Policy LP25

Railway lines

On pages 76 to 77 of the official PDF.

The human version

This policy covers railway lines. The council supports in principle the replacement of lawful buildings and uses that HS2 Ltd requires to be removed, with relocation as close as practicable. The HS2 Phase 1 line is safeguarded, and traffic effects must be addressed through sustainable transport and traffic calming. Two former railway routes are safeguarded for possible reinstatement or as walking and cycling routes: RR1, the former Baddesley Mineral Railway, and RR2, the former Whitacre Line. The supporting text also covers the A5, which is over capacity, and the A446.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 76

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP25 Railway Lines The Borough Council supports, in principle, proposals for the replacement of lawful buildings, structures and uses, including those with permission, if their demolition or removal is required by HS2 Ltd., or their ability to continue to operate as such would be compromised. Particular regard will be had to the aim of relocation as close to an existing lawful building, structure or use, as practicable, and as otherwise compliant with the policies, in this plan to minimise disruption and assist in ensuring the continued vitality of the Borough High Speed Rail The line of the proposed High Speed 2 railway Phase 1 through North Warwickshire will be safeguarded and are shown on the Policies Map. Connectivity between the line and the settlements of North Warwickshire will be improved through work with developers, the nominated undertaker, government organisations (including Highways England and the Department of Transport) and funding agencies. The traffic implications and impact of growth in adjoining area and from development related to High Speed rail will need to be addressed and mitigated through encouraging sustainable transport solutions and measures, including traffic calming and access constraints on the rural road network. Safeguarding of Rail Routes The former Baddesley Mineral Railway line between Baddesley Colliery and Birch Coppice (Safeguarded Route RR1) and the route of the former Whitacre Line between Hampton in Arden to Whitacre will be safeguarded (Safeguarded Route RR2) to allow for the potential re-instatement of the route or as a traffic free recreational walking-cycling route. No development will be permitted which would sever or prevent the potential future use of the routes as a railway or other form of transport unless a suitable diversion or alternative is provided. Road A5 12.19 The A5 is an important part of the Strategic Road Network and forms a key arterial route through the Borough. The A5 is an important strategic route for the sub-region and nationally but it is also an important local road serving the local community. It therefore has both local and national significance. 12.20 The Borough Council has been working with 14 other local authorities and Highway England to develop a Strategy for the A5. As a trunk road its maintenance and improvements essentially lies with Highways England, who are developing and reviewing their Route-wide Strategies. The A5 is one of these key routes. The A5 Partnership and Midlands Connect both confirmed that the A5 is a critical "economic backbone" of the Midlands, key for logistics and housing, but is over capacity and needs to support growth along the corridor. 12.21 There is growth proposed along the A5 both within and outside of the Borough. It is difficult to see how the current road will be able to cater for such growth without substantial investment. Investment will unlock a number of development sites. Any growth along its route will need to carefully consider the implications of additional traffic, seeking appropriate contributions towards improvements along the A5 corridor from developments, allocated or windfall, that have a direct impact/increase on traffic generation onto the A5. 12.22 The Borough Council is working with a range of agencies and organisations to ensure that it can be improved to ensure the delivery of all of the development proposed within this Plan, including through the Road Investment Strategy 3 (RIS3) process, the UK government’s third, long-term, multi-year plan for funding and managing England's Strategic Road Network (SRN), motorways and major A roads. Notably the A5/M42 Junction 10 is identified as a pipeline scheme in Road Investment Strategy 4 (RIS4) (post- 2030). A446 12.23 In addition the A446 runs parallel to the M42 and is another major route through the Borough which has both local and national significance. As part of the HS2 proposals the bridge over the River Tame will be built so the road can be dualled in the future. Investment will be sought to complete this work so that the road is fully dualled south of Dunton Island (junction 9 M42).
Health, schools & communityTransport & travel📍 Birch Coppice
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.