← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / LP2

Policy LP2

Settlement Hierarchy

On pages 26 to 30 of the official PDF.

The human version

This policy sets out the settlement hierarchy, which decides how much development goes where. Category 1 is the Market Towns of Atherstone with Mancetter, Polesworth with Dordon and Coleshill. Category 2 is settlements next to the Borough's outer boundary. Category 3 is the Local Service Centres: Baddesley with Grendon, Hartshill with Ansley Common, New and Old Arley, Kingsbury and Water Orton. Category 4 covers 13 other settlements with a development boundary, usually with sites of no more than 10 units. Category 5 is all other locations, where development is not generally acceptable apart from special cases. The supporting text also explains the Green Belt studies and the 30% extension guide.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 26

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP2 Settlement Hierarchy Development within the Borough will be proportionately distributed and be of a scale that is in accordance with the Borough’s settlement hierarchy. Development will be commensurate with the level, type and quality of day to day service provision currently available and the ability of those services to absorb the level of development in combination with any planned allocations in this Local Plan and committed development in liaison with service providers. In Categories 1 to 4 settlements development within development boundaries will be supported in principle. Development directly adjacent to settlement boundaries may also be acceptable, including that which would enhance or maintain the vitality of rural communities, provided such development is proportionate in scale to the relevant settlement and otherwise compliant with the policies in the plan and national planning policy considered as a whole (including in respect of Green Belt protections) Category 1: Market Towns of Atherstone with Mancetter and Polesworth with Dordon and the Green Belt Market Town of Coleshill Category 2: Settlements adjoining the outer boundary of the Borough Development will be permitted directly adjacent to built up areas of adjoining settlements if: a) the site lies outside of the Green Belt or Strategic Gap b) development would integrate clearly with wider development c) has a clear separation to an existing North Warwickshire settlement to ensure the character of North Warwickshire settlements are preserved; and, d) linkages are made to existing North Warwickshire settlements to ensure connectivity between places especially via walking and cycling Category 3: Local Service Centres – Baddesley with Grendon, Hartshill with Ansley Common, New & Old Arley, Kingsbury, Water Orton Category 4: Other Settlements with a development boundary - Ansley, Austrey, Curdworth, Fillongley, Hurley, Newton Regis, Piccadilly, Ridge Lane, Shuttington, Shustoke, Warton, Whitacre Heath, Wood End Development within development boundaries will be supported in principle. Development directly adjacent to settlement boundaries may also be acceptable if small in size and scale. All development will be considered on its merits; having regard to other policies in this plan and will cater for windfall housing developments usually on sites of no more than 10 units at any one time depending on viability, services and infrastructure deliverability Category 5: All other locations All Development In all other locations development will not generally be acceptable, albeit as set out above that there may be some instances where development may be appropriately located and would enhance or maintain the vitality of rural communities under this category. Special circumstances should exist to justify new isolated homes in the countryside such as rural workers’ needs, the optimal viable use of a heritage asset, the re-use of redundant buildings enhancing its immediate setting, the subdivision of an existing residential dwelling, or development of exceptional quality or innovative design or for rural exception sites in line with national planning policy. All such development will be considered on its merits and with regard to other policies in this plan. Green Belt 7.12 National Green Belt policy operates over two thirds of the Borough. Within Green Belts the primary aim is to prevent urban sprawl, maintaining the open nature of the area and there is a general presumption against development that is inappropriate, except in very special circumstances. The National Planning Policy Framework provides the strategic policy guidance. It gives advice on where and what development is appropriate or inappropriate in the Green Belt. This policy builds on the NPPF, provides the local context and provides how it will be implemented in certain instances. 7.13 The pressure on the Borough from surrounding urban areas needs to be considered in the context of protections accorded to the Green Belt, and how areas of the Green Belt perform relative to the functions for Green Belt. Three studies have been carried out relating to the Green Belt. 7.14 The first (the Joint Green Belt Study3) relates to how broad areas and parcels of land perform in relation to the five purposes of Green Belt as defined by the NPPF. The Joint Green Belt Study was undertaken in 2016 and highlighted some areas as relatively poor performing in some aspects of the purposes of Green Belt. Taking into account the needs of the Borough, the pressures for further development and the environmental impacts it was considered some of these sites will be either allocated for development in the NWLP 2021 or safeguarded for development as and when required whether in the Plan period or the next. This is explained further. 7.15 The maintenance of the Green Belt is seen as a vital component in protecting and enhancing the Borough as an area of pleasant countryside, especially by preventing the incursion of nearby urban areas. It is not just the wholeness of the Green Belt designation that is important but having defensive boundaries. As a result, a second Study of the Green Belt (North Warwickshire Green Belt Study4) was carried out in 2016 looking at the future boundaries of the Green Belt in relation to the outer limits and the detailed boundaries around settlements. The study was undertaken to look at ensuring that the boundaries continue to be defensible and follow clear physical features. The detailed boundaries of the Green Belt are shown on the Policies Map. 7.16 It is accepted that settlements surrounded by the Green Belt have smaller scale opportunities than those outside the Green Belt. This is in essence the role of the Green Belt, in protecting the openness between places. However, there may be opportunities for limited infill and redevelopment in villages still washed over by the Green Belt designation. Two settlements exhibit a clear, focused and cohesive settlement pattern with limited infill potential. Therefore, infill boundaries have been drawn to indicate where infill and limited redevelopment would be permitted and are shown on the Policies Map. 7.17 It must be stressed that a Green Belt Infill Boundary is not the same as a Development Boundary. A Green Belt Infill boundary is only intended to accommodate that type of development defined as “infill” or “infilling”. The policy defines “limited” through the use of a boundary rather than by a number or indeed leaving the matter open to interpretation on a case-by-case basis. This is the same approach adopted for settlement and town centre boundaries. The village however remains “washed over” by Green Belt and development within the village continues to be controlled by National and Local Green Belt policy. The restriction on development classed as “inappropriate” within a Green Belt therefore still applies. A Development Boundary however excludes the area within it from the Green Belt and its policy constraints. It establishes the principle for development and enables all types of development to be accommodated (site availability and other policies permitting). This includes redevelopment of existing buildings and plots, such as the demolition of large properties in large plots or the redevelopment of garden areas for higher density housing proposals. It is important to note that not all land within a development boundary should be redeveloped including green spaces. 7.18 One exception to the principle that construction of new buildings are inappropriate development in the Green Belt is where a building is replaced, providing the new building is in the same use, appropriately and sympathetically designed and not materially larger than the one it replaces. Another is limited infilling or complete redevelopment of previously developed sites where that would not have a greater impact on the openness of the Green Belt. A further exception is an extension or alteration which is not disproportionate relative 3 Joint Coventry & Warwickshire Green Belt Study – Stage 2 Report April 2016 4 North Warwickshire Green Belt Study 2016 to the size of the original building and includes sympathetic design aesthetic. 7.19 It is not considered that the NPPF alone is all that is necessary for the management of new development proposals in North Warwickshire’s Green Belt. The spatial vision and the strategic objectives set out in the Core Strategy 2014 and the NWLP 2021 emphasised that it is the rural character of North Warwickshire that distinguishes it from its neighbours. That character is to be retained by safeguarding that countryside and protecting its openness from encroachment. The Council therefore has to have robust and consistent policies to implement these objectives. The NPPF provides the background to do so, but it lacks definition when it comes to some of the details of handling planning applications. The policy below provides that definition as the alternative would be to rely on the wording of the NPPF and thus determine each application on its merits. This could result in an inconsistent approach, but on the other hand the use of stricter definitions should not be seen as prescriptive. 7.20 In particular it is some of the adjectives used in the NPPF that are considered to lack precision and it is the purpose of the policy below to make these explicit. It therefore addresses the main definition issues that are likely to arise when dealing with new development proposals in the Green Belt. There are two key quantitative adjectives “disproportionate” and “materially larger”. In addition, it is considered necessary to considered how previously developed land is dealt with. These are explained below. 7.21 The NWLP 2021 policy LP3 includes in the explanation that extensions within the Green Belt will be considered against a figure of 30% as a guide in order to assist in the assessment as to whether extensions are disproportionate or not. This has been applied consistently since that Plan was adopted; it is well understood, it has been upheld throughout that period on appeal, and it has impacted on new development proposals. It is not considered that there is reason to vary this figure. However, the policy below does address a constant issue arising with its use and that is the relationship with permitted development rights. Each application will be dealt with on its merits against this policy. However, there may be circumstances whereby larger extensions might be deemed acceptable. Examples could include the existing building’s setting, proximity and relationship with other buildings; its prominence in the landscape and whether there would be a substantial improvement in the overall design of the building. These considerations would also need to be assessed against the 30% figure set out in the policy. 7.22 The figure of 30% will also be used as a guide where it relates to replacement houses in the Green Belt. However, because of the different definitions in the NPPF – for “disproportionate” and “materially larger” there could be case for different quantitative figures. The term “not materially larger” might suggest a lesser amount of development than “disproportionate”. This is why it is also important to assess each application on its merits using the same considerations as set out above where appropriate. An additional consideration would be to look at the merits of replacing a building either on the same footprint as the existing or another. 7.23 It is considered that the use of a quantitative measure in these instances is a very useful indicator as to what the Council considers to be the meaning of these adjectives. Given the importance of retaining the Green Belt to the Council and to the consistent successful use of the measure since the adoption of the 2006 Local Plan, it is considered that it should be retained. 7.24 The NPPF gives guidance on how to deal with applications for the partial or complete redevelopment of previously developed land. Redevelopment within the lawful use of the previously developed land is acknowledged as being appropriate development. A redevelopment proposal for an alternative use that is itself appropriate within the Green Belt by definition in the NPPF is clearly acceptable. Other development proposals are still appropriate development by virtue of the NPPF, but other material planning considerations may have to be considered in the final planning balance. 7.24a As part of the Local Plan Review a Strategic Green Belt Assessment5 has been commissioned. This is the third study. The Stage 1 provided comprehensive strategic assessment of the contribution of the Borough’s Green Belt land to the five national Green Belt purposes set out in the National Planning Policy Framework. The assessment methodology takes account of changes to the NPPF in December 2024 which introduced the concept of ‘Grey Belt’ and the requirement for local authorities to review their Green Belt boundaries unless they are able to meet their identified development need in full. National Planning Practice Guidance on the assessment of Green Belt land in order to identify grey belt was published in February 2025, so this assessment responds to that guidance in order to ensure that North Warwickshire’s evidence base with respect to Grey Belt land is robust. A Stage 2 has also been carried out with focussed assessment drawing out detailed variations on the likely impact of removing specific sites from the Green Belt. 7.24b As a result of the Green Belt review, some parcels of Green Belt land have indicatively been defined broadly as falling within the definition of Grey Belt. The Green Belt review looks at those parcels of land that were considered of lower quality or less environmentally valuable. This has included previously developed land, poor-quality farmland, or areas with limited ecological or visual importance.
Design & placemakingGreen Belt & countrysideTransport & travel📍 Atherstone📍 Coleshill📍 Dordon📍 Hartshill📍 Kingsbury📍 Mancetter📍 Polesworth📍 Water Orton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.