← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / LP23

Policy LP23

Transport Assessment and Travel Plans

On pages 73 to 75 of the official PDF.

The human version

This policy requires Transport Assessments, sized to the scale of development, with the indicative thresholds in Appendix G. They are also needed for cumulative effects or where the local network is inadequate. Assessments must cover local and strategic roads, level crossings and rural lanes to avoid rat running, and must set out mitigation and highway contributions. Travel Plans must accompany them, link to existing road, cycle and footpath networks and encourage public and shared transport. They are secured by conditions or Section 106. The supporting text describes the rail network, including the four stations at Atherstone, Polesworth, Coleshill Parkway and Water Orton.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 73

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP23 Transport Assessments Transport Assessments appropriate to the scale of development proposed will be required to accompany development proposals (Appendix G identifies the indicative threshold). Assessments will also be required where there is a cumulative effect created by additional floor space or traffic movement on the site or in the vicinity, or where there are demonstrable shortcomings in the adequacy of the local transport network to accommodate development of the scale proposed. These Assessments should address impacts on both the local and strategic highway networks and should be scoped so as to be bespoke to the nature of the development proposals. They should also ensure that proposals provide appropriate infrastructure measures to mitigate the adverse impacts of development traffic and other environmental and safety impacts either individually or cumulatively. Appropriate provision for, or contributions towards the cost of any necessary highway improvements should also be addressed. Widening opportunities to access new developments for all sections of the community will need also to be addressed through the provision and enhancement of public transport services and facilities together with walking and cycling facilities. The Assessments should assess the impact on level crossings in the vicinity of the development as well as on rural roads and lanes in particular to avoid increased rat running. Travel Plans will be required to be submitted alongside these Assessments. Travel Plan Development will be expected to link with existing road, cycle and footpath networks. Developments that are likely to generate significant amounts of traffic and particularly larger developments will be expected to focus on the longer-term management of new trips; encourage the use of public and shared transport as well as appropriate cycle and pedestrian links. Increasing the opportunity to access these developments for all sections of the community should be addressed. This will be secured through a Travel Plan and/or financial contributions which will be secured either through planning conditions or the provisions of Section 106. Rail 12.10 Rail also plays an important role in the Borough with the Trent Valley line/ West Coast mainline and the Cross-Country line. There are four stations in the Borough. Atherstone and Polesworth are on the Tamworth to Nuneaton stretch of the West Coast Mainline. Coleshill Parkway and Water Orton are situated along the Leicester and Nuneaton line to Birmingham. There are two intermodal rail freight facilities at Hams Hall and Birch Coppice. These routes and stations are shown in Figure 3. 12.11 Local rail services have been improved to Atherstone and the new station in Coleshill has meant greater patronage. Polesworth is virtually closed with only one service in the morning going north. In patronage terms passenger usage at Atherstone station has seen a steady recovery following a sharp decline during the COVID-19 pandemic, with the most recent figures showing an 8.4% annual increase. The Warwickshire Rail strategy 2019- 2034 indicates that growth since 2016/17 at Water Orton station has increased by 8% whilst Coleshill Parkway has increased by 4%. 12.12 Kingsbury once had a railway station and a replacement station is still being pursued by Centro, alongside the Camp Hill Chord proposals for the Birmingham to Lichfield line that passes through Kingsbury past Dosthill and on to Tamworth. This has been a longstanding proposal having been included in Warwickshire’s Local Transport Plan 3 and policy TPT4 from the North Warwickshire Local Plan 2006. In addition, Network Rail have highlighted in the West Midlands Route Utilisation Strategy and the Initial Industry Plan, the need to improve the rail access to Birch Coppice/Kingsbury Depots, which would facilitate new and enhanced passenger rail services on the Birmingham to Tamworth rail corridor. These schemes are now being advocated through the West Midlands Combined Authority which recently won the franchise to run the rail services within the West Midlands. 9 new rail routes are being sought into the City. 12.13 A new station on the Birmingham to Nuneaton line is included in the Warwickshire Local Transport Plan, which is being directed towards the Galley Common/Stockingford area in the adjoining Borough of Nuneaton and Bedworth as a result a new station at Arley is no longer being pursued. 12.14 The improved provision of train services to Atherstone is supported. Investment has been made to improve the platforms and the train information signage. Further improved train services were introduced in December 2012 which cut the journey time to London by a further 20 minutes. There remain issues concerning parking and access to the western platform under the bridge on the Watling Street. Lighting has been improved and the footbridge has been removed. However, replacement of the footbridge is still supported. In addition, opportunities to improve parking for both the station and the town will be pursued. As part of Housing Allocation H12, there is the opportunity to transfer a small parcel of land to Network Rail in order to allow for the car park expansion at Atherstone Train Station. See Appendix P. 12.15 Polesworth Station has remained “open” only through the stopping of one train per day in one direction. With the proposals for development in and around Polesworth and Dordon work will be carried out to investigate the reopening of the station. This will also consider whether the current site is the best location for a station in the 21st Century.
Health, schools & communityInfrastructure & utilitiesTransport & travel📍 Arley📍 Atherstone📍 Coleshill📍 Dordon📍 Hams Hall📍 Kingsbury📍 Polesworth📍 Water Orton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.