Chapter 1: Introduction

On pages 6 to 8 of the official PDF.

The human version

This section introduces the Local Plan. It will replace the 2021 plan, which looked ahead to 2033. This plan looks ahead to 2045, and it also gives an indication of development beyond that date. It is prepared under the legacy plan-making system and sits alongside neighbourhood plans, the County Council's waste and minerals documents and the Policies Map. It explains that the 2024 National Planning Policy Framework applies and that existing supplementary planning documents stay in use. It also covers the settlement hierarchy, cooperation with neighbouring councils, the sustainability appraisal and the council's concerns about surface mining. A review is required every five years.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 6

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

1.1 Welcome to the reviewed and revised Local Plan for North Warwickshire. 1.2 The Local Plan takes forward and will supersede the adopted North Warwickshire Local Plan 2021 (NWLP 2021) and is prepared as part of the legacy plan making system under the Planning and Compulsory Purchase Act 2004. There are also Neighbourhood Plans which when made (adopted) have policies that will impact on proposals as they form part of the Development Plan for the Borough. 1.2 A Local Plan contains planning policies to guide the development and use of land, which affect the nature of places and how they function at a strategic level as well as providing detailed policies for individual sites and applications. The NWLP 2021 sought quality sustainable development in the right place at the right time. It looked forward to 2033. This Local Plan looks forward to 2045 and continues the theme of sustainable development in the right place with the right infrastructure. The Local Plan also gives an indication of where and how development will take place beyond this time frame in order to ensure a continuous supply of land. It explains how much and what type of development there will be and where this will be located. 1.3 The policies within this Plan are interrelated and therefore the document should be read as a whole. As the Local Plan was submitted for examination on date to be inserted, the National Planning Policy Framework published on 12 December 2024 sets the relevant policy context (NPPF 2024). However, the Local Plan has looked forward to take account of, where possible, the implications of the changes to the plan making process. In addition, the County Council prepares the Waste and Minerals Local Development Documents. The first of these documents sets out sites proposed for waste development whilst the second document sets out potential sites and areas of search for new mineral development. A number of Neighbourhood Plans are currently being prepared by Parish and Town Councils with those at Arley, Austrey, Coleshill, Dordon, Hartshill, Mancetter and Fillongley, Polesworth, Nether Whitacre and Water Orton currently part of the development plan. Together these plans make up the Development Plan for the Borough. 1.4 The Minerals Core Strategy also defines Mineral Safeguarding Areas (MSAs). North Warwickshire has a number of mineral resources such as sand and gravel and coal. The North Warwickshire Coalfield covers a significant area of the Borough from Shuttington in the north-west to the boundary with Coventry to the south east. Some of the reserves identified within the coalfield are shallow and may be accessible by surface mining extraction methods. It will be necessary for non-mineral development proposed by this Local Plan to consider whether mineral resources should be extracted prior to development taking place in order not needlessly sterilising mineral resources. The environmental and social impacts of such extractions will be important considerations. The Borough Council has concerns about the potential environmental, visual and amenity impacts of extractions. In particular, before the Borough Council supports a scheme, it should be satisfied that the potential impact has been addressed and there are no viable, accessible reserves that may be sterilised or trigger the need to surface mine. 1.6 The Policies Map sits alongside this Plan which will show the detailed geographical items. The Borough Council has adopted Supplementary Planning Documents (SPD), which are Chapter 1 Introduction What is a Local Plan? listed in Appendix K and will be used, where necessary, to add more detail and give guidance on how the Council will implement specific policies in accordance with NPPF 2024, paragraph 139. SPD’s are being phased out under the new plan making system introduced under the Levelling up and Regeneration Act 2023. No new SPD’s will be prepared under the new system. Existing SPD’s will remain a material consideration in decision making until new local plans developed under the new plan making process have replaced them. As this local plan is being prepared in the old plan making system, it will not replace the existing SPD’s. 1.6a A glossary of terms is provided at Appendix A to the Plan, however in the eventuality that there are any conflicts between the terms contained therein and preceding elements of the Local Plan and national planning policy, the latter prevail. 1.7 The NWLP 2021 was shaped by consultation as is this revision. It is also guided by the settlement hierarchy. The settlement hierarchy is based on an assessment of the services, facilities and sustainability of the various settlements within the Borough. The Settlement Sustainability Assessment has been reviewed and updated. Although the scoring of settlements has changed, this has not altered the overall settlement hierarchy, and all settlements remain within the same categories as identified in the NWLP 2021. 1.8 The Borough Council is required to maintain effective co-operation with other local authorities as well as organisations and agencies to ensure the effective discussion of issues of common concern to develop sound plans. This requirement is an on-going process and does not stop with the production of a plan. The Borough Council has a proven track record in cooperating with neighbouring authorities in strategic planning matters and has been working with neighbouring authorities to consider their future development needs and if they can accommodate them. The Borough Council reached an agreement on the amount of development that could be accommodated and delivered within the Borough with agreements with the local authorities from the Coventry & Warwickshire area as well as the Greater Birmingham & Black Country area (including Tamworth). 1.9 In addition, the Borough Council continues working collaboratively with relevant authorities and bodies to refine the scale and distribution of housing and employment needs within the housing market areas and functional economic market areas in which the Borough sits, the levels that it is appropriate for the Borough to seek to accommodate, and to working collaboratively with infrastructure providers to ensure that any impacts of growth are suitably mitigated. In the event that evidence, monitoring indicators (set out below) or events identify that a significant change in provision is needed compared to that set out in the Local Plan (or the evidence upon which it is based) an early partial/ full review, depending on the issue, will be brought forward to address this. ln any event the Council is required by statute to complete a review of the plan every five years, starting from the date of adoption. Sustainability Appraisal 1.10 A Sustainability Appraisal to look at this comprehensive Plan has been undertaken to further assist with the progress of the Plan and where possible changes have been made to the Plan. However, as development pressures increase it is important to recognise that not all development will be able to be accompanied with no adverse impacts so mitigation of those Maintaining Effective Co-operation impacts will be very important considerations.
Infrastructure & utilities📍 Arley📍 Austrey📍 Coleshill📍 Dordon📍 Hartshill📍 Mancetter📍 Polesworth📍 Water Orton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.