← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / HPBA7

Site allocation HPBA7

Bus Garage, High Street

On pages 486 to 490 of the official PDF.

The human version

This site allocation covers the Bus Garage on the High Street, a 1.2 ha publicly owned urban site currently used as a bus depot. It proposes comprehensive redevelopment delivering at least 119 homes, with compatible employment, main town centre and community uses at ground or lower level, mainly in the latter years of the plan period. Existing buildings will be demolished and the site reconfigured with a street-based layout and better routes. Development must follow a site-wide masterplan under Policy DM3 and take account of constraints, including the locally listed wall on the southern boundary.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 486

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

HPBA7 Bus Garage, High Street Site Address Bus Garage, High Street, Potters Bar Site Characteristics Site Size ha Setting Ownership 1.2 ha Urban Public Current Uses The site is in use as a bus depot How Site was Identified Identified by the Council Planning Designations and Site Considerations The site is within the setting of several Grade II Listed Buildings and adjoins a locally listed wall. The site adjoins Hollies Way Locally Significant Employment Site. The site lies within Drinking Water and Sand and Gravel Safeguard Areas. Planning Status No recent relevant planning history. Indicative Development Capacity 119 dwellings and main town centre uses Timeframe for delivery Strategic Objectives B A Thriving local economy C The regeneration of Borehamwood and Potters Bar E Meet the Borough’s housing needs by delivering homes for everyone F Delivering affordable homes G Securing a greener Borough H Responding to the climate emergency I Celebrating our local identity K Securing the timely delivery of infrastructure J Healthy and safe communities Non-strategic policy Site Allocation 15.91 The allocation proposes the comprehensive redevelopment of an urban site that is currently in a single low-intensity use. The delivery of the site will secure at least 119 homes and compatible employment, main town centre uses and community uses at ground floor/ lower level. It is anticipated that this will be achieved during the latter years of the plan period. 15.92 Development will involve the demolition of existing buildings and reconfiguration of the site to facilitate a street-based layout with improved routes into and through the site. Development will deliver high-quality public realm and amenity space. The application of the design-led approach will take full account of the constraints of the site, including the locally listed wall to the southern boundary. The development will secure other social and community infrastructure improvements, including proportionate investment in local public transport, public realm, and environmental enhancements. The latter is anticipated to include sustainable drainage solutions, improvements for nature in line with the aims of the LNRS. Opportunities 15.93 The delivery of this accessible urban site provides an opportunity to achieve comprehensive mixed-use redevelopment comprised of active main town centre, community and employment uses at ground floor level and residential above, and the integration of the site within the regular street pattern of the area. It will include genuinely affordable homes that are supported by compatible education, health, community, leisure and recreation facilities. On-site improvements will include improved public realm, and amenity space incorporating space for nature, and will respond positively to the challenges of balancing growth and securing a thriving economy with minimising the impacts of the climate emergency. Year 1-5 Year 6-10 Year 11-17 Beyond Year 17 15.94 Development also provides an opportunity to secure an improved bus garage facility that contributes to the long-term evolution of sustainable transport network provision for the Borough and beyond. It is anticipated that the new facility will be at another location. The Council commits to working with Transport for London and development industry partners to secure this opportunity. Development Requirements 15.95 Development must be planned and delivered comprehensively in accordance with Policy DM3. A site-wide masterplan must be prepared demonstrating how the urban redevelopment will deliver a mix of new homes and main town centre uses in accordance with the site allocation. 15.96 The masterplan must use the design-led approach to consider how the capacity of the site can be optimised to deliver high intensity mixed-use development with positive frontages that address key routes and public spaces. This will incorporate high-quality and high-density residential, active ground floor frontages in line with the Retail and Town Centre policies, and new and improved public realm and open space. 15.97 The masterplan must consider the site and its surroundings, including the relationship with the wider High Street District Centre, and the significance of nearby heritage assets including the adjoining locally listed wall. These factors will inform the siting and massing of built form, open space and important views. 15.98 Developers must engage with and work in partnership with Transport for London and the Council to identify, secure and deliver replacement bus garaging provision that meets the long-term sustainable transport needs for the Borough and beyond. 15.99 The potential improvements that could be enabled and delivered through the comprehensive redevelopment of the site are set out as part of the Vision for Potters Bar. These will be funded through a combination of developer contributions (inclusive of CIL) and other sources of funding secured in support of Potters Bar’s regeneration. 15.100 Development must be fully integrated with the surrounding street network to improve access and permeability through onto the High Street, with enhanced walking and cycle connections between public spaces and the site’s surrounding neighbourhoods. This will consider improved connections through the site including the creation of new east-west connections between Parkfield Open Space and High Street. 15.101 The site will deliver space for nature, including the provision of SuDS, Biodiversity Net Gain and urban greening in line with the relevant policies in Chapter 10 Green and Blue Infrastructure. Development Guidelines 15.102 Development should provide a site-wide public realm strategy that aligns with and complements the regeneration of the wider High Street District Centre. 15.103 All residential units should benefit from positive aspects, orientation, daylight and ventilation, and the development should be well-integrated with the High Street District Centre. 15.104 High-quality public spaces should be created within and around the development which are addressed by positive and/or active building frontages. These should incorporate residential amenity space and play provision that addresses local shortfalls and is accessible to all, and appropriate planting for biodiversity benefit and urban greening as set out in Chapter 10 Green and Blue Infrastructure. 15.105 Development must respond positively to heritage assets, including seeking to enhance the setting and significance of nearby listed buildings The Green Man Public House, High Street and Oakmere House, High Street. The locally listed wall that runs along the southern boundary of the site should be retained and the development should enhance its significance. 15.106 Due to the vehicle garaging, fuelling and maintenance uses present across the site, ground surveys may be required to identify the nature and extent of possible ground contamination and environmental pollution. Should these be encountered, remedial works and/or mitigation measures will need to be implemented, where necessary, in partnership with relevant bodies. 15.107 Development must avoid harm to the adjoining Locally Significant Employment Area at Hollies Way located to the site to the north. The design of development must include appropriate mitigation to ensure that future residents of the development site are not impacted by existing businesses operating out of Hollies Way, in line with the Agent of Change principle.
Site allocationsTown centres & shopsTransport & travel📍 Borehamwood📍 Potters Bar
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.