← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire Plan Explorer

Coleshill

32 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the Local Plan. It will replace the 2021 plan, which looked ahead to 2033. This plan looks ahead to 2045, and it also gives an indication of development beyond that date. It is prepared under the legacy plan-making system and sits alongside neighbourhood plans, the County Council's waste and minerals documents and the Policies Map. It explains that the 2024 National Planning Policy Framework applies and that existing supplementary planning documents stay in use. It also covers the settlement hierarchy, cooperation with neighbouring councils, the sustainability appraisal and the council's concerns about surface mining. A review is required every five years.

The human version (we wrote this, not the council)This section describes the Borough and the issues it faces. North Warwickshire is rural, with over 50 settlements and an area of 28,526 hectares. Atherstone with Mancetter, Coleshill and Polesworth with Dordon are the three market towns. The Borough sits between growing areas such as Birmingham, Coventry and Tamworth. Its economy has shifted towards logistics since the coal mines closed, and over 90% of firms employ fewer than 10 people. The M6, M42, A5 and A446 cross the Borough, as does the HS2 line. The section also covers rivers, canals, airports, minerals, MIRA Technology Park and pressure for growth from surrounding areas.

The human version (we wrote this, not the council)This section sets out the main cross-cutting issues behind the plan. These include access to services and jobs, an ageing population, health problems and fuel costs. Flood risk is another issue, especially along the Rivers Tame, Anker, Blythe and Cole. About 2,130 veterans live in the Borough, around 4% of people aged 16 and over. The section links the plan to the council's Corporate Plan and stresses delivering infrastructure alongside growth. It lists seven qualities that make the Borough unique, including 11 Conservation Areas, over 600 listed buildings and monuments, dispersed settlements, its mining legacy, its transport links and its major employers.

The human version (we wrote this, not the council)This section explains the spatial strategy, which steers most development to the Main Towns and then through a cascade to other settlements, with very little in the countryside. Atherstone with Mancetter and Polesworth with Dordon are the Main Towns. Coleshill is also a historic Market Town, but its growth is smaller because Green Belt surrounds it. There are five Local Service Centres. About 60% of the Borough is in the Green Belt. The section also allows development on the edge of the Borough close to Tamworth and Nuneaton. All proposals must be proportionate to the size of the settlement.

The human version (we wrote this, not the council)This policy sets out the settlement hierarchy, which decides how much development goes where. Category 1 is the Market Towns of Atherstone with Mancetter, Polesworth with Dordon and Coleshill. Category 2 is settlements next to the Borough's outer boundary. Category 3 is the Local Service Centres: Baddesley with Grendon, Hartshill with Ansley Common, New and Old Arley, Kingsbury and Water Orton. Category 4 covers 13 other settlements with a development boundary, usually with sites of no more than 10 units. Category 5 is all other locations, where development is not generally acceptable apart from special cases. The supporting text also explains the Green Belt studies and the 30% extension guide.

The human version (we wrote this, not the council)This policy protects the Green Belt. Inappropriate development is harmful and should not be approved except in very special circumstances. Settlement boundaries are excluded from the Green Belt, and limited infilling is allowed within infill boundaries or where a site has built development on three or more sides. Extensions and replacement buildings are judged on their merits, using the building as it stood on 1 July 1948. For Grey Belt land, development must be in a sustainable location, include at least 50% affordable housing, not undermine the remaining Green Belt, and meet the Golden Rules on affordable housing, infrastructure and accessible green spaces.

The human version (we wrote this, not the council)This policy names the existing employment areas that support the Borough. They are Indurent Park, Hams Hall, Birch Coppice, Holly Lane, Carlyon Road, Ratcliffe Road and the Netherwood Estate, Manor Road, Coleshill Industrial Estate, Kingsbury Link, Collier's Way, Kingsbury Road and Core 42 Business Park. Within them, changes between Class E, B2 and B8 uses are permitted if harm can be mitigated. B8 uses are not permitted at Collier's Way, New Arley, or Manor Road, Mancetter. The rail freight terminals at Birch Coppice and Hams Hall are of strategic significance, and existing rail sidings elsewhere are safeguarded.

The human version (we wrote this, not the council)This policy supports the River Anker Access and Nature project, which aims to create a connected green infrastructure network, improve access to nature and strengthen links between Atherstone, Mancetter and new allocated sites. Development in Atherstone and Mancetter must show how it meets recreation, open space and green infrastructure needs, and should link directly to the project where appropriate. Where on-site provision is not feasible, contributions to off-site improvements will be secured through planning obligations. The supporting text describes the Local Nature Reserves, including Daffern's Wood, which is about 2.42 hectares.

The human version (we wrote this, not the council)This policy protects and enhances the Local Nature Reserves shown on the Policies Map. They are Dafferns Wood in New Arley, Riverside in Atherstone (proposed to be designated), Kingsbury Meadow in Kingsbury, Abbey Green Park in Polesworth and Cole End Park in Coleshill. The supporting text on green spaces says the Green Space Strategy found there were enough green spaces in the Borough, but that their quality needed to improve. The Local Green Spaces designated in the 2021 plan are maintained in this review.

The human version (we wrote this, not the council)This policy lists the Biodiversity Net Gain sites that will be supported and protected, and towards which credits can be directed. Three are active: land at Kingsbury Link, the Wood End Habitat Bank and the Packington Estate Rewilding Plan. Eight are potential sites, including Riverside in Atherstone, Cole End Park, Mancetter Quarry and the former Purley Chase Golf Course, Daffern's Wood, Kingsbury Meadow and Abbey Green Park. Major developments near these sites must avoid, minimise and address harm. The supporting text describes the 96 hectare Mancetter Quarry and a possible country park of about 170 hectares.

The human version (we wrote this, not the council)This policy covers services and facilities in town and neighbourhood centres. Neighbourhood Centres are defined at Browns Lane and New Street in Dordon, Jubilee Court in Kingsbury, Station Buildings in Water Orton, and 82 to 102 Coleshill Road in Hartshill. Loss of Class E units is only supported if there is no reasonable prospect of retention and an alternative retail or community use takes over. Hot food takeaways and betting shops are restricted. Loss of other services needs an equivalent elsewhere or evidence they are no longer needed. Major developments must contribute land or money for services.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport gives access to services, jobs and training, and the plan seeks to improve public transport between the Market Towns, Local Service Centres and villages. It notes the traffic effects of HS2 and the new NEC station, and the benefits and disturbance from Birmingham Airport. A Strategic Transport Assessment is being updated for the plan. Major developments must support public transport improvements, such as services to Birch Coppice and Hams Hall. Level crossings need early talks with Network Rail. The North Warwickshire Area Strategy 2026 sets out long-term transport improvements.

The human version (we wrote this, not the council)This policy requires Transport Assessments, sized to the scale of development, with the indicative thresholds in Appendix G. They are also needed for cumulative effects or where the local network is inadequate. Assessments must cover local and strategic roads, level crossings and rural lanes to avoid rat running, and must set out mitigation and highway contributions. Travel Plans must accompany them, link to existing road, cycle and footpath networks and encourage public and shared transport. They are secured by conditions or Section 106. The supporting text describes the rail network, including the four stations at Atherstone, Polesworth, Coleshill Parkway and Water Orton.

Policy LP24

Stations

pp. 75–76

The human version (we wrote this, not the council)This policy supports improvements at railway stations. Land next to the Atherstone station car park, alongside platform 1, is safeguarded for a car and cycle park extension. Other measures include improved services and pedestrian access between platforms at Atherstone, more parking at Coleshill Parkway, and improved facilities at Polesworth, or a new Parkway station south of it if that is not feasible. The site for a new Kingsbury station is safeguarded, and services at Water Orton are supported. Contributions will be sought under LP1. The supporting text also covers HS2, and says pressure for development around the new NEC station will be resisted.

The human version (we wrote this, not the council)This policy covers strategic road improvements. The outcome of the A5 study becomes a material consideration for development affecting the A5, and the council will work with agencies on its dualling. Land north of Grendon through Site RH1 will be protected so dualling can take place. Once dualled, Watling Street through Grendon will be downgraded where possible, with walking and cycling encouraged. Dualling of the A446 over the River Tame will be sought. The supporting text says the A5 and the Plough Hill Road and Coleshill Road junction need improvements, and that developments will pay a transport infrastructure tariff.

The human version (we wrote this, not the council)This policy requires developments of over 0.5 hectares, ten units or 1000 square metres to contribute to highway improvements across the Borough. Funding is especially sought for four areas. These are the Plough Hill Road and Coleshill Road junction for Hartshill and Ansley Common, the A5 and its junctions from Dordon to Grendon and at Holly Lane, the B5000 in Polesworth, and Junction 9 of the M42 with the A446, A4097 and nearby roads. The supporting text covers lorry parking, including the allocation of 2.43 hectares north of the Moto services at Junction 10 of the M42 for around 150 lorries.

The human version (we wrote this, not the council)This policy requires dedicated lorry parking on all employment-related sites, with welfare facilities and security as appropriate. Expansion of existing authorised lorry parks is supported if it fits the local environment. New facilities should provide for alternative fuel vehicles and fire management measures, a small amenity building with showers and toilets open every day, monitored CCTV, low focused lighting and a layout allowing vehicles to leave in forward gear. They must not harm the road network, homes, landscape or wildlife. The text also covers walking and cycling, including the Northern Warwickshire Cycleway of about 35 miles.

The human version (we wrote this, not the council)This policy covers water and flood risk management. Development must not harm the ecological status of a waterbody, and should look at de-culverting and river restoration. Runoff must be no more than greenfield rates, using SuDS, or at least a 50% reduction where that is not possible. In Flood Zone 3 there must be floodplain compensation, an 8m set back from main rivers, and floor levels 600mm above the flood level. A Water Statement must show adequate sewerage. New homes must achieve no more than 100 litres per person per day. Large non-residential buildings must reach at least 4 BREEAM water credits. The text also begins the parking section.

The human version (we wrote this, not the council)This policy allocates sites for housing, totalling 5106 homes, as at 1 April 2025. In the Market Towns, H2 north-west of Atherstone (71.2 hectares, 1280 homes) and H4 east of Polesworth and Dordon (160.8 hectares, 1500 homes) are the largest. Other sites include H12, H13 and H28 in Atherstone, H3 in Coleshill and H15 in Dordon. Further sites are listed for settlements next to the Borough boundary, Local Service Centres such as Baddesley and Grendon, Hartshill, Kingsbury and Water Orton, and Category 4 settlements such as Austrey, Hurley, Warton and Wood End. The note says 1500 homes of H4 are to be delivered in the plan period.

The human version (we wrote this, not the council)This policy allocates three reserve housing sites: RH9 at Hartshill (17 hectares, 300 homes), RH10 at Fillongley (1.24 hectares, 39 homes) and RH11 at Hurley (1.16 hectares, 37 homes), totalling 19.4 hectares and 376 homes. They are released only if forecast supply falls below 5.5 years and access, infrastructure or flooding issues have been addressed. The supporting text sets out Table 8 on employment land for 2025 to 2045. It shows a requirement of 42 hectares of local and 50 to 100 hectares of strategic land, and a total supply of 244.2 hectares.

The human version (we wrote this, not the council)This policy allocates employment land. In the Market Towns, E1 is 6.8 hectares at Holly Lane, Atherstone, and E2 is 5.1 hectares west of Birch Coppice, Dordon. In Category 2, E4 is 42 hectares south of Horiba MIRA Technology Park, E5 is 41.49 hectares as an extension to Indurent Park, and E6 is a 108 hectare strategic allocation at Junction 11 of the M42, No Mans Heath. The total excluding strategic land is 98.39 hectares, and including it is 206.39 hectares. The text also notes a cemetery extension in Coleshill and a lorry park at Junction 10 of the M42.

The human version (we wrote this, not the council)This site allocation allocates 71.2 hectares north-west of Atherstone, off Whittington Lane, for at least 1280 dwellings. Development must follow a Concept and Master Plan agreed by the Borough Council. Area A is the developable area and Area B is for open space and landscaping, subject to a Level 3 Flood Risk Assessment. Requirements include protecting heritage assets such as Merevale Hall and the Coventry Canal, turning Whittington and Whitley Farms into a service centre, and land and money for health and education. They also include access from the A5, access over the West Coast Mainline, walking and cycling links, and archaeological recording.

The human version (we wrote this, not the council)This section describes Coleshill, one of the three Market Towns, in the west of the Borough. It has a wide range of services, a historic core with many listed buildings and two conservation areas, and Coleshill Parkway station, open since 2008. It is surrounded by Green Belt. Growth in recent plans was limited to land inside the development boundary and has been minimal. The council therefore considers it necessary to allocate land outside the boundary and remove it from the Green Belt. A housing site is proposed on allotments next to Memorial Park, with access through the former police station site.

The human version (we wrote this, not the council)This site allocation covers 1.4 hectares of allotments next to Memorial Park, Coleshill (H3). It is allocated for at least 30 dwellings. Replacement allotments are required, and policy C1 allocates about 2.5 hectares off Maxstoke Lane, south of the cemetery, for cemetery and allotment use. The text notes that Coleshill Town Council identified a need for a cemetery extension. It also covers the Coleshill Manor employment site, where a 1991 permission for up to 10,033 sq.m of offices has been affected by HS2. The council does not encourage logistics or major employment uses there.

The human version (we wrote this, not the council)This section sets out how the Borough Council will treat Coleshill Manor, an employment site in the Green Belt. It supports replacing buildings that have been demolished or cannot be built because of HS2. Office, hospitality and research and development uses are supported if they form a high quality campus style development in a landscaped parkland setting. Logistics and warehousing (Use Class B8) will not be supported. Development must keep the Green Belt open and respect the setting of the Grade II listed building. Buildings should not exceed two to three storeys. Lighting and signage must be kept modest. Land contamination from a historic landfill may need investigation.

The human version (we wrote this, not the council)This section describes Hartshill with Ansley Common, one of the five Local Service Centres. It has a large secondary school, a large junior school and an infant school, and needs investment in the schools and access. There has been much housing growth in 40 years, and there is potential for more on previously developed and greenfield sites. Highway capacity is a main constraint, including the Plough Hill Road and Coleshill Road junction. Major development must meet Policy LP26a. The area has a long history of mineral extraction. About 30 hectares at Church Road was proposed for housing, and quarrying continues at Hartshill Quarry until 21 February 2042.

The human version (we wrote this, not the council)This site allocation covers 17.2 hectares south of Coleshill Road, Ansley Common (H10). It is allocated for housing, with at least 450 dwellings expected in the plan period. Development must be comprehensive with site H32 and follow an agreed Concept and Master Plan. Requirements include improvements and a contribution to the Plough Hill Road and Coleshill Road junction, affordable and market housing, cycle and footpath links, health and education facilities, and better sports ground and allotments. The setting of Brett's Hall must be considered, a drainage strategy prepared, and a minimum 15m buffer kept to Brett's Wood ancient woodland.

The human version (we wrote this, not the council)This section describes Shustoke, a small village north east of Coleshill. Shustoke Reservoir, built to store water from the River Bourne, is run by Severn Trent Water and used for leisure and walking. The village is surrounded by Green Belt. Land south of Back Lane (CFS091A) is allocated next to Green Farm, whose farmhouse and barns are Grade II listed, so a Heritage Impact Assessment is required. The site is classed as Grey Belt in the December 2025 Green Belt Study and a strong southern boundary is needed. Access must be via The Green onto Church Road (B4114), because Back Lane is too narrow.

The human version (we wrote this, not the council)This section sets out how the Local Plan will be monitored. It says monitoring is central to making sure the plan delivers, and that neighbouring plans must also be monitored. Table 9 lists each policy with indicators and targets. Examples include a minimum of 9,598 dwellings delivered to 2033, a minimum of 100 hectares of employment land to 2033, 60 windfall dwellings a year from 2020 to 2033, and housing density of no less than 30 dwellings per hectare. The table also covers Green Belt and Strategic Gap loss, affordable housing, traveller sites and reserve housing sites. A list of appendices A to Q follows.

The human version (we wrote this, not the council)This section is Appendix A, a glossary of key planning terms. It explains commonly used or particularly important terms to help people using the plan avoid misunderstandings. The text says that some terms have a legal definition and that the glossary cannot override it. Entries run in alphabetical order from Affordable Housing, Annual Monitoring Report and AONB to Viability. They include a definition of travelling showpeople and a note that there are no Areas of Outstanding Natural Beauty in North Warwickshire. The page footer gives the document as the North Warwickshire Local Plan Final Draft Pre-submission, September 2026.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.