← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / H12

Site allocation H12

East of Coventry Canal and south of Merevale Road

On pages 104 to 105 of the official PDF.

The human version

This site allocation covers about 1.3 hectares of land east of the Coventry Canal and south of Merevale Road in Atherstone (CFS058). It is allocated for at least 41 dwellings. Proposals must reduce ecological impacts on the potential Local Wildlife Site east of Thorn Spinney. They must improve the canal towpath and add safe walking and cycling links. The canal's function must be protected. Buildings should face and overlook the canal and be of high quality design. Designs should draw on nearby historic buildings, for example red brick, Flemish bond brickwork, segmental arches and bay windows.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 104

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

H12 East of Coventry Canal and south of Merevale Road (CFS058) A site of approximately 1.3 hectares, comprising land to the north of Merevale Allotments and land to the west of the Coventry Canal, is allocated for residential development for at least 41 dwellings. Development proposals for the site will be required to: • Mitigate ecological impacts on the potential Local Wildlife Site (Grassland east of Thorn Spinney); and, • Provide improvements and accessibility to the Atherstone Canal towpath. There will be the provision of safe, direct and attractive pedestrian and cycle links to the wider network in Atherstone; and, • Safeguard the function of the canal and ensure that its operation, maintenance, structural integrity, navigation, and recreational use are not adversely affected • Respond positively and sensitively to the canal side setting by providing active frontages which overlook the canal, enhance natural surveillance and contribute to the character of the canal. The development must ensure the function of the canal is safeguarded; and, • Deliver a high standard design which reflects the character of the area. Development proposals must draw on the scale, form, layout and the materials of the surrounding historic buildings. This should include, where appropriate, the use red brick, Flemish bond brickwork, segmental arches, and bay windows. Where there is a deviation from the surrounding materials, this should be justified. 14.23d H13 is a canal side location at Atherstone Lock, adjacent to Bridge House Close (CFS030). The Council recognises that the canal system in Atherstone has a long history and was an important part of the local industry. Therefore, it is important to retain this historical link. The canal also remains a vital leisure route in Atherstone. As the canal is a sensitive asset and represents a critical part of the Borough’s history, development here offers an opportunity to enhance the canal and provide a high-quality living environment. As above, the scale of structures and buildings along the canal are generally small scale. The scale of new development should therefore be consistent with this and should not harm existing views to, or from, the Canal. As a guide, buildings should not exceed three domestic stories. Encroachment of the canal will influence its character, which may have a negative impact on its use. The policy therefore seeks to ensure that future development can become a sympathetic focal point. The requirements of the policy are included to prevent development which turns its back on the canal.
Design & placemakingSite allocationsTransport & travel📍 Atherstone📍 Coventry📍 Merevale
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.