The human version (we wrote this, not the council)
This site allocation covers 0.26 hectares at Atherstone Lock, next to Bridge House Close (CFS030). It is allocated for at least 9 dwellings. Development must respond to the canal and lock setting and have an active frontage onto the canal, with entrances and habitable room windows facing it. Blank elevations, blank walls and high boundary treatments next to the canal will not be supported, and boundaries there should be visually permeable. A pedestrian and cycle connection must be provided via Minions Close. The supporting text notes that Atherstone Football Ground was previously reserve allocation RH3 in the NWLP 2021 and needs a replacement ground.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
H13 Atherstone Lock, adjacent to Bridge House Close (CFS030)
0.26 hectares is allocated for residential development for at least 9 dwellings. Development
proposals for the site will be required to:
• Respond positively to the canal and lock setting by reflecting and enhancing the character
and setting of the canal and associated lock infrastructure; and,
• Provide an active frontage onto the canal. New residential development must be orientated
so that the active elevations (the entrances and habitable room windows) front onto the
canal; and,
• Avoid inactive or defensive boundaries. Development proposals which result in blank
elevations, blank walls or high boundary treatments adjacent to the canal will not be
supported. Boundary treatments adjacent to the canal should be visually permeable; and,
• Provide a pedestrian and cycle connection via Minions Close
14.23e Atherstone Football Ground was previously a reserve housing allocation (RH3) in the NWLP
2021. A replacement football ground will be required. The preferred location is to the east
of Sheepy Road to the north of Atherstone. This site was put forward as part of the call for
sites. Both sites require Flood Risk Assessments. Site H28 has changed from a reserve
housing site to a full allocation as it is expected the development can now be achieved
within this plan period.