OpenConsult / Hertsmere plan / SD4

Policy SD4

Minimising Green House Gas Emissions

On pages 284 to 287 of the official PDF.

The human version

This policy sets carbon rules to help the Borough become net zero-carbon. Major development must be net zero-carbon, with an on-site cut in carbon emissions of at least 35% beyond the Part L baseline of the Building Regulations 2021 Future Home Standard, and must minimise unregulated emissions. Where net zero cannot be reached on site, developers must pay into Hertsmere's carbon offset fund or provide off-site measures. Payments use a formula with a charge of £100 per year for every tonne of CO2 offset, over an assumed 30 years. Major schemes are encouraged to assess embodied carbon, and must set out their approach in an Energy Strategy.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 284

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

SD4 Minimising Greenhouse Gas Emissions Strategic Objectives H Responding to the climate emergency J Healthy and safe communities Strategic Policy A To help Hertsmere to become a net zero-carbon Borough development proposals must be designed to reduce greenhouse gas emissions in operation and minimise energy demand (annual and peak). B Major development proposals must be net zero-carbon and: i. Meet the minimum on-site reduction of carbon emissions of at least 35% beyond the baseline of Part L of the Building Regulations 2021 Future Home Standard; and ii. Calculate and minimise emissions from any part of the development that are not covered by Building Regulations (e.g. unregulated emissions). C Where it is clearly demonstrated that the net zero-carbon target cannot be achieved on-site, development proposals must make contributions to meet the identified shortfall through: i. A cash-in-lieu contribution to Hertsmere’s carbon offset fund. Where it can be demonstrated to the satisfaction of the Council that off-site contributions are acceptable these will be secured through planning obligations, with payments in lieu calculated using Table 11.1 (Carbon offset payments in lieu).; and/or ii. Appropriate off-site measures where these can be demonstrated to be deliverable. Table 11.1 Carbon offset payments in lieu FORMULA FOR CALCULATING PAYMENTS IN LIEU (A – B) x C) x D = X A = Target carbon emissions to meet a 35% reduction onsite B = Projected onsite contribution to carbon reductions Explanation 11.21 The Hertsmere Climate Change and Sustainability Strategy (2025 - 2030) sets the objective for the Borough to become a zero-carbon place by 2050. To meet this objective and ensure that Hertsmere becomes a net zero-carbon Borough, it will be necessary for new development to maximise energy efficiency and reduce carbon emissions. 11.22 The Borough Council has sought to meet the zero-carbon target for all major developments since 2020; by publishing the Climate Change and Sustainability Interim Planning Policy Position Statement (2020). That document sought to provide guidance based on policy available at that time. 11.23 To meet the Borough’s zero-carbon target, the Local Plan requires major developments to provide an on-site reduction of at least 35% beyond the baseline of Part L of the Building Regulations 2021 Future Home Standard. 11.24 Embodied carbon refers to the greenhouse gas emissions arising from the manufacturing, transportation, installation, maintenance and disposal of building materials. This is distinguished from operational carbon which refers to emissions C = Charge for every tonne of CO2 required to be offset to meet the target figure (Hertsmere will charge £100 per year for every tonne of CO2 to be offset) D = The assumed lifespan of the offset measures (30 years) A worked example to illustrate the above calculation: Development A has annual CO2 emissions of 100 tonnes. To meet the policy requirement the developer needs to reduce this by 35 tonnes, however the developer is only able to reduce carbon emissions by 30 tonnes onsite, which means 5 tonnes is required to be offset: ((35 – 30) x 104) x 30 = £31,200 D Major development proposals are encouraged to assess embodied carbon emissions and maximise opportunities to reduce these emissions. E Details of the approach used to meet the net zero-carbon target must be clearly set out in an Energy Strategy submitted as part of the Sustainable Design Statement. F Development proposals should minimise energy demand of the building(s) in- use by seeking to achieve the London Energy Transformation Initiative (LETI) targets for projected Energy Use Intensity (EUI). arising from building energy consumption. To help ensure that the carbon emissions are fully accounted for and minimised during the development process, applicants are encouraged to assess and address embodied emissions through the design-led approach. Good practice guidance on this element of low carbon design should be considered and referred to as part of the development process. The Council encourages the use and application of established and recognised guidance, such as that prepared by the London Energy Transformation Initiative (LETI). The Council considers that given Hertsmere’s location within London’s immediate hinterland this is relevant and appropriate guidance. 11.25 New development is expected to be net-zero carbon and where this is not feasible, it should get as close as possible to zero-carbon on-site. Off-site contributions will not normally be considered as an alternative. They will only be acceptable where it is clearly demonstrated that carbon targets cannot be fully achieved on-site. These contributions must address any identified shortfall and will be secured by planning obligations. Off-site provision will be secured through planning obligations with any payments in lieu calculated using Table 11.1. 11.26 The LETI Climate Change Design Guide sets out a roadmap to zero carbon development. It recommends the use of an Energy Use Intensity (EUI) metric. The EUI is an annual measure of the total energy consumed in a building. It is a good indicator for building performance as the metric is solely dependent on how the building performs in-use; rather than carbon emissions, which also reflect the carbon intensity of the grid. EUI can be estimated at the design stage and easily monitored in-use as energy bills are based on kilowatt hour (kWh) of energy used by the building. EUI includes all the energy consumed in the building such as regulated energy (heating, hot water, cooling, ventilation, and lighting) and unregulated energy (plug loads and equipment e.g. kitchen white goods, ICT/ AV equipment). It does not include charging of electric vehicles. Development proposals should make reasonable efforts to reduce energy consumption of buildings in-use, including by reducing space heating demand. Details should be set out in the Energy Statement, where appropriate. The EUI targets in Table 11.2 are non-binding and should be used as a guide to help future-proof development, until such time EUI targets are set out in higher level policy or Building Regulations. Table 11.2 Targets for Energy Use Intensity by Building Type 1 Building type Reduce consumption to Reduce space heating demand to Minor Residential 35 kWh/m2/year 15 kWh/m2/year Major Residential 35 kWh/m2/year Commercial Office 55 kWh/m2/year Education 65 kWh/m2/year 1 All targets are set out in kilowatt hour (kWh) per metre square (m2) per year by Gross Internal Area (GIA) and excluding renewable energy contribution. The LETI Climate Emergency Design Guide should be referred for further information.
Climate & energyDesign & placemakingHealth, schools & community
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.