The human version (we wrote this, not the council)
This policy covers energy infrastructure. Proposals must respond to a site-specific assessment of the most efficient energy supply options, and major schemes should engage early with energy suppliers. Development should prioritise connection to decentralised heat networks. Major development must provide a Feasibility Assessment for connecting to, or extending, nearby existing or planned heat networks, and minor new-build and conversions must show they have investigated connection. Major schemes should talk to UK Power Networks early about primary substation capacity, using measures such as microgrids where needed. Major development in Heat Network Priority Areas should have a communal low temperature heating system.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
SD6 Energy Infrastructure
Strategic Objectives
H Responding to the climate emergency
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Strategic Policy
A Proposals for development must be designed in response to a site-specific
assessment of the most effective and efficient energy supply options,
considering the opportunities identified through technical evidence that supports
the Local Plan. For large-scale schemes such as major developments,
applicants should engage at an early stage with the relevant energy suppliers
and bodies to establish future energy and infrastructure requirements necessary
to support the development.
B Development proposals should prioritise connection to decentralised heat
networks. Major development proposals must provide a Feasibility Assessment
for connecting to, and if possible, extending or interconnecting, existing or
planned future heat networks located on or in proximity to the site. Proposals for
minor new-build development, conversions and building alterations must
demonstrate that they have investigated and maximised opportunities to
connect to existing heat networks.
C Proposals for new major development should engage with UK Power Networks
at an early stage in the process to assess and establish whether the primary
substation network has capacity to accommodate the completed scheme.
Where capacity is demonstrably an issue, proposals should seek to incorporate
appropriate and proportionate measures, such as microgrids, to manage supply.
Such measures will be embedded into the master planning for the site and
secured through legal agreements.
D Where a decentralised heat network is planned or likely to be delivered in the
future, development proposals should be designed to enable a cost-effective
connection to it, having regard to Heat Network Priority Areas identified through
the Local Plan technical evidence base.
E Major development proposals within Heat Network Priority Areas should have a
communal low temperature heating system.
Explanation
11.36 To become a net zero-carbon Borough it will be necessary for Hertsmere to change
the way in which energy is used and supplied. This means shifting from a reliance on
natural gas as the main energy source to a wider range of low and zero-carbon and
renewable sources. Decentralised energy covers a range of technologies that do not
rely directly on the electricity transmission network or gas grid. It is expected to play
an increasingly important role in London’s energy supply. Decentralised energy is
vital to energy security and helping Hertsmere become more energy self-sufficient. It
also offers opportunities for carbon reduction as a more sustainable energy source.
11.37 Development proposals should prioritise connection to decentralised heat networks
wherever technically feasible. The Council is preparing studies to support
decentralised energy network development across the Borough. All development
proposals should refer to the Council’s latest energy masterplans and studies to
ensure that opportunities for decentralised energy are maximised.
11.38 The Hertsmere Local Area Energy Plan (LAEP) anticipates that the Borough’s
electricity primary substation network will exceed its ability to supply the growth
planned-for during the plan period. This may have an adverse impact on affordability
of new homes, and upon the industry’s ability to deliver consents in a timely manner.
This is a matter that will become more prominent during the plan period as the
nation’s energy network, and consumer demand, is electrified. To minimise these
risks, those proposing development should engage with UK Power Networks at an
early stage in the process to establish local network capacity. That process should
seek to identify appropriate and proportionate solutions that will be incorporated into
the scheme as part of the master planning process. This approach will contribute
towards the positive management of the network and ensure that individual
developments do not prejudice the delivery of the wider Local Plan.
F Development proposals for CHP and ultra-low NOx gas boiler communal or
district heating systems will only be acceptable where it is demonstrated that
other options in the heating hierarchy have been fully investigated and are not
feasible, and there will be no adverse impact on air quality. Air Quality
Assessments must include full dispersion modelling to assess impacts on nearby
receptors.
G Where CHP and ultra-low NOx gas boiler systems are acceptable in line with (E)
above, proposals should be designed in a way that enables, and does not
preclude, the decarbonisation of the site-wide communal network in the future.
H Major housing development proposals must, and all minor housing proposals
should, submit an estimated heat unit supply price (£/kWh), annual standing
charges and projected annual maintenance costs for their proposed Energy
Strategy. This should include information detailing any assumptions the
calculations are based on
11.39 All proposals for major residential and commercial development must submit a
Feasibility Assessment to fully evaluate connecting to an existing or planned future
heat network, or the opportunities for creating new networks. The assessment should
evaluate technical and financial viability and consider a range of factors included but
not restricted to capability of the network to supply part of the heat demand, location
of development and distance to network pipes, physical barriers and other
developments in the areas that may also be required to connect. For this policy, a
planned future network is one that is considered by the Council likely to be
operational within 3 years of the grant of planning permission.
11.40 All proposals for minor new-build development, extensions and alterations should
also seek to secure connection to heat networks, where this is a reasonable
possibility. Major development proposals must include an Energy Statement as part
of the Sustainable Design Statement. This should provide sufficient information to
demonstrate that feasibility has been fully investigated. Consideration of feasibility
should consider potential connections to networks both within and outside the
Borough. Where it can be suitably demonstrated that other Local Plan policy
requirements can be satisfied without the submission of this information at the
planning application stage, the Council will seek to secure this through planning
obligations or through Building Control arrangements.
11.41 In areas where there is no existing or planned district heat networks proposals should
be designed for future connection to a heat network. Designs should entail a wet
heating system, single point of connection into heating system, additional plant room
space for thermal substation and low temperature heating systems (60 degrees
Celsius or lower) to support low temperature heat networks. This will help to ensure
that connection is made more financially viable and technically feasible in future
years.
11.42 All major development proposals within Heat Network Priority Areas should have a
communal heating system served from a single energy centre, with the heat source
for the system selected in accordance with the heating hierarchy. Proposals will be
expected to demonstrate that the feasibility and viability of implementing options at
the higher end of the hierarchy have been fully investigated before considering the
use of CHP or gas boiler systems. We will refuse proposals that rely on CHP or gas
boiler systems where their use is not sufficiently justified. Where the use of an ultra-
low NOx boiler is justified, this should achieve an emissions rating of <40 mg/ kWh.
Furthermore, all such proposals must not result in any adverse impact on air quality,
in line with other Local Plan policies.
11.43 Where development proposals including CHP and ultra-low NOx gas boiler systems
are acceptable in principle, they should be designed in a way that enables, and does
not preclude, the decarbonisation of the site-wide communal network in the future.
Proposals should include information on the opportunities and potential measures in
this respect. This could include, for example, details describing how the development
could accommodate the plant space required for such decentralised energy
networks, and how the individual dwellings have been designed to enable future
connections.
11.44 Where site-wide communal and district heating systems are operational, heat and
energy service providers are encouraged to enter customer charters with domestic
and small business customers. Heat networks and communal heating systems must
be designed, constructed, commissioned and operated in accordance with
CIBSE/CABE Code of Practice CP1 or equivalent. All developments that are required
to connect to an existing or planned heat network in accordance with policy must
demonstrate in the Energy Strategy how the scheme will comply with the above
Code of Practice.
11.45 Where households and businesses are reliant on decentralised heat networks it is
important that there are clear expectations for service standards. We will encourage
the use of customer charters or publicly available right of challenge in a fair and
independent way. Such charters and ombudsmen are useful in establishing clarity on
matters such as system maintenance and end user pricing and can be particularly
helpful to more vulnerable uses (for example, those in or at risk of fuel poverty or
start-up and microbusinesses). All developments that are required to connect to an
existing or planned heat network in accordance with this policy should ensure that
the future network operator will be registered with the Heat Trust Scheme (Heat
Customer Protection Ltd.) The scheme sets out common customer service standards
and protection requirements that are comparative to regulated utilities, drawing on
legislation and good practice guidance.