This policy covers railway lines. The council supports in principle the replacement of lawful buildings and uses that HS2 Ltd requires to be removed, with relocation as close as practicable. The HS2 Phase 1 line is safeguarded, and traffic effects must be addressed through sustainable transport and traffic calming. Two former railway routes are safeguarded for possible reinstatement or as walking and cycling routes: RR1, the former Baddesley Mineral Railway, and RR2, the former Whitacre Line. The supporting text also covers the A5, which is over capacity, and the A446.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
What the plan says
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
LP25 Railway Lines
The Borough Council supports, in principle, proposals for the replacement of lawful buildings,
structures and uses, including those with permission, if their demolition or removal is required by
HS2 Ltd., or their ability to continue to operate as such would be compromised. Particular regard
will be had to the aim of relocation as close to an existing lawful building, structure or use, as
practicable, and as otherwise compliant with the policies, in this plan to minimise disruption and
assist in ensuring the continued vitality of the Borough
High Speed Rail
The line of the proposed High Speed 2 railway Phase 1 through North Warwickshire will be
safeguarded and are shown on the Policies Map.
Connectivity between the line and the settlements of North Warwickshire will be improved through
work with developers, the nominated undertaker, government organisations (including Highways
England and the Department of Transport) and funding agencies.
The traffic implications and impact of growth in adjoining area and from development related to
High Speed rail will need to be addressed and mitigated through encouraging sustainable transport
solutions and measures, including traffic calming and access constraints on the rural road network.
Safeguarding of Rail Routes
The former Baddesley Mineral Railway line between Baddesley Colliery and Birch Coppice
(Safeguarded Route RR1) and the route of the former Whitacre Line between Hampton in Arden
to Whitacre will be safeguarded (Safeguarded Route RR2) to allow for the potential re-instatement
of the route or as a traffic free recreational walking-cycling route.
No development will be permitted which would sever or prevent the potential future use of the
routes as a railway or other form of transport unless a suitable diversion or alternative is provided.
Road
A5
12.19 The A5 is an important part of the Strategic Road Network and forms a key arterial route
through the Borough. The A5 is an important strategic route for the sub-region and
nationally but it is also an important local road serving the local community. It therefore
has both local and national significance.
12.20 The Borough Council has been working with 14 other local authorities and Highway
England to develop a Strategy for the A5. As a trunk road its maintenance and
improvements essentially lies with Highways England, who are developing and reviewing
their Route-wide Strategies. The A5 is one of these key routes. The A5 Partnership and
Midlands Connect both confirmed that the A5 is a critical "economic backbone" of the
Midlands, key for logistics and housing, but is over capacity and needs to support growth
along the corridor.
12.21 There is growth proposed along the A5 both within and outside of the Borough. It is difficult
to see how the current road will be able to cater for such growth without substantial
investment. Investment will unlock a number of development sites. Any growth along its
route will need to carefully consider the implications of additional traffic, seeking appropriate
contributions towards improvements along the A5 corridor from developments, allocated or
windfall, that have a direct impact/increase on traffic generation onto the A5.
12.22 The Borough Council is working with a range of agencies and organisations to ensure that
it can be improved to ensure the delivery of all of the development proposed within this
Plan, including through the Road Investment Strategy 3 (RIS3) process, the UK
government’s third, long-term, multi-year plan for funding and managing England's
Strategic Road Network (SRN), motorways and major A roads. Notably the A5/M42
Junction 10 is identified as a pipeline scheme in Road Investment Strategy 4 (RIS4) (post-
2030).
A446
12.23 In addition the A446 runs parallel to the M42 and is another major route through the
Borough which has both local and national significance. As part of the HS2 proposals the
bridge over the River Tame will be built so the road can be dualled in the future. Investment
will be sought to complete this work so that the road is fully dualled south of Dunton Island
(junction 9 M42).