← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire Plan Explorer

Site allocations

The specific sites the plan proposes to allocate for development, and what each allocation requires.

288 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy protects the Green Belt. Inappropriate development is harmful and should not be approved except in very special circumstances. Settlement boundaries are excluded from the Green Belt, and limited infilling is allowed within infill boundaries or where a site has built development on three or more sides. Extensions and replacement buildings are judged on their merits, using the building as it stood on 1 July 1948. For Grey Belt land, development must be in a sustainable location, include at least 50% affordable housing, not undermine the remaining Green Belt, and meet the Golden Rules on affordable housing, infrastructure and accessible green spaces.

The human version (we wrote this, not the council)This policy sets requirements for new housing development. Schemes must provide a mix of types and tenures, including homes for people with mobility issues, older people and young people. Independent living units for the over 55s are encouraged, with bungalows on sites over 25 units. Serviced self-build plots must be offered where the register shows demand, and unsold plots can be built as general housing after 12 months. Major developments should provide about 10% special needs housing. Net density must be at least 30 dwellings per hectare, 35 on allocations, and 50 or more in and around town centres.

The human version (we wrote this, not the council)This policy sets affordable housing requirements. All major developments must provide at least 30% affordable housing on site, rising to 40% on greenfield sites that were previously in agricultural use. A payment instead of on-site homes may be considered only if there is clear evidence, it can be delivered elsewhere and it is broadly equivalent. On sites of over 100 dwellings, land may be gifted to the Borough Council instead. Lower provision needs a viability appraisal. Fragmented sites are treated as part of the larger whole. The tenure mix should be about 85% affordable rent and 15% intermediate where practicable.

The human version (we wrote this, not the council)This section introduces the allocations chapter and explains housing supply. Supply is made up of completions, commitments, windfalls and new allocations. The council must keep a five-year supply, with a 5% buffer. Government's method raises the Borough's need from 237 to 364 homes a year. Table 7 sets a requirement of 7280 homes plus a 5% buffer, giving 7644. Planning permissions provide 1092 and windfall 1360, leaving 5192 to allocate. Allocations total 5106, and if all sites, pipeline and windfall came forward, completions would reach 7934 by 2045.

The human version (we wrote this, not the council)This policy allocates sites for housing, totalling 5106 homes, as at 1 April 2025. In the Market Towns, H2 north-west of Atherstone (71.2 hectares, 1280 homes) and H4 east of Polesworth and Dordon (160.8 hectares, 1500 homes) are the largest. Other sites include H12, H13 and H28 in Atherstone, H3 in Coleshill and H15 in Dordon. Further sites are listed for settlements next to the Borough boundary, Local Service Centres such as Baddesley and Grendon, Hartshill, Kingsbury and Water Orton, and Category 4 settlements such as Austrey, Hurley, Warton and Wood End. The note says 1500 homes of H4 are to be delivered in the plan period.

The human version (we wrote this, not the council)This policy allocates three reserve housing sites: RH9 at Hartshill (17 hectares, 300 homes), RH10 at Fillongley (1.24 hectares, 39 homes) and RH11 at Hurley (1.16 hectares, 37 homes), totalling 19.4 hectares and 376 homes. They are released only if forecast supply falls below 5.5 years and access, infrastructure or flooding issues have been addressed. The supporting text sets out Table 8 on employment land for 2025 to 2045. It shows a requirement of 42 hectares of local and 50 to 100 hectares of strategic land, and a total supply of 244.2 hectares.

The human version (we wrote this, not the council)This policy allocates employment land. In the Market Towns, E1 is 6.8 hectares at Holly Lane, Atherstone, and E2 is 5.1 hectares west of Birch Coppice, Dordon. In Category 2, E4 is 42 hectares south of Horiba MIRA Technology Park, E5 is 41.49 hectares as an extension to Indurent Park, and E6 is a 108 hectare strategic allocation at Junction 11 of the M42, No Mans Heath. The total excluding strategic land is 98.39 hectares, and including it is 206.39 hectares. The text also notes a cemetery extension in Coleshill and a lorry park at Junction 10 of the M42.

The human version (we wrote this, not the council)This site allocation allocates 71.2 hectares north-west of Atherstone, off Whittington Lane, for at least 1280 dwellings. Development must follow a Concept and Master Plan agreed by the Borough Council. Area A is the developable area and Area B is for open space and landscaping, subject to a Level 3 Flood Risk Assessment. Requirements include protecting heritage assets such as Merevale Hall and the Coventry Canal, turning Whittington and Whitley Farms into a service centre, and land and money for health and education. They also include access from the A5, access over the West Coast Mainline, walking and cycling links, and archaeological recording.

The human version (we wrote this, not the council)This site allocation covers about 1.3 hectares of land east of the Coventry Canal and south of Merevale Road in Atherstone (CFS058). It is allocated for at least 41 dwellings. Proposals must reduce ecological impacts on the potential Local Wildlife Site east of Thorn Spinney. They must improve the canal towpath and add safe walking and cycling links. The canal's function must be protected. Buildings should face and overlook the canal and be of high quality design. Designs should draw on nearby historic buildings, for example red brick, Flemish bond brickwork, segmental arches and bay windows.

The human version (we wrote this, not the council)This site allocation covers 0.26 hectares at Atherstone Lock, next to Bridge House Close (CFS030). It is allocated for at least 9 dwellings. Development must respond to the canal and lock setting and have an active frontage onto the canal, with entrances and habitable room windows facing it. Blank elevations, blank walls and high boundary treatments next to the canal will not be supported, and boundaries there should be visually permeable. A pedestrian and cycle connection must be provided via Minions Close. The supporting text notes that Atherstone Football Ground was previously reserve allocation RH3 in the NWLP 2021 and needs a replacement ground.

The human version (we wrote this, not the council)This site allocation covers Atherstone Football Ground (H28). It will deliver at least 46 dwellings and needs the football ground to move. The preferred new location is east of Sheepy Road, north of Atherstone, with access from Sheepy Road or Royal Meadow Drive. Extra enabling housing may be allowed if site conditions permit. The site needs a detailed Flood Risk Assessment to show how much land outside the Flood Zone 3 climate change extent can be built on. Until new modelling is available, the developable area will be based on the EA Flood Zones. Ground levels may be adjusted for safe access if third party flood risk does not rise.

The human version (we wrote this, not the council)This site allocation safeguards 6.8 hectares of employment land at Holly Lane, Atherstone (E1). Aldi currently has an interest in the land. If Aldi no longer needs it, the site stays safeguarded as a long term employment site for smaller scale mixed E(g)(ii) and B2 uses. Access would be from Holly Lane and/or Abeles Way. Area A is the developable area and Area B is a semi natural buffer along Innage Brook. A Level 3 Flood Risk Assessment must show how much land lies outside flood zones 2 and 3 plus climate change freeboard.

The human version (we wrote this, not the council)This site allocation covers 1.4 hectares of allotments next to Memorial Park, Coleshill (H3). It is allocated for at least 30 dwellings. Replacement allotments are required, and policy C1 allocates about 2.5 hectares off Maxstoke Lane, south of the cemetery, for cemetery and allotment use. The text notes that Coleshill Town Council identified a need for a cemetery extension. It also covers the Coleshill Manor employment site, where a 1991 permission for up to 10,033 sq.m of offices has been affected by HS2. The council does not encourage logistics or major employment uses there.

The human version (we wrote this, not the council)This site allocation covers land east of Polesworth and Dordon between the A5 and B5000 (H4). It is allocated for a minimum of 1500 homes. A Masterplan Framework and Design Guide for the whole site must be approved by the Borough Council before permission is granted. Requirements include about 11 hectares for a primary school and a secondary school, a retail and health focal point, walking and cycling routes, new A5 access and north to south road links to the B5000. Heritage assets such as Dordon Hall must be assessed. Green infrastructure must protect local wildlife sites, with a buffer of at least 15 metres around ancient woodland.

The human version (we wrote this, not the council)This site allocation covers Dordon Hall Barns (H15, CFS108). It is allocated for at least 13 dwellings. The existing agricultural buildings must be kept and sensitively converted to homes. Proposals must show they preserve and enhance the setting of Dordon Hall Farm, a Grade II listed building next to the site, and must be informed by a Heritage Impact Assessment. Conversion works and extensions must keep the original agricultural scale, form and layout, and use matching materials and detailing. Proposals must avoid over domestication of the buildings, such as excessive glazing, standard window patterns and prominent roof lights.

The human version (we wrote this, not the council)This site allocation covers about 5.14 hectares of land west of Birch Coppice, south of the A5 at Dordon (E2). It is allocated for employment. Landscaping is required along the A5 and next to nearby homes. The existing allotments must be replaced, with services and infrastructure, at a location within 3/4 mile walking distance of the existing site or closer, and existing tenants must be consulted. Access should be provided through the adjoining Indurent Park site from Trinity Road. The text also notes a high pressure gas pipeline and the need to secure access to E2 through the E5 allocation.

The human version (we wrote this, not the council)This site allocation covers 41.49 gross hectares east and south of Indurent Park, Trinity Road, Dordon (E5). It is allocated for employment in Use Classes B2, B8 and Eg(iii), providing about 70,000 sq.m of floorspace, with at least one unit of at least 9,290 sq.m. A buffer of at least 200 metres must protect homes in Freasley. Access will be from Trinity Road, with contributions to M42 Junction 10 and a Transport Assessment. A link road must give lawful access to site E2 before any building is occupied. Active travel improvements and an Employment and Skills Plan are required.

The human version (we wrote this, not the council)This site allocation covers some 108 hectares west of No Man's Heath, north of the B5493, for strategic employment (E6). It includes a landscaped tree screen, retention of the Sandy Lane Spinney ancient woodland with a 15m buffer, and buildings set into the site to limit height. It must also provide a local service centre of no more than 1,000m2, lorry parking, and a transport and mobility hub. Other requirements include road improvements, drainage that protects the Mease SAC, BREEAM Excellent buildings and an Employment and Skills plan. To avoid duplicating strategic employment provision, it will only be supported if three named planning appeals on other sites are dismissed.

The human version (we wrote this, not the council)This site allocation covers 3.6 hectares north east of Overwoods Road and south of Swallowhurst (H16, CFS180). It is allocated for at least 95 dwellings. Because of a documented road safety concern, development must include a comprehensive street lighting scheme along Overwoods Road. As the M42 lies to the east, a detailed Noise Impact Assessment must be submitted with a planning application. The layout, orientation and design must reduce noise exposure for future residents from Junction 10 of the M42. Relying only on mechanical ventilation or closed windows will not be an acceptable solution.

The human version (we wrote this, not the council)This site allocation covers 0.92 hectares at the Coal Yard, Robeys Lane, Alvecote (H17, CFS153). It is allocated for mixed use development with homes and employment generating uses in live work units. Industrial, commercial, retail, leisure and service uses may be included if they suit the adjoining canal, marina and boat repair facilities. Employment must follow Policy LP41. The housing element should provide at least 12 residential units that reflect the canal's industrial heritage. Homes should be no more than three storeys and have active frontages, with habitable windows and entrances facing the canal.

The human version (we wrote this, not the council)This site allocation covers Littlehurst Nursery and Garden Centre, Corley (H18, CFS004). It is allocated for residential redevelopment for at least 25 dwellings. Vehicular access from Bennetts Road North may need to be remodelled to create a safe, legible and well designed residential street. The access arrangement must show that it can handle the scale of development without harming highway safety. Proposals must take a sensitive approach to site boundaries, using landscaping and screening where needed to reduce impacts on neighbouring uses and improve local character.

The human version (we wrote this, not the council)This site allocation covers about 3.88 hectares south of Birmingham Road and east of Maxstoke Lane, Meriden (H29, CFS039). It is allocated for at least 102 dwellings. Development must deliver a minimum of 50% affordable housing on site, with a suitable mix of tenure, type and size. Existing trees and hedgerow must be kept and protected, with native tree and hedgerow planting along all boundaries. Safe and attractive links to Maxstoke Lane must improve access to the surrounding Green Belt. The site must also provide high quality, publicly accessible open space as part of its green infrastructure.

The human version (we wrote this, not the council)This site allocation covers 2.2 hectares at Church Farm, New Street, Baddesley Ensor (H7). It is allocated for heritage led residential development, including conversion and regeneration of Church Farmhouse and its barns and outbuildings. High quality design is needed to respect the Church of St Nicholas, the Grade 2 listed war memorial and the sensitive landscape edge. A heritage assessment is required. Views from the village through the site to the church and war memorial must be kept. The historic farm buildings should be kept and reused where possible. Biodiversity features, buffers, landscaping and archaeological investigation before development are also required.

The human version (we wrote this, not the council)This site allocation covers land north and east of Dairy House Farm, Grendon (H30). It provides for dualling of the A5, joining the current A5 west of Grendon and rejoining it east of Grendon. A concept Master Plan must first be agreed with the Borough Council. It must include the agreed A5 alignment, safeguarded land for dualling with highway contributions, and housing south of the new road. A buffer of at least 15m is required around the ancient woodland, and a landscaped buffer along the new A5. Watling Street will be downgraded with crossings and improved cycling. Social and community infrastructure must also be provided.

The human version (we wrote this, not the council)This site allocation covers 0.3 hectares at Boot Hill, Baddesley Ensor, north of Grendon Community Hall, the former Youth Centre (H8). It is allocated for residential development. The mature trees on the site boundaries must be kept, to reflect the character of the site and help it fit into the existing village. The text also notes that H30, land north and east of Dairy House Farm, Grendon, was a reserve in the NWLP 2021 and now comes forward as an allocation, protecting land for the future dualling of the A5.

The human version (we wrote this, not the council)This site allocation covers land at Yew Tree Cottage, Baddesley Ensor (H31, CFS081). It is allocated for at least 9 dwellings. Development must make the access improvements needed onto Newland Road and show that safe vehicle, pedestrian and cycle access can be achieved. Because Baddesley Common Local Wildlife Site is nearby, the layout, scale and form must respect the ecological context, with buffers, landscaping and habitat enhancement to limit disturbance.

The human version (we wrote this, not the council)This site allocation covers 30.4 hectares between Church Road and Nuneaton Road, Hartshill, as a reserve housing site (RH9). The printed text shows both 400 and 300 as the minimum number of dwellings. Development needs an agreed Concept and Master Plan and must take heritage assets into account. It must include a through road from Church Road for buses and emergency vehicles, access and parking for the secondary school, and housing for older and younger people. It must also improve education, sport and recreation facilities and manage Local Wildlife Sites. The setting of Holy Trinity Church must be assessed.

The human version (we wrote this, not the council)This site allocation covers 17.2 hectares south of Coleshill Road, Ansley Common (H10). It is allocated for housing, with at least 450 dwellings expected in the plan period. Development must be comprehensive with site H32 and follow an agreed Concept and Master Plan. Requirements include improvements and a contribution to the Plough Hill Road and Coleshill Road junction, affordable and market housing, cycle and footpath links, health and education facilities, and better sports ground and allotments. The setting of Brett's Hall must be considered, a drainage strategy prepared, and a minimum 15m buffer kept to Brett's Wood ancient woodland.

The human version (we wrote this, not the council)This site allocation covers land north of Ansley Common (H32). It is allocated for up to 388 dwellings. The site must provide better walking and cycling through the site linked to nearby footpaths, an access road through the site that public transport can use, and a package of measures to protect and enhance local biodiversity assets, including Moorwood Wood. It must also support social and community infrastructure.

The human version (we wrote this, not the council)This site allocation covers land west of Tamworth Road and north of Ralph Crescent, Kingsbury (H19, CFS045). It is allocated for up to 283 dwellings. The site has a resolution to grant planning permission subject to a S106 Agreement (PAP/2025/0320), so it is a committed housing site. Development should follow the parameters, layout and conditions of that application. Any revised scheme must deliver equal or better design and environmental standards and follow the Local Plan. Proposals must identify existing overhead electricity lines and show how the layout takes account of them, keeping them within the scheme where practicable.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.