Policy SD8

Water Supply and Wastewater

On pages 299 to 304 of the official PDF.

The human version

This policy covers water supply and wastewater. New or expanded water supply and wastewater facilities are supported where they meet needs shown in an asset management or similar plan, avoid unacceptable harm and are built in a timely and sustainable way. Development must show that water supply and sewer networks have enough capacity, or that provision will be made before occupation. Surface and foul water systems should be separated, and mains foul drainage is preferred over non-mains drainage. Proposals should be water efficient and use SuDS. Development in a Source Protection Zone is supported only where there is no risk to groundwater, or adequate mitigation.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 299

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

SD8 Water Supply and Wastewater Strategic Objectives H Responding to the climate emergency J Healthy and safe communities K Securing the timely delivery of infrastructure Strategic Policy A Proposals for development for new water supply and wastewater facilities or the expansion of existing facilities will be supported where the development: i. Makes provision for infrastructure that is required within the Borough as demonstrated by an asset management or similar investment plan; ii. Will not result in an unacceptable adverse impact on the environment, human health, public safety, amenity and local character; and iii. Will be constructed in a timely and sustainable manner. B Development proposals should have regard to Drainage and Wastewater Management Plans (DWMPs) and must demonstrate that the local water supply and public sewerage networks have adequate capacity both on and off-site to serve demand arising from the development; or where such capacity does not exist and there are no programmed works, arrangements are made to ensure adequate provision prior to occupation. A Water Supply and/or Drainage Strategy may be required to demonstrate that suitable arrangements are in place to serve the development. C Development proposals should ensure the separation of surface and foul water systems, including by rectifying misconnections. Proposals should prioritise mains foul drainage and avoid the use of non-mains drainage for foul water disposal, particularly in Source Protection Zones. Where non-mains drainage is proposed for foul water the most sustainable drainage options must be implemented, as supported by a Drainage Strategy. D Development proposals should be designed to be water efficient, reduce water consumption and minimise pressure on the combined sewer network by integrating SuDS and other relevant necessary measures. Planning conditions will be applied to ensure that water efficiency standards are met. E Development proposals within a Source Protection Zone will only be supported where there is no risk of contamination to groundwater sources, or if a risk is identified, it is suitably demonstrated that adequate mitigation measures will be implemented. F Development proposals for piled foundations must ensure that disturbances to the ground will not lead to adverse impacts on water quality, including turbidity in the water supply. Development proposals on or in proximity to sites with contaminated land must not introduce new pathways for contaminants to reach groundwater. Figure 11.2: Groundwater Source Protection Zones Explanation 11.59 Development sites and localities must be supported by efficient and well-functioning sewerage and wastewater infrastructure. The Council will continue to work with its key stakeholders, including Thames Water and other water companies, on its Infrastructure Delivery Plan. However, the short-term nature of water companies’ investment plans means that it is not possible to identify all the infrastructure required over the Plan period. The Local Plan is therefore supportive of new or upgraded water supply and wastewater infrastructure where required. 11.60 Hertsmere’s towns, settlements and places are served by a mix of separate and combined sewer systems. Sewer flooding can arise in the foul system when surface water enters via misconnection, or where the capacity of combined systems is exceeded. In both cases this results in surcharge of contaminated surface water. Local water providers record reported sewer flooding incidents by postcode area, and reference should be made to this information. 11.61 Applicants should engage with the local relevant water and sewerage undertakers, early in the planning and design process. Where there is a capacity issue and there are no planned capacity works or upgrades, the applicant should agree with the infrastructure provider a programme of necessary improvements. These should be implemented prior to occupation. A Water Supply and/or Drainage Strategy may be required, such as for major development in areas where there are concerns about existing infrastructure provision. This supporting information should include a detailed model of the network capacity to determine whether mitigation is required. 11.62 New development should ensure that storm flows are attenuated or regulated into the receiving public network through on or off-site storage. Where it is proposed to connect to a combined public sewer, the site drainage should be separate and combined at the final manhole nearest the boundary. Where it is proposed to discharge to a public sewer, prior approval from Thames Water will be required. Connections to trunk sewers should be avoided. An alternative point of connection to a non-trunk sewer or requisition a new connection and associated pipe laying will be required. It is the responsibility of a developer to make proper provision for surface water drainage to ground, water courses or surface water sewer. It must not be allowed to drain to the foul sewer as this is the major contributor to sewer flooding. 11.63 The built environment plays a significant role in the way water is consumed, distributed and disposed of. The Environment Agency has declared the Thames Water region to be “seriously water stressed” and this trend is likely to be exacerbated by climate change. This policy supports wider objectives for delivering a sustainable and secure water supply and addressing water scarcity. 11.64 New residential development must meet the standards for mains water consumption set out in the Optional Requirement of the Building Regulations Part G. All new residential developments (including replacement dwellings) will meet the Building Regulation optional higher water efficiency standard of 110 litres per person per day, using the ‘Fittings Approach’ in table 2.2 as set out in Building Regulations Part G2. Planning conditions will be applied to new residential development to ensure that the water efficiency standards are met. Major non-residential development must meet BREEAM excellent standard for the ‘Wat 01’ water category, to achieve at least a 12.5% improvement over defined baseline performance standard. In addition, major developments and high or intense water use developments (such as hotels) should include a grey water and rainwater harvesting system, and applications must provide robust justification where this is not considered feasible. Planning conditions will be used to ensure water efficiency targets are met. 11.65 There are groundwater abstraction points in Hertsmere that are used for the public water supply. The Environment Agency has identified and mapped Source Protection Zones (SPZs) and aquifers within the Borough. Development proposals must assess and manage risk to groundwater contamination in these areas and elsewhere across the Borough. Proposals that present an unacceptable risk to groundwater quality will be refused.
Flooding & waterHomes & housingInfrastructure & utilities
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.