← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / H19

Site allocation H19

West of Tamworth Road and North of Ralph Crescent, Kingsbury

On pages 129 to 130 of the official PDF.

The human version

This site allocation covers land west of Tamworth Road and north of Ralph Crescent, Kingsbury (H19, CFS045). It is allocated for up to 283 dwellings. The site has a resolution to grant planning permission subject to a S106 Agreement (PAP/2025/0320), so it is a committed housing site. Development should follow the parameters, layout and conditions of that application. Any revised scheme must deliver equal or better design and environmental standards and follow the Local Plan. Proposals must identify existing overhead electricity lines and show how the layout takes account of them, keeping them within the scheme where practicable.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 129

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

H19 West of Tamworth Road and North of Ralph Crescent (CFS045) Land to the west of Tamworth Road is allocated for residential development for up to 283 dwellings. The site benefits a resolution to grant planning permission subject to a S106 Agreement (Ref: PAP/2025/0320). The site is therefore identified as a committed housing site and will make an early contribution towards the delivery of the Council’s housing requirement over the plan period. The development should be carried out in accordance with the parameters, layout, and planning conditions associated with application PAP/2025/0320, unless otherwise agreed through subsequent approvals, including reserved matters applications. Where an alternative or revised scheme is proposed, it must be demonstrated that the scheme would deliver design quality, place- making, and environmental standards that are equivalent to or exceed those secured through application PAP/2025/0320. Any variation from the existing scheme PAP/2025/0320 must accord with the policies of the Local Plan as a whole. Proposals will need to demonstrate compliance relating to design quality, residential amenity, safe and suitable access, infrastructure provision, and environmental protection and mitigation. Electricity Infrastructure Development proposals shall identify existing overhead electricity lines and associated infrastructure within or adjacent to the site and demonstrate how the layout and design of the development has taken account of these assets. Wherever practicable, development should be designed to retain and incorporate existing electricity infrastructure within the scheme, including the provision of appropriate easements, stand-off distances and maintenance access requirements. Any necessary diversion or alteration of infrastructure should be minimised and undertaken in consultation with National Grid Electricity Distribution and other relevant utility providers.
Design & placemakingSite allocationsTransport & travel📍 Kingsbury📍 Tamworth
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.