← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / Alvecote: settlement context

From the plan

Alvecote: settlement context

On page 121 of the official PDF.

The human version

This section describes Alvecote and the site H17, the Coal Yard on Robeys Lane (CFS153). It is a former coal sidings and wharf on the boundary with Tamworth, and still has a coal and solid fuel depot. It is previously developed land close to Alvecote Priory, Pooley Park, the canals and Alvecote Marina. The council sees a chance for live work units and flexible commercial uses linked to the canal's heritage and leisure uses. Redevelopment should use wharf or warehouse style buildings of two to three storeys, with any third storey in the roof space and frontages facing the canal.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 121

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Alvecote 14.53b Site H17 Coal Yard, Robeys Lane, Alvecote (CFS153) is a former coal sidings and wharf of the Tamworth Collier. It is also located on the boundary with Tamworth Borough Council. The site, which has previously developed land status, is home to a current coal and commercial solid fuel depot. The site’s location is close to the historic site and remains of Alvecote Priory and, it has a close relationship with the Coventry Canal/ Birmingham & Fazeley Canal, Alvecote Marina and ‘Narrow craft’ boat yard, as well as nearby historic and natural assets at Alvecote Priory and Pooley Park. The heritage and leisure use of the canal lends itself to a potential redevelopment that maximizes these links and relationships. The Council considers the site could provide a redevelopment opportunity for ‘Live Work’ units with a flexible approach to commercial uses that contribute to, benefit from and complement the Canal’s heritage and associated leisure and commercial uses. 14.53c To enhance both the site and contribute to the location, any redevelopment should utilise wharf style or warehousing style buildings and reflect the character and industrial heritage of the canal and former industrial uses. 14.53d To minimise visual impacts, buildings should be of no greater than two to three-storey, with any third storey incorporated within roof spaces, with frontages facing the canal, accessed off the existing boatyard and solid fuel depot. The design should focus on industrial heritage, brick architecture, and integrating water-facing, mixed-use spaces. Typical features of former industrial buildings including tall floor to ceiling heights, long linear building forms, cast-iron columns, beams and structural elements, repetitive window patterns and, large loading doors should be used to create features and opportunities for sympathetically designed buildings.
Heritage & characterJobs & economy📍 Alvecote📍 Coventry📍 Tamworth
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.