← Open Consultation: all consultations

Hertsmere Plan Explorer

Search the Hertsmere Local Plan. 692 pages, made findable.

This consultation closed at 11:59pm, Thursday 19 November 2026.

OpenConsult / Hertsmere plan / SD2

Policy SD2

Sustainable Design and Retrofitting

On pages 278 to 282 of the official PDF.

The human version

This policy requires proposals to submit a Sustainable Design Statement, in proportion to the scale of development, showing how sustainable design has been built into the design. New self-contained homes should seek to achieve the BRE Home Quality Mark. New non-residential development of 500 square metres gross floorspace or more must achieve a BREEAM New Construction rating of Excellent, unless this is shown not to be feasible. Sustainable retrofitting is encouraged using a whole building approach. Major residential refurbishment must achieve an Excellent rating under BREEAM Domestic Refurbishment, and major non-residential refurbishment an Excellent rating under BREEAM Non-Domestic Refurbishment, unless not feasible.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 278

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

SD2 Sustainable Design and Retrofitting Strategic Objectives H Responding to the climate emergency J Healthy and safe communities Strategic Policy A Proposals for development must submit a Sustainable Design Statement. This should clearly set out how the design-led approach has been used to ensure the integration of sustainable design principles, including consideration of the construction and operation phases of development. The statement should be proportionate to the nature and scale of development proposed with a sufficient level of detail to demonstrate that the relevant policy requirements have been satisfied. For major development proposals the Sustainable Design Statement should refer and complement other detailed statements including for: i. Landscape design and urban greening; ii. Nature conservation; iii. Energy use and heat risk management; iv. Air quality; v. Flood risk and water management; vi. Ground conditions; and vii. Waste reduction and the circular economy. B Proposals for new self-contained major and minor residential development should seek to achieve the BRE Home Quality Mark. Explanation 11.6 A significant step change in the design quality and environmental performance of buildings and spaces is needed to achieve the Local Plan’s strategic objectives, particularly for climate change adaptation and mitigation. Sustainable design principles should therefore be considered early in the planning and design stages and be fully integrated throughout the development process, including the construction and occupation stages. The principles cut across several topic areas within the Local Plan but are most predominant in the policies included in this section. All applicants must submit a Sustainable Design Statement explaining how the proposed development positively engages with these principles. The statement should clearly identify the need for any site-specific mitigation and demonstrate that adequate measures will be delivered and effectively implemented. C Proposals for new non-residential development of 500 square metres gross floorspace or more, including mixed-use development, must achieve an ‘Excellent’ rating under the BREEAM New Construction (Non-Domestic Buildings) 2018 scheme, or future equivalent, unless it can be demonstrated that this is not feasible. Sustainable retrofitting D The use of sustainable retrofitting measures will be encouraged and supported to improve the energy efficiency and environmental performance of housing and other buildings, as well as the quality of living spaces for their occupants. Retrofitting measures should be integrated using the ‘whole house’ or ‘whole building’ approach, which requires an understanding of how a building has been constructed, its context and all the factors affecting energy use. E Development proposals for major residential domestic refurbishment must achieve a certified ‘Excellent’ rating under the BREEAM Domestic Refurbishment 2014 scheme, or future equivalent, unless it can be demonstrated that this is not feasible. F Development proposals for major non-residential refurbishment, including mixed-use development, will be required to achieve a certified ‘Excellent’ rating under the BREEAM Non-Domestic Refurbishment scheme, or future equivalent, unless it can be demonstrated that this is not feasible. G Where planning consent is required, sustainable retrofitting measures to existing buildings and other development will be supported where other place-making objectives are demonstrably satisfied, including those that relate to the historic environment and heritage assets. 11.7 The Home Quality Mark is an established and nationally recognised standard for new housing that has been established by the Building Research Establishment. It provides an indication of the expected health and well-being benefits and environmental footprint of new residential development. All proposals for new self- contained residential development should seek to achieve the Home Quality Mark, as demonstrated through an independent assessment by a qualified assessor. Proposals are strongly recommended to achieve a minimum 3-star rating and for developers and/or agents to make the Home Quality Mark assessment publicly available, for example, as part of any promotional material. Published ratings will also assist the Council with monitoring implementation of the Local Plan policies. 11.8 Proposals for new non-residential development (including refurbishments) and non- self-contained housing will be expected to meet the Building Research Establishment Environmental Assessment Methodology (BREEAM) ‘Excellent’ standard. BREEAM provides a nationally recognised sustainable design standard for different types of development and covers a wide range of sustainability considerations. Applications for qualifying development are encouraged to submit BREEAM pre-assessments as part of the Sustainable Design Statement, identifying the credits to be targeted and measures to achieve these. All proposals will be considered having regard to individual site circumstances and the nature of development proposed. Planning contributions, such as carbon offsetting, may be sought where it is suitably demonstrated that the policy requirements cannot be sufficiently satisfied such as for reasons of technical feasibility. 11.9 For commercial and industrial uses applicants must justify that the required ‘Excellent’ rating cannot be reasonably delivered on-site, including through evidence of a BREEAM preassessment. It is recognised that for some types of developments the BREEAM requirements may pose challenges, for example, where there is no defined end-user and/or the Council has agreed that buildings require a certain level of fit out. However, our expectation is that shell only and shell and core proposals, where appropriate, should be capable of meeting the BREEAM credits considering the flexibility provided by the BREEAM methodology. 11.10 Where the Home Quality Mark or BREEAM assessments are submitted, these must be prepared by a suitably qualified and independent assessor. The Council will consider applying alternative established and recognised standards in circumstances where their application demonstrably benefits the process and results in the delivery of the set objectives. Sustainable retrofitting 11.11 Housing is a significant contributor of carbon emissions in Hertsmere, with about 24% of emissions coming from energy used within homes. Many homes in the area are poorly insulated, contributing to higher energy costs and carbon emissions. Sustainable retrofitting measures can help to improve the energy performance of existing buildings and minimise carbon emissions produced in the Borough. Even small-scale development, such as householder schemes, can incorporate measures that improve the environmental performance of buildings. This may include internal roof, floor and wall insulation, energy efficient fixtures, or urban greening. 11.12 The most appropriate type of sustainable retrofitting measures will vary depending on the type of building, its context and location, including character setting. A ‘whole house’ or ‘whole building’ approach is one that looks at the energy performance of a building in a comprehensive and integrated way. It helps to ensure that improvements are carried out in an organised, sensible order, with installations and refit measures complementing rather than working against each other. For instance, some standard retrofitting measures can cause damage to traditional or historic buildings, causing problems with trapped moisture which may reduce energy efficiency and bring risks to the health of occupants. In addition, the budget available to householders and other developers will impact on the type and amount of retrofitting works they are able to carry out. The whole house approach can be useful to inform the most appropriate and cost-effective measures, along with phasing of works delivered over a longer period. 11.13 Householders and other developers are encouraged to refer to good practice guidance when considering retrofitting. The Council encourages developers and householders to consider, and use established and recognised guidance such as the Climate Emergency Retrofit Guide published by the London Energy Transformation Initiative (LETI). Given Hertsmere’s location within London’s immediate hinterland this is relevant and appropriate guidance. 11.14 It is important that retrofitting of historic buildings is carried out in a way that does no harm to the significance of heritage assets or their setting in line with other Local Plan policies. Where heritage assets are concerned, applicants are encouraged to refer to the latest Historic England guidance on energy efficiency and retrofit to inform their proposals. Retrofitting works to the fabric of buildings and structures that form part of the statutory list are likely to require consent. Those contemplating such works should seek guidance from the local planning authority. Failure to gain an appropriate and necessary consent may result in unlawful development. Explanation 11.15 In recent years Hertfordshire has experienced higher than historic average temperatures along with more severe hot weather events. Heat risk is becoming an increasingly important issue, particularly in the context of a growing population and global climate change. 11.16 The urban heat island is experienced in places where there is extensive urban development. Hertsmere’s Local Plan spatial strategy is seeking to optimise the use of urban land supply to meet the Borough’s development needs over the plan period. Consequently, addressing the urban heat island is a matter for successful and sustainable place-making. Buildings and spaces in these areas absorb and retain heat during the day and night. In increasingly urbanised places, such as Hertsmere’s four main towns, this process results in air temperatures being several degrees warmer than its surrounding areas. The urban heat island poses a significant health risk to vulnerable groups, such as older people or those with certain health conditions, particularly during peak summer months. All new development must
Climate & energyDesign & placemakingHomes & housing
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.