Atherstone with Mancetter: settlement context

On pages 101 to 103 of the official PDF.

The human version

This section sets out the context for Atherstone with Mancetter. Atherstone is one of the three Market Towns, with a range of shops, employment areas and historic buildings, though its services are under pressure from nearby larger towns. Its two employment sites are Carlyon Road and Holly Lane, where FedEx and Aldi are based. Mancetter is seen locally as a settlement in its own right, with a conservation area. Growth is planned to the north-west, but highway capacity on the A5 is a key constraint. Site H2 will be brought forward through a Concept and Master Plan, with access over the West Coast Mainline.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 101

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Atherstone with Mancetter Atherstone 14.15 Atherstone is one of the three Market Towns within North Warwickshire and is extremely important to the vitality of the Borough as a whole It has a variety of shops, large employment areas, historical areas as well as recreational facilities, providing a wide range of services and facilities. However due to the easy access to surrounding larger towns and cities these services and facilities are constantly under pressure. 14.16 Atherstone grew as a town through its association with agriculture and because of its location in relation to Watling Street, and the canal and railway network. It continues to exhibit a distinctive character, being underpinned by its historic plan form which has medieval origins. The prosperity of the town during the 18th and 19th centuries is evidenced with its two and three storey townhouses, with Georgian facades which line Long Street and surround the Market Place/Church Square. There is a legacy of past industries, most importantly the production of felt hats, with examples of industrial buildings from the 19th century onwards Through the North Warwickshire Prosperity Fund Atherstone Impact, local firms like MAS Precision Engineering have utilized this support framework to navigate exporting regulations (like the Carbon Border Adjustment Mechanism) and establish growth succession 14.17 Atherstone has two main employment sites. The oldest of these, at Carlyon Road, was built during the 1970’s and 1980’s. It is the quality of many of the units8 that is now an issue with many of the units not standing up to modern day needs. The other site off Holly Lane is dominated by the presence of FedEx and Aldi. Land has been allocated for further expansion at this estate. The landowner now wishes to retain this land for their expansion plans. Therefore, although available, it is for a specific end user of Aldi themselves. Both estates offer redevelopment and regeneration opportunities. 8 Chesterton Report 2001 and CB Richard Ellis 2007 Mancetter 14.18 Mancetter although sharing a development boundary with Atherstone and is considered as an integral part of the Market Town in planning terms it is clearly seen, locally as a settlement in its own right with its own character. It has its own historic core formed from surviving historic buildings and with important archaeological remains dating back to the Roman period. It also has a conservation area. Mancetter has its own industrial estate offering a range of unit sizes starting from small starter units. Ridge Lane lies within the Mancetter Parish and following the adoption of the Mancetter Neighbourhood Plan has a development boundary. Housing 14.19 Previous planning documents identified that due to constraints around Atherstone growth would take place to the north-west of the town. Some development has already taken place and further applications are currently under consideration. However, one of the principal constraints to future developments, both housing and employment, is the capacity of the existing highway network and junctions feeding onto the A5 Strategic Highway network. The current problems with highway capacity and congestion at junctions feeding into the A5 also means that major development within the Atherstone and Mancetter areas, generating traffic onto the A5, will need to address the requirements of Policy LP26a, for contributions towards highway improvements along the A5. 14.20 Site H2 will be brought forward through a Concept and Master Plan to ensure the comprehensive development of the area. There are a number of heritage assets within and close to the site. In addition to the evidence prepared in support of the plan including at examination, they will require detailed assessment in respect of their significance, setting and implications of any effects. 14.21 Additional access over the West Coast Mainline will be required to open the area for development. The bridge at Whittington Lane could be utilised. Its strength will need to be investigated and, if required, work carried out to bring it up to a suitable standard or a new bridge be provided. 14.22 The site includes 1.1km of the Coventry Canal and is an attractive section for canal users. It has three bridges, one of which is listed as well as two listed locks. The canal is an important asset that can be utilised for encouraging walking and cycling for both commuting and leisure. The future concept and master planning of the site will need to consider how the canal can be improved and incorporated into the development as well as improving linkages and in particular to Atherstone town centre, whilst maintaining its popularity for canal users. 14.23 Although Atherstone has a range of service and facilities the growth of the town will place pressure on these. A full study will need to be carried out involving the local community to ascertain the exact requirements. The Borough Council will work with Homes England (Team for dealing with large planning applications in the Homes & Communities Agency), the local community and landowners to agree a Concept Plan and Master Plan for the area.
Jobs & economyTown centres & shopsTransport & travel📍 Atherstone📍 Coventry📍 Mancetter📍 Ridge Lane
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.