This policy covers water supply and wastewater. New or expanded water supply and wastewater facilities are supported where they meet needs shown in an asset management or similar plan, avoid unacceptable harm and are built in a timely and sustainable way. Development must show that water supply and sewer networks have enough capacity, or that provision will be made before occupation. Surface and foul water systems should be separated, and mains foul drainage is preferred over non-mains drainage. Proposals should be water efficient and use SuDS. Development in a Source Protection Zone is supported only where there is no risk to groundwater, or adequate mitigation.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
SD8 Water Supply and Wastewater
Strategic Objectives
H Responding to the climate emergency
J Healthy and safe communities
K Securing the timely delivery of infrastructure
Strategic Policy
A Proposals for development for new water supply and wastewater facilities or the
expansion of existing facilities will be supported where the development:
i. Makes provision for infrastructure that is required within the Borough as
demonstrated by an asset management or similar investment plan;
ii. Will not result in an unacceptable adverse impact on the environment,
human health, public safety, amenity and local character; and
iii. Will be constructed in a timely and sustainable manner.
B Development proposals should have regard to Drainage and Wastewater
Management Plans (DWMPs) and must demonstrate that the local water supply
and public sewerage networks have adequate capacity both on and off-site to
serve demand arising from the development; or where such capacity does not
exist and there are no programmed works, arrangements are made to ensure
adequate provision prior to occupation. A Water Supply and/or Drainage
Strategy may be required to demonstrate that suitable arrangements are in
place to serve the development.
C Development proposals should ensure the separation of surface and foul water
systems, including by rectifying misconnections. Proposals should prioritise
mains foul drainage and avoid the use of non-mains drainage for foul water
disposal, particularly in Source Protection Zones. Where non-mains drainage is
proposed for foul water the most sustainable drainage options must be
implemented, as supported by a Drainage Strategy.
D Development proposals should be designed to be water efficient, reduce water
consumption and minimise pressure on the combined sewer network by
integrating SuDS and other relevant necessary measures. Planning conditions
will be applied to ensure that water efficiency standards are met.
E Development proposals within a Source Protection Zone will only be supported
where there is no risk of contamination to groundwater sources, or if a risk is
identified, it is suitably demonstrated that adequate mitigation measures will be
implemented.
F Development proposals for piled foundations must ensure that disturbances to the
ground will not lead to adverse impacts on water quality, including turbidity in the
water supply. Development proposals on or in proximity to sites with
contaminated land must not introduce new pathways for contaminants to reach
groundwater.
Figure 11.2: Groundwater Source Protection Zones
Explanation
11.59 Development sites and localities must be supported by efficient and well-functioning
sewerage and wastewater infrastructure. The Council will continue to work with its
key stakeholders, including Thames Water and other water companies, on its
Infrastructure Delivery Plan. However, the short-term nature of water companies’
investment plans means that it is not possible to identify all the infrastructure required
over the Plan period. The Local Plan is therefore supportive of new or upgraded
water supply and wastewater infrastructure where required.
11.60 Hertsmere’s towns, settlements and places are served by a mix of separate and
combined sewer systems. Sewer flooding can arise in the foul system when surface
water enters via misconnection, or where the capacity of combined systems is
exceeded. In both cases this results in surcharge of contaminated surface water.
Local water providers record reported sewer flooding incidents by postcode area, and
reference should be made to this information.
11.61 Applicants should engage with the local relevant water and sewerage undertakers,
early in the planning and design process. Where there is a capacity issue and there
are no planned capacity works or upgrades, the applicant should agree with the
infrastructure provider a programme of necessary improvements. These should be
implemented prior to occupation. A Water Supply and/or Drainage Strategy may be
required, such as for major development in areas where there are concerns about
existing infrastructure provision. This supporting information should include a detailed
model of the network capacity to determine whether mitigation is required.
11.62 New development should ensure that storm flows are attenuated or regulated into the
receiving public network through on or off-site storage. Where it is proposed to
connect to a combined public sewer, the site drainage should be separate and
combined at the final manhole nearest the boundary. Where it is proposed to
discharge to a public sewer, prior approval from Thames Water will be required.
Connections to trunk sewers should be avoided. An alternative point of connection to
a non-trunk sewer or requisition a new connection and associated pipe laying will be
required. It is the responsibility of a developer to make proper provision for surface
water drainage to ground, water courses or surface water sewer. It must not be
allowed to drain to the foul sewer as this is the major contributor to sewer flooding.
11.63 The built environment plays a significant role in the way water is consumed,
distributed and disposed of. The Environment Agency has declared the Thames
Water region to be “seriously water stressed” and this trend is likely to be
exacerbated by climate change. This policy supports wider objectives for delivering a
sustainable and secure water supply and addressing water scarcity.
11.64 New residential development must meet the standards for mains water consumption
set out in the Optional Requirement of the Building Regulations Part G. All new
residential developments (including replacement dwellings) will meet the Building
Regulation optional higher water efficiency standard of 110 litres per person per day,
using the ‘Fittings Approach’ in table 2.2 as set out in Building Regulations Part G2.
Planning conditions will be applied to new residential development to ensure that the
water efficiency standards are met. Major non-residential development must meet
BREEAM excellent standard for the ‘Wat 01’ water category, to achieve at least a
12.5% improvement over defined baseline performance standard. In addition, major
developments and high or intense water use developments (such as hotels) should
include a grey water and rainwater harvesting system, and applications must provide
robust justification where this is not considered feasible. Planning conditions will be
used to ensure water efficiency targets are met.
11.65 There are groundwater abstraction points in Hertsmere that are used for the public
water supply. The Environment Agency has identified and mapped Source Protection
Zones (SPZs) and aquifers within the Borough. Development proposals must assess
and manage risk to groundwater contamination in these areas and elsewhere across
the Borough. Proposals that present an unacceptable risk to groundwater quality will
be refused.