← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / LP17

Policy LP17

Green infrastructure

On pages 59 to 60 of the official PDF.

The human version

This policy requires development to contribute, where appropriate, to a strategically planned Green Infrastructure network. Proposals should identify, maintain and enhance existing assets, create links to surrounding networks and help deliver new assets, having regard to Natural England's standards. Where an asset is lost and cannot be replaced on site, contributions will be sought towards wider projects. The text that follows introduces the Tame Valley Wetlands Nature Improvement Area, designated in 2016, which includes 5 SSSIs, 12 Local Nature Reserves and 48 Local Wildlife Sites.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 59

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP17 Green Infrastructure Development proposals must, where appropriate, demonstrate how they contribute to maintaining and enhancing a comprehensive and strategically planned Green Infrastructure network. With reference to the Warwickshire, Coventry and Solihull Sub-Regional Green Infrastructure Strategy, Natural Capital Investment Strategy and Natural Capital Investment Implementation Plan and the local green infrastructure resource development should: • Identify, maintain and enhance existing Green Infrastructure assets where possible; • In all cases should optimise opportunities to create links between existing Green Infrastructure within the district and to surrounding sub-regional networks; • Help deliver new Green Infrastructure assets have regard to Natural England's Green Infrastructure Framework and Green Infrastructure Standards. Where an existing asset is lost or adversely affected, and where mitigation or compensatory Green Infrastructure cannot be provided on site, contributions will be sought towards wider Green Infrastructure projects and improvements within the district or, where appropriate, in the sub- region. Tame Valley Wetlands Nature Improvement Area (NIA) including Kingsbury Water Park 10.20 The River Tame and its valley extend from the Black Country across Birmingham into North Warwickshire, through Tamworth and beyond. It is an important ecological area which is a regional asset that needs to be proactively considered and where possible enhanced as a tourist destination. The area has many functions - wildlife, flood storage, nature, and tourism. This is particularly true of the Tame Valley Wetlands, which cover the whole of the Tame Valley in North Warwickshire (and North Solihull, Castle View and Tamworth) covering the Birmingham & Fazeley Canal and the River Tame and tributaries, including the River Cole, River Blythe SSSI, River Bourne and River Anker. The Tame Valley Wetlands is designated as a Nature Improvement Area and is shown in Appendix H. 10.21 The Tame Valley Wetlands was designated as a Nature Improvement Area (NIA) by the Warwickshire, Coventry and Solihull Local Nature Partnership in October 2016. NIA’s are recognised in the NPPF as important areas. The area includes many sites important for nature conservation: there are 5 SSSi’s and 12 LNRs which are statutory sites plus a further 48 Local Wildlife Sites of county importance. The NIA is delivering aspects of the Local Nature Partnerships strategic vision. 10.22 NIA’s were established to create joined up and resilient ecological networks at a landscape scale; a mechanism identified in the Government’s 2011 White Paper to help us leave our natural environment in a better state than we inherited it. They are designated by the Local Nature Partnerships and consist of areas with opportunities to establish and improve ecological networks via a shared vision for the natural environment, which will also offer multiple benefits to the community. 10.23 The Tame Valley Wetlands Landscape Partnership focuses on the Tame Valley area lying within North Warwickshire. The Partnership is led by Warwickshire Wildlife Trust and the Borough Council is a partner of this group which is seeking to enhance the area for people and wildlife. The Vision for the NIA “is to create a wetland landscape, rich in wildlife and accessible to all” by working with a range of partners, organisations, landowners and the local community. This will be achieved by taking a landscape-scale approach to restoring, conserving and reconnecting the physical and cultural landscape of the Tame Valley. By re-engaging local communities with the landscape and its rich heritage, a sense of ownership, understanding and pride will be nurtured to ensure a lasting legacy of restoration and conservation. 10.24 Opportunities exist within the NIA to adopt a landscape-scale approach to nature conservation in order to protect habitats and species as they adapt to a changing climate, engage communities and promote sustainable tourism and land management so as to improve the social and economic wellbeing, and secure continued funding for the landscape. 10.25 Part of the valley includes the Kingsbury Water Park. Kingsbury Water Park grew out of the old, gravel workings in 1975 and has become a haven for bird watchers and walkers alike, attracting over 100,000 visitors per annum. It is an important local and regional visitor attraction providing important habitats as well as camping and visitor facilities. The Borough Council recognises the importance of the site to both the local area and region. It therefore wishes to indicate its support for its continued existence which may require replacement of the buildings within the envelope of the site.
Flooding & waterInfrastructure & utilitiesNature & environment📍 Coventry📍 Kingsbury📍 Kingsbury Water Park📍 Tamworth
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.