← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / H30

Site allocation H30

Dairy House Farm Phase 3 and safeguarding route for dualling of A5

On pages 125 to 126 of the official PDF.

The human version

This site allocation covers land north and east of Dairy House Farm, Grendon (H30). It provides for dualling of the A5, joining the current A5 west of Grendon and rejoining it east of Grendon. A concept Master Plan must first be agreed with the Borough Council. It must include the agreed A5 alignment, safeguarded land for dualling with highway contributions, and housing south of the new road. A buffer of at least 15m is required around the ancient woodland, and a landscaped buffer along the new A5. Watling Street will be downgraded with crossings and improved cycling. Social and community infrastructure must also be provided.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 125

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

H30 Dairy House Farm Phase 3 and safeguarding route for dualling of A5 Site H30 will provide for the dualling of the A5 to join from the current A5 to the west of Grendon and re-join the current A5 to the east of Grendon (A5 ‘phases 3 and 4’ in the Infrastructure Delivery Plan). Prior to development coming forward, a concept Master Plan will be agreed with the Borough Council to include the following: • An agreed alignment of the A5 dualling within the site; and • Safeguarded land for the dualling of the A5 together with proportionate highway contributions; and • Housing will be located to the south of the new road; and • A minimum of 15m (or as agreed) buffer zone will be provided around the ancient woodland; and • A landscaped buffer will be provided along the new A5; and • The current Watling Street, A5, will be downgraded and pedestrian crossings will be provided to allow for greater cohesion with the main part of the settlement to the south; and • Improved cycling will be provided along the Watling Street; and • Provide supporting social and community infrastructure 14.56b Yew Tree Cottage is a small parcel of land of approximately 0.27ha located at the rear of Yew Tree Cottage. The site is accessed off Newlands Road which is recognised as being a narrow access track. Therefore, the policy seeks to ensure that the necessary access improvements are secured to make the development acceptable in highways terms. This may include, but is not limited to, providing visibility splays and widening the road. The access is not an adopted road therefore, consideration would need to be given by a developer as to whether the access can be upgraded to an adoptable standard. Otherwise, it will have to remain as private access. The preference is for roads to be to an adoptable standard. 14.56b The site is adjacent to the Baddesley Common Local Wildlife Site. The policy recognises the need to safeguard and enhance this adjacent Local Wildlife Site.
Nature & environmentSite allocationsTransport & travel📍 Grendon
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.