The human version (we wrote this, not the council)This section is the contents page for Chapter 11, Sustainable Design. It lists twelve policies: SD1 Responding to the Climate Emergency, SD2 Sustainable Design and Retrofitting, SD3 Managing Heat Risk, SD4 Minimising Greenhouse Gas Emissions, SD5 Improving Air Quality, SD6 Energy Infrastructure, SD7 Minimising and Managing Flood Risk, SD8 Water Supply and Wastewater, SD9 Ground Conditions, SD10 Reducing and Sustainably Managing Waste, SD11 Securing a Circular Economy, and SD12 Minerals Consultation Area. Each policy is listed with a page number. The section has no policy wording itself.
OpenConsult / Hertsmere Plan Explorer
Climate & energy
Net zero, carbon reduction, renewable energy, solar farms, energy efficiency and sustainable construction.
78 sections of the plan, in document order.
The human version (we wrote this, not the council)This policy sets the Borough's overall response to the climate emergency, which the Council declared in September 2019. All development proposals must help Hertsmere become a net zero-carbon Borough, protect and improve green and open spaces, conserve biodiversity and deliver biodiversity net gain, reduce flood risk, and avoid harm to local amenity and habitats. They must also help Hertfordshire reach waste net self-sufficiency through the waste hierarchy and circular economy principles. A plan-manage-monitor approach will be used to support the move to net zero. The explanation says the Council has committed to net zero carbon emissions no later than 2050.
The human version (we wrote this, not the council)This policy requires proposals to submit a Sustainable Design Statement, in proportion to the scale of development, showing how sustainable design has been built into the design. New self-contained homes should seek to achieve the BRE Home Quality Mark. New non-residential development of 500 square metres gross floorspace or more must achieve a BREEAM New Construction rating of Excellent, unless this is shown not to be feasible. Sustainable retrofitting is encouraged using a whole building approach. Major residential refurbishment must achieve an Excellent rating under BREEAM Domestic Refurbishment, and major non-residential refurbishment an Excellent rating under BREEAM Non-Domestic Refurbishment, unless not feasible.
The human version (we wrote this, not the council)This policy sets carbon rules to help the Borough become net zero-carbon. Major development must be net zero-carbon, with an on-site cut in carbon emissions of at least 35% beyond the Part L baseline of the Building Regulations 2021 Future Home Standard, and must minimise unregulated emissions. Where net zero cannot be reached on site, developers must pay into Hertsmere's carbon offset fund or provide off-site measures. Payments use a formula with a charge of £100 per year for every tonne of CO2 offset, over an assumed 30 years. Major schemes are encouraged to assess embodied carbon, and must set out their approach in an Energy Strategy.
The human version (we wrote this, not the council)This policy covers energy infrastructure. Proposals must respond to a site-specific assessment of the most efficient energy supply options, and major schemes should engage early with energy suppliers. Development should prioritise connection to decentralised heat networks. Major development must provide a Feasibility Assessment for connecting to, or extending, nearby existing or planned heat networks, and minor new-build and conversions must show they have investigated connection. Major schemes should talk to UK Power Networks early about primary substation capacity, using measures such as microgrids where needed. Major development in Heat Network Priority Areas should have a communal low temperature heating system.
The human version (we wrote this, not the council)This policy says the Hertsmere Local Plan policies will be kept under review throughout the Plan period, using the Local Performance Indicators in Table 18.1. Progress towards delivery of the spatial strategy will be measured annually and published in the statutory Authority Monitoring Report. Development viability across the Borough will also be regularly reviewed. Where changes in land values are likely to significantly affect viability, the Council will consider reviewing strategic approaches or policies. The explanation says that if monitoring shows targets are not being met, the Council may consider contingency measures, including single-issue reviews and updates to the Local Plan.