accordance with the site allocation.
15.96 The masterplan must use the design-led approach to consider how the capacity of
the site can be optimised to deliver high intensity mixed-use development with
positive frontages that address key routes and public spaces. This will incorporate
high-quality and high-density residential, active ground floor frontages in line with
the Retail and Town Centre policies, and new and improved public realm and open
space.
15.97 The masterplan must consider the site and its surroundings, including the
relationship with the wider High Street District Centre, and the significance of
nearby heritage assets including the adjoining locally listed wall. These factors will
inform the siting and massing of built form, open space and important views.
15.98 Developers must engage with and work in partnership with Transport for London
and the Council to identify, secure and deliver replacement bus garaging provision
that meets the long-term sustainable transport needs for the Borough and beyond.
15.99 The potential improvements that could be enabled and delivered through the
comprehensive redevelopment of the site are set out as part of the Vision for
Potters Bar. These will be funded through a combination of developer
contributions (inclusive of CIL) and other sources of funding secured in support of
Potters Bar’s regeneration.
15.100 Development must be fully integrated with the surrounding street network to
improve access and permeability through onto the High Street, with enhanced
walking and cycle connections between public spaces and the site’s surrounding
neighbourhoods. This will consider improved connections through the site
including the creation of new east-west connections between Parkfield Open
Space and High Street.
15.101 The site will deliver space for nature, including the provision of SuDS, Biodiversity
Net Gain and urban greening in line with the relevant policies in Chapter 10 Green
and Blue Infrastructure.
Development Guidelines
15.102 Development should provide a site-wide public realm strategy that aligns with and
complements the regeneration of the wider High Street District Centre.
15.103 All residential units should benefit from positive aspects, orientation, daylight and
ventilation, and the development should be well-integrated with the High Street
District Centre.
15.104 High-quality public spaces should be created within and around the development
which are addressed by positive and/or active building frontages. These should
incorporate residential amenity space and play provision that addresses local
shortfalls and is accessible to all, and appropriate planting for biodiversity benefit
and urban greening as set out in Chapter 10 Green and Blue Infrastructure.
15.105 Development must respond positively to heritage assets, including seeking to
enhance the setting and significance of nearby listed buildings The Green Man
Public House, High Street and Oakmere House, High Street. The locally listed wall
that runs along the southern boundary of the site should be retained and the
development should enhance its significance.
15.106 Due to the vehicle garaging, fuelling and maintenance uses present across the
site, ground surveys may be required to identify the nature and extent of possible
ground contamination and environmental pollution. Should these be encountered,
remedial works and/or mitigation measures will need to be implemented, where
necessary, in partnership with relevant bodies.
15.107 Development must avoid harm to the adjoining Locally Significant Employment
Area at Hollies Way located to the site to the north. The design of development
must include appropriate mitigation to ensure that future residents of the
development site are not impacted by existing businesses operating out of Hollies
Way, in line with the Agent of Change principle.