← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire Plan Explorer

Birch Coppice

8 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy sets out strategic gaps, which keep settlements apart and stop them merging. A traveller passing through a gap should feel they have left one settlement, crossed open land and entered another. The gaps are between Tamworth and Polesworth and Dordon, between Dordon and Baddesley and Grendon, between Grendon and Atherstone, and between Atherstone or Mancetter and Caldecote or Nuneaton. Development that significantly harms the distinct character of those settlements will not be permitted. The supporting text also covers housing and employment need, including the 364 homes a year Standard Method figure and a Strategic Gap Study that is still under way.

The human version (we wrote this, not the council)This policy supports new residential moorings and the conversion of leisure moorings to residential use. Moorings need access to toilet and waste disposal, electric and water hook-ups, and individual access and parking. They must not block the towpath or navigation, harm leisure provision, air quality, nature, historic environment or biodiversity, or harm the character of the waterway or neighbours' amenity. Any berths or marina must be in scale with the nearest settlement in the hierarchy. The supporting text also explains the Borough-wide Article 4 Direction on houses in multiple occupation, which now requires planning permission for them.

The human version (we wrote this, not the council)This section introduces the employment chapter. The council wants to work with the private sector to create lasting local jobs while protecting rural character. Hams Hall and Birch Coppice are the two largest logistics sites, both with rail freight terminals. The economy is described as fragile because it depends on a narrow range of sectors and large employers. Horiba MIRA Technology Park and UK Central are expected to bring higher skilled jobs. The section also covers skills, out-commuting, high-speed broadband, and protecting employment land. A change of use needs evidence of at least 12 months of marketing.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport gives access to services, jobs and training, and the plan seeks to improve public transport between the Market Towns, Local Service Centres and villages. It notes the traffic effects of HS2 and the new NEC station, and the benefits and disturbance from Birmingham Airport. A Strategic Transport Assessment is being updated for the plan. Major developments must support public transport improvements, such as services to Birch Coppice and Hams Hall. Level crossings need early talks with Network Rail. The North Warwickshire Area Strategy 2026 sets out long-term transport improvements.

The human version (we wrote this, not the council)This policy covers railway lines. The council supports in principle the replacement of lawful buildings and uses that HS2 Ltd requires to be removed, with relocation as close as practicable. The HS2 Phase 1 line is safeguarded, and traffic effects must be addressed through sustainable transport and traffic calming. Two former railway routes are safeguarded for possible reinstatement or as walking and cycling routes: RR1, the former Baddesley Mineral Railway, and RR2, the former Whitacre Line. The supporting text also covers the A5, which is over capacity, and the A446.

The human version (we wrote this, not the council)This policy allocates employment land. In the Market Towns, E1 is 6.8 hectares at Holly Lane, Atherstone, and E2 is 5.1 hectares west of Birch Coppice, Dordon. In Category 2, E4 is 42 hectares south of Horiba MIRA Technology Park, E5 is 41.49 hectares as an extension to Indurent Park, and E6 is a 108 hectare strategic allocation at Junction 11 of the M42, No Mans Heath. The total excluding strategic land is 98.39 hectares, and including it is 206.39 hectares. The text also notes a cemetery extension in Coleshill and a lorry park at Junction 10 of the M42.

The human version (we wrote this, not the council)This site allocation covers Dordon Hall Barns (H15, CFS108). It is allocated for at least 13 dwellings. The existing agricultural buildings must be kept and sensitively converted to homes. Proposals must show they preserve and enhance the setting of Dordon Hall Farm, a Grade II listed building next to the site, and must be informed by a Heritage Impact Assessment. Conversion works and extensions must keep the original agricultural scale, form and layout, and use matching materials and detailing. Proposals must avoid over domestication of the buildings, such as excessive glazing, standard window patterns and prominent roof lights.

The human version (we wrote this, not the council)This site allocation covers about 5.14 hectares of land west of Birch Coppice, south of the A5 at Dordon (E2). It is allocated for employment. Landscaping is required along the A5 and next to nearby homes. The existing allotments must be replaced, with services and infrastructure, at a location within 3/4 mile walking distance of the existing site or closer, and existing tenants must be consulted. Access should be provided through the adjoining Indurent Park site from Trinity Road. The text also notes a high pressure gas pipeline and the need to secure access to E2 through the E5 allocation.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.