This policy covers strategic road improvements. The outcome of the A5 study becomes a material consideration for development affecting the A5, and the council will work with agencies on its dualling. Land north of Grendon through Site RH1 will be protected so dualling can take place. Once dualled, Watling Street through Grendon will be downgraded where possible, with walking and cycling encouraged. Dualling of the A446 over the River Tame will be sought. The supporting text says the A5 and the Plough Hill Road and Coleshill Road junction need improvements, and that developments will pay a transport infrastructure tariff.
An unofficial plain English summary. The official wording below is
what counts at examination; check it before you rely on anything here.
The text below is extracted automatically from the official PDF and may
contain artefacts; the PDF is authoritative.
LP26 Strategic Road Improvements A5 and the A446
A5
A study has been undertaken in respect of the future of the A5 Trunk Road and the outcome
including any environmental mitigation of this will become a material planning consideration in
respect of future development proposals that might impact on the A5.
The Council will work alongside the appropriate Agencies to develop the A5 Strategy and options
and funding opportunities for its dualling.
Land to the north of Grendon through Site RH1 will be protected from any development to ensure
the dualling of the A5 can take place. No part of site allocation RH1 will prejudice the
implementation of the future dualling of this route.
When the dualling of the A5 trunk road has been implemented the existing Watling Street through
Grendon will be downgraded, wherever possible, and walking, including the provision of
pedestrian crossings, and cycling routes will be actively encouraged and promoted.
A446
Improvement of the A446 including the dualling over the River Tame will be sought as well as
improved cycling links.
Highway Infrastructure
12.23a The Local Plan must be accommodated by the appropriate infrastructure. This is
particularly important for schools, health and roads. There are some key infrastructure
schemes that have already been identified, and which restrict the amount of development
that can be brought forward. In particular, the A5 and the Plough Hill Road/Coleshill Road
junction both require specific improvements which will release sites for development. The
scale of development focussed on Polesworth and Dordon also impacts the capacity and
increases congestion along the B5000, with bottlenecks at Market Street and Bridge Street
Junctions and, Long Street from B5000 to A5 junction at Dordon. The capacity and
congestion of the highway network around Junction 9/M42 and the A446 has also been
highlighted as a strategic bottleneck, limiting economic growth around Birmingham Airport
and UK Central and, regional growth around Tamworth and North Warwickshire Borough
(Midlands Connect written evidence 2023 (SRI0040) & National highways South Midlands
Route Strategy 2017).
12.23b There is therefore clear justification to seek all developments which impact on and
generate traffic flows to and from these locations, to contribute to these improvements,
based on a transport infrastructure tariff approach. Warwickshire County Council and
National Highways, if on the Strategic Road Network, will determine the contribution to be
sought from all relevant sites feeding into the Strategic Road Network. The final
contribution will take into account all other contributions and the amount of traffic expected
to use the relevant roads/junctions.