The human version (we wrote this, not the council)This section describes the Borough and the issues it faces. North Warwickshire is rural, with over 50 settlements and an area of 28,526 hectares. Atherstone with Mancetter, Coleshill and Polesworth with Dordon are the three market towns. The Borough sits between growing areas such as Birmingham, Coventry and Tamworth. Its economy has shifted towards logistics since the coal mines closed, and over 90% of firms employ fewer than 10 people. The M6, M42, A5 and A446 cross the Borough, as does the HS2 line. The section also covers rivers, canals, airports, minerals, MIRA Technology Park and pressure for growth from surrounding areas.
OpenConsult / North Warwickshire Plan Explorer
Jobs & economy
Employment land, offices, industry, warehousing, rural businesses, tourism and skills.
246 sections of the plan, in document order.
The human version (we wrote this, not the council)This section sets out the Spatial Vision for the Borough: Rural North Warwickshire, a community of communities. The rural character will be kept and reinforced so the Borough stays distinct from the urban areas around it. Development will be balanced and sustainable, with most of it focused on the Market Towns and Local Service Centres. The vision also covers local jobs and skills, housing choice and tenure, good design, green infrastructure, open space and sports facilities. It says important natural and historic areas and buildings will be protected and enhanced.
The human version (we wrote this, not the council)This section lists the plan's strategic objectives, which flow from the Spatial Vision. They include a sustainable pattern of development that reflects the rural character, meeting the Borough's housing needs and growing the local economy. Further objectives are maintaining the vitality of the Market Towns, promoting rural diversification, delivering high quality and inclusive design, and protecting the natural and historic environment. For each objective the plan lists how it will be achieved, such as reusing previously developed land and providing affordable housing. The section also includes a table showing which policies are strategic and which are non-strategic.
The human version (we wrote this, not the council)This policy sets out strategic gaps, which keep settlements apart and stop them merging. A traveller passing through a gap should feel they have left one settlement, crossed open land and entered another. The gaps are between Tamworth and Polesworth and Dordon, between Dordon and Baddesley and Grendon, between Grendon and Atherstone, and between Atherstone or Mancetter and Caldecote or Nuneaton. Development that significantly harms the distinct character of those settlements will not be permitted. The supporting text also covers housing and employment need, including the 364 homes a year Standard Method figure and a Strategic Gap Study that is still under way.
The human version (we wrote this, not the council)This policy sets the amount of development the council will provide for between 2025 and 2045. It provides for around 7280 new dwellings, 42 hectares of local employment land, and between 50 and 100 hectares of strategic employment land. It also provides for 38 permanent residential gypsy and traveller pitches, with 8 needed in the first five years of the plan period. The policy says the amount actually delivered will depend on the provision of infrastructure, so that developments are sustainable.
The human version (we wrote this, not the council)This section introduces the employment chapter. The council wants to work with the private sector to create lasting local jobs while protecting rural character. Hams Hall and Birch Coppice are the two largest logistics sites, both with rail freight terminals. The economy is described as fragile because it depends on a narrow range of sectors and large employers. Horiba MIRA Technology Park and UK Central are expected to bring higher skilled jobs. The section also covers skills, out-commuting, high-speed broadband, and protecting employment land. A change of use needs evidence of at least 12 months of marketing.
The human version (we wrote this, not the council)This policy aims to broaden the employment base and improve job choice for local people. All employment land is protected, including strategic uses such as recycling, reclamation, rendering, waste management and food processing. A change of use needs evidence that the site is no longer commercially viable and has been marketed for usually no less than 12 months. Established lawful businesses will be supported to expand where this causes no significant harm to the character of the area. Employment development outside development boundaries must keep the rural character, appearance and openness of the countryside.
The human version (we wrote this, not the council)This policy names the existing employment areas that support the Borough. They are Indurent Park, Hams Hall, Birch Coppice, Holly Lane, Carlyon Road, Ratcliffe Road and the Netherwood Estate, Manor Road, Coleshill Industrial Estate, Kingsbury Link, Collier's Way, Kingsbury Road and Core 42 Business Park. Within them, changes between Class E, B2 and B8 uses are permitted if harm can be mitigated. B8 uses are not permitted at Collier's Way, New Arley, or Manor Road, Mancetter. The rail freight terminals at Birch Coppice and Hams Hall are of strategic significance, and existing rail sidings elsewhere are safeguarded.
The human version (we wrote this, not the council)This policy supports rural employment. Farm diversification is supported where it helps keep the farm viable, avoids harm to traffic, noise, drainage and the surrounding environment, and does not change the primary use of the site. Re-use of rural buildings is supported where the buildings are accessible to the Main Towns and Local Service Centres, sound and permanent, adaptable without major rebuilding, and of sympathetic design. Listed and locally important buildings are treated separately. The preferred use is for rural business, with tourism and affordable housing as alternatives. The supporting text explains live/work units and names the Coal Depot at Alvecote (H17) as a site for them.
The human version (we wrote this, not the council)This policy covers small scale live/work rural employment. Permission will be granted for new live/work units, or conversions of rural buildings, that show a genuine long-term need to live at the workplace and a business plan confirming viability. Units must suit small and starter businesses, be compatible with residential use, be of high quality and sympathetic to the countryside, and be planned through a masterplan. Conditions or Section 106 agreements will tie occupation to the business, keep the commercial space in use, remove permitted development rights for full residential use and keep units available for rural enterprises.
The human version (we wrote this, not the council)This policy requires developments of over 0.5 hectares, ten units or 1000 square metres to contribute to highway improvements across the Borough. Funding is especially sought for four areas. These are the Plough Hill Road and Coleshill Road junction for Hartshill and Ansley Common, the A5 and its junctions from Dordon to Grendon and at Holly Lane, the B5000 in Polesworth, and Junction 9 of the M42 with the A446, A4097 and nearby roads. The supporting text covers lorry parking, including the allocation of 2.43 hectares north of the Moto services at Junction 10 of the M42 for around 150 lorries.
The human version (we wrote this, not the council)This policy allocates three reserve housing sites: RH9 at Hartshill (17 hectares, 300 homes), RH10 at Fillongley (1.24 hectares, 39 homes) and RH11 at Hurley (1.16 hectares, 37 homes), totalling 19.4 hectares and 376 homes. They are released only if forecast supply falls below 5.5 years and access, infrastructure or flooding issues have been addressed. The supporting text sets out Table 8 on employment land for 2025 to 2045. It shows a requirement of 42 hectares of local and 50 to 100 hectares of strategic land, and a total supply of 244.2 hectares.
The human version (we wrote this, not the council)This policy allocates employment land. In the Market Towns, E1 is 6.8 hectares at Holly Lane, Atherstone, and E2 is 5.1 hectares west of Birch Coppice, Dordon. In Category 2, E4 is 42 hectares south of Horiba MIRA Technology Park, E5 is 41.49 hectares as an extension to Indurent Park, and E6 is a 108 hectare strategic allocation at Junction 11 of the M42, No Mans Heath. The total excluding strategic land is 98.39 hectares, and including it is 206.39 hectares. The text also notes a cemetery extension in Coleshill and a lorry park at Junction 10 of the M42.
The human version (we wrote this, not the council)This section sets out the context for Atherstone with Mancetter. Atherstone is one of the three Market Towns, with a range of shops, employment areas and historic buildings, though its services are under pressure from nearby larger towns. Its two employment sites are Carlyon Road and Holly Lane, where FedEx and Aldi are based. Mancetter is seen locally as a settlement in its own right, with a conservation area. Growth is planned to the north-west, but highway capacity on the A5 is a key constraint. Site H2 will be brought forward through a Concept and Master Plan, with access over the West Coast Mainline.
The human version (we wrote this, not the council)This site allocation covers Atherstone Football Ground (H28). It will deliver at least 46 dwellings and needs the football ground to move. The preferred new location is east of Sheepy Road, north of Atherstone, with access from Sheepy Road or Royal Meadow Drive. Extra enabling housing may be allowed if site conditions permit. The site needs a detailed Flood Risk Assessment to show how much land outside the Flood Zone 3 climate change extent can be built on. Until new modelling is available, the developable area will be based on the EA Flood Zones. Ground levels may be adjusted for safe access if third party flood risk does not rise.
The human version (we wrote this, not the council)This site allocation safeguards 6.8 hectares of employment land at Holly Lane, Atherstone (E1). Aldi currently has an interest in the land. If Aldi no longer needs it, the site stays safeguarded as a long term employment site for smaller scale mixed E(g)(ii) and B2 uses. Access would be from Holly Lane and/or Abeles Way. Area A is the developable area and Area B is a semi natural buffer along Innage Brook. A Level 3 Flood Risk Assessment must show how much land lies outside flood zones 2 and 3 plus climate change freeboard.
The human version (we wrote this, not the council)This site allocation covers 1.4 hectares of allotments next to Memorial Park, Coleshill (H3). It is allocated for at least 30 dwellings. Replacement allotments are required, and policy C1 allocates about 2.5 hectares off Maxstoke Lane, south of the cemetery, for cemetery and allotment use. The text notes that Coleshill Town Council identified a need for a cemetery extension. It also covers the Coleshill Manor employment site, where a 1991 permission for up to 10,033 sq.m of offices has been affected by HS2. The council does not encourage logistics or major employment uses there.
The human version (we wrote this, not the council)This section sets out how the Borough Council will treat Coleshill Manor, an employment site in the Green Belt. It supports replacing buildings that have been demolished or cannot be built because of HS2. Office, hospitality and research and development uses are supported if they form a high quality campus style development in a landscaped parkland setting. Logistics and warehousing (Use Class B8) will not be supported. Development must keep the Green Belt open and respect the setting of the Grade II listed building. Buildings should not exceed two to three storeys. Lighting and signage must be kept modest. Land contamination from a historic landfill may need investigation.
The human version (we wrote this, not the council)This site allocation covers about 5.14 hectares of land west of Birch Coppice, south of the A5 at Dordon (E2). It is allocated for employment. Landscaping is required along the A5 and next to nearby homes. The existing allotments must be replaced, with services and infrastructure, at a location within 3/4 mile walking distance of the existing site or closer, and existing tenants must be consulted. Access should be provided through the adjoining Indurent Park site from Trinity Road. The text also notes a high pressure gas pipeline and the need to secure access to E2 through the E5 allocation.
The human version (we wrote this, not the council)This site allocation covers 41.49 gross hectares east and south of Indurent Park, Trinity Road, Dordon (E5). It is allocated for employment in Use Classes B2, B8 and Eg(iii), providing about 70,000 sq.m of floorspace, with at least one unit of at least 9,290 sq.m. A buffer of at least 200 metres must protect homes in Freasley. Access will be from Trinity Road, with contributions to M42 Junction 10 and a Transport Assessment. A link road must give lawful access to site E2 before any building is occupied. Active travel improvements and an Employment and Skills Plan are required.
The human version (we wrote this, not the council)This section describes the proposed strategic employment site near No Mans Heath, south west of Junction 11 of the M42. The site is about 108 hectares. It would meet the 50 to 100 hectares of strategic employment land that the West Midlands study indicated for the M42 corridor in North Warwickshire. It lies outside the Green Belt. National Gas Transmission infrastructure crosses part of it. The site will only be brought forward if two appeals for employment use at Junction 9 of the M42 are unsuccessful. It will include a service centre and a public transport hub, and care is needed with landscaping and building height.
The human version (we wrote this, not the council)This site allocation covers some 108 hectares west of No Man's Heath, north of the B5493, for strategic employment (E6). It includes a landscaped tree screen, retention of the Sandy Lane Spinney ancient woodland with a 15m buffer, and buildings set into the site to limit height. It must also provide a local service centre of no more than 1,000m2, lorry parking, and a transport and mobility hub. Other requirements include road improvements, drainage that protects the Mease SAC, BREEAM Excellent buildings and an Employment and Skills plan. To avoid duplicating strategic employment provision, it will only be supported if three named planning appeals on other sites are dismissed.
The human version (we wrote this, not the council)This section describes Alvecote and the site H17, the Coal Yard on Robeys Lane (CFS153). It is a former coal sidings and wharf on the boundary with Tamworth, and still has a coal and solid fuel depot. It is previously developed land close to Alvecote Priory, Pooley Park, the canals and Alvecote Marina. The council sees a chance for live work units and flexible commercial uses linked to the canal's heritage and leisure uses. Redevelopment should use wharf or warehouse style buildings of two to three storeys, with any third storey in the roof space and frontages facing the canal.
The human version (we wrote this, not the council)This site allocation covers 0.92 hectares at the Coal Yard, Robeys Lane, Alvecote (H17, CFS153). It is allocated for mixed use development with homes and employment generating uses in live work units. Industrial, commercial, retail, leisure and service uses may be included if they suit the adjoining canal, marina and boat repair facilities. Employment must follow Policy LP41. The housing element should provide at least 12 residential units that reflect the canal's industrial heritage. Homes should be no more than three storeys and have active frontages, with habitable windows and entrances facing the canal.
The human version (we wrote this, not the council)This section sets out how the Local Plan will be monitored. It says monitoring is central to making sure the plan delivers, and that neighbouring plans must also be monitored. Table 9 lists each policy with indicators and targets. Examples include a minimum of 9,598 dwellings delivered to 2033, a minimum of 100 hectares of employment land to 2033, 60 windfall dwellings a year from 2020 to 2033, and housing density of no less than 30 dwellings per hectare. The table also covers Green Belt and Strategic Gap loss, affordable housing, traveller sites and reserve housing sites. A list of appendices A to Q follows.
The human version (we wrote this, not the council)This section is Appendix C, which lists the evidence base for the Local Plan. It is a table giving a reference number, subject, report title and who prepared it with the date. Subjects include housing and employment, flood risk, gaps, Green Belt, green infrastructure, green space, Gypsy and Travellers, habitats, heritage, infrastructure and landscape. Examples are the Housing and Economic Development Needs Assessment by Iceni (November 2022), the Strategic Flood Risk Assessments by JBA Consulting, the Green Belt Study by LUC (December 2025) and the Gypsy and Traveller Accommodation Assessment by arc4 (May 2026).