← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire Plan Explorer

Flooding & water

Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.

139 sections of the plan, in document order.

The human version (we wrote this, not the council)This section sets out the main cross-cutting issues behind the plan. These include access to services and jobs, an ageing population, health problems and fuel costs. Flood risk is another issue, especially along the Rivers Tame, Anker, Blythe and Cole. About 2,130 veterans live in the Borough, around 4% of people aged 16 and over. The section links the plan to the council's Corporate Plan and stresses delivering infrastructure alongside growth. It lists seven qualities that make the Borough unique, including 11 Conservation Areas, over 600 listed buildings and monuments, dispersed settlements, its mining legacy, its transport links and its major employers.

The human version (we wrote this, not the council)This policy requires development to contribute, where appropriate, to a strategically planned Green Infrastructure network. Proposals should identify, maintain and enhance existing assets, create links to surrounding networks and help deliver new assets, having regard to Natural England's standards. Where an asset is lost and cannot be replaced on site, contributions will be sought towards wider projects. The text that follows introduces the Tame Valley Wetlands Nature Improvement Area, designated in 2016, which includes 5 SSSIs, 12 Local Nature Reserves and 48 Local Wildlife Sites.

The human version (we wrote this, not the council)This policy supports the Tame Valley Wetlands Nature Improvement Area, including Kingsbury Water Park. The council will encourage bigger, better and more joined up habitats, safe public access, natural flood management and the restoration of watercourses. Where habitat loss cannot be made up locally, the area may receive habitat mitigation and offsetting projects. Replacement buildings needed because of HS2 will be allowed elsewhere within Kingsbury Water Park. The text that follows introduces the River Anker Access and Nature project in Atherstone, which aims to improve public access to the river and its meadows.

The human version (we wrote this, not the council)This policy supports the River Anker Access and Nature project, which aims to create a connected green infrastructure network, improve access to nature and strengthen links between Atherstone, Mancetter and new allocated sites. Development in Atherstone and Mancetter must show how it meets recreation, open space and green infrastructure needs, and should link directly to the project where appropriate. Where on-site provision is not feasible, contributions to off-site improvements will be secured through planning obligations. The supporting text describes the Local Nature Reserves, including Daffern's Wood, which is about 2.42 hectares.

The human version (we wrote this, not the council)This section introduces the development management chapter. All development should show it is sustainable, with high quality design and place making, accessibility for all and sustainable transport. Health Impact Assessments are required where development would increase health inequalities. The section covers protecting open spaces, living and working conditions, river pollution and flood risk, and air quality, noting that no Air Quality Management Areas are currently designated. It also covers contaminated land and the mining legacy, avoiding the best and most versatile farmland, groundwater, waste, and designing out crime and terrorism risk.

The human version (we wrote this, not the council)This policy covers new agricultural, forestry and equestrian buildings. New buildings or extensions are supported if they are reasonably necessary in scale, construction and design for the efficient and viable long-term operation of the holding. There must be no existing building that can be used, altered or extended, and the new building should be within or next to a group of existing buildings. The site and materials must not cause visual intrusion, and livestock buildings must not cause loss of residential amenity. The supporting text begins the water management section, covering flood risk assessments, SuDS and water stress.

The human version (we wrote this, not the council)This policy covers water and flood risk management. Development must not harm the ecological status of a waterbody, and should look at de-culverting and river restoration. Runoff must be no more than greenfield rates, using SuDS, or at least a 50% reduction where that is not possible. In Flood Zone 3 there must be floodplain compensation, an 8m set back from main rivers, and floor levels 600mm above the flood level. A Water Statement must show adequate sewerage. New homes must achieve no more than 100 litres per person per day. Large non-residential buildings must reach at least 4 BREEAM water credits. The text also begins the parking section.

The human version (we wrote this, not the council)This site allocation covers Atherstone Football Ground (H28). It will deliver at least 46 dwellings and needs the football ground to move. The preferred new location is east of Sheepy Road, north of Atherstone, with access from Sheepy Road or Royal Meadow Drive. Extra enabling housing may be allowed if site conditions permit. The site needs a detailed Flood Risk Assessment to show how much land outside the Flood Zone 3 climate change extent can be built on. Until new modelling is available, the developable area will be based on the EA Flood Zones. Ground levels may be adjusted for safe access if third party flood risk does not rise.

The human version (we wrote this, not the council)This site allocation safeguards 6.8 hectares of employment land at Holly Lane, Atherstone (E1). Aldi currently has an interest in the land. If Aldi no longer needs it, the site stays safeguarded as a long term employment site for smaller scale mixed E(g)(ii) and B2 uses. Access would be from Holly Lane and/or Abeles Way. Area A is the developable area and Area B is a semi natural buffer along Innage Brook. A Level 3 Flood Risk Assessment must show how much land lies outside flood zones 2 and 3 plus climate change freeboard.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.