← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / LP32

Policy LP32

New Agricultural & Equestrian Buildings

On pages 88 to 91 of the official PDF.

The human version

This policy covers new agricultural, forestry and equestrian buildings. New buildings or extensions are supported if they are reasonably necessary in scale, construction and design for the efficient and viable long-term operation of the holding. There must be no existing building that can be used, altered or extended, and the new building should be within or next to a group of existing buildings. The site and materials must not cause visual intrusion, and livestock buildings must not cause loss of residential amenity. The supporting text begins the water management section, covering flood risk assessments, SuDS and water stress.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 88

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

LP32 New Agricultural, Forestry and Equestrian Buildings New or extensions to existing agricultural, forestry and equestrian buildings or structures will be supported if it can be demonstrated that they are reasonably necessary both in scale, construction and design for the efficient and viable long-term operation of that holding; that there are no other existing buildings (other than where that would be demonstrably impractical, have adverse visual effects compared with an alternative location, or where a new holding and buildings are being established) or structures that can be used, altered or extended, that they are located within or adjacent to a group of existing buildings, the site selected and materials used would not cause visual intrusion and in the case of livestock buildings their location would not cause loss of residential amenity. Water Management 13.23 Water Management is an important issue that must be addressed in any development proposal. Flooding events, in particular, are making headlines on a more regular basis. Existing issues may not be able to be addressed completely but they should not be made any worse by development taking place and where possible improvements should be made. Any development should have no greater run-off than a greenfield site and sustainable drainage should be an integral part of the site layout where required. 13.24 The Water Framework Directive has resulted in a number of River Basin Management Plans covering the whole country. Two specifically relate to North Warwickshire. The Humber River Basin Management Plan covers the majority of the Borough and a smaller area north of Coventry is covered by the Severn River Management Plan. The Rivers Tame, Blythe and Anker are all subject to pollution. Particular attention will be paid to remediation measures to benefit the River Blythe Site of Special Scientific Interest, which is currently under serious threat from pollution run-off. 13.25 The Borough Council will consider the impact of flooding in its consideration of development within or adjoining floodplains. Any development within Flood Zones Two and Three will need to provide a site-specific Flood Risk Assessment to demonstrate that it will be safe and will not increase flood risk elsewhere. In Flood Zone 1, an assessment should accompany all proposals involving: sites of 1 hectare or more; land which has been identified by the Environment Agency as having critical drainage problems; land identified in a strategic flood risk assessment as being at increased flood risk in future; or land that may be subject to other sources of flooding, where its development would introduce a more vulnerable use. It should take into account all sources of flood risk and climate change. Further information on the appropriate climate change allowance is provided in the Environment Agency’s ‘Climate change allowances for planning (West Midlands area)’. Up to date indicative Flood Maps for Planning can be obtained from the Environment Agency and the Government’s website 13.26 Effective flood protection requires proper maintenance of watercourses and their associated infrastructure as well as the control of water discharge through drainage systems. Ponds and other wetland features form an important function that should where possible be protected and enhanced. Managing flood risk is thus based on minimising the risk of flooding by avoiding development in high-risk areas; restricting discharge to greenfield runoff rates and ensuring development is designed so as to minimise surface water flooding risks, including the retention of existing natural wetland features and the safeguarding of land adjacent to these features. 13.26a An increasing focus is also being put upon reducing storm flow discharges from sewer networks. Severn Trent’s Drainage and Wastewater Management Plan identifies the measures Severn Trent are taking to meet national targets for reducing discharge impacts from storm overflows set out in the Government’s Storm Overflows Discharge Reduction Plan. The use of sustainable drainage systems (SuDS) in developments also helps reduce the risk of storm flow discharges through reducing the volume of rainwater getting into the sewer network. 13.26b SuDS are a collection of water management techniques that are designed to manage surface water runoff close to where it falls and mimic natural drainage as closely as possible. They are an important feature in ensuring flood risk is effectively managed and thus all developments are expected to include the use of such systems unless demonstrated that they would be inappropriate. They can also provide multi-functional benefits by removing pollutants from surface water and combining water management with blue and green infrastructure with benefits for the landscape, recreation, and biodiversity. Developers should refer to DEFRA’s non-statutory National standards for sustainable drainage systems July 2025 (or subsequent updates), which provides guidance on minimum standards for design, maintenance, and operation of SuDS systems. CIRIA’s SuDS Manual 2015 also includes advice on suitable development design. As the Lead Local Flood Authority, Warwickshire County Council provides technical advice and guidance (Flood Risk Guidance for Development updated June 2023) on proposed surface water drainage strategies, designs, and maintenance arrangements. 13.26c Flood alleviation requires a holistic approach to water management. Rivers and streams need to be allowed to function via natural processes and to connect with the flood plain in order to increase and maintain capacity and to store flood water. Artificial surface water infrastructure needs to be well designed and be properly maintained whilst the ecosystem that helps manage water also need to be protected to allow greater ground water storage, to prevent rapid surface run-off and soil erosion. In these ways, natural flood management and the re-naturalisation of water courses and their flood plains can help to reduce flood risk and water pollution, increase biodiversity and contribute to improving public health. 13.27 Natural flood management and the re-naturalisation of water course and their flood plains can help to reduce flood risk and water pollution and can increase biodiversity and contribute to improving public health. 13.27a The Environment Agency advises that contributions from new development to contribute toward the upgrade and/or maintenance of existing flood prevention schemes may be sought. 13.27b Much of the Severn Trent area, including North Warwickshire Borough, is designated as an ‘area of serious water stress’ by the Environment Agency (Water Stressed Areas – 2021 Final Classification). Areas of serious water stress are identified where both the current and future household demand for water is a high proportion of the effective rainfall available to meet demand. It is also predicted that the effects of climate change could further reduce supply and increase demand. It is essential that future development minimises the use of mains water and makes the most efficient use of water by incorporating measures such as rainwater harvesting and greywater recycling systems unless it is demonstrated that such provision would not be technically feasible or financially viable. 13.27c Building Regulations require all new residential developments to achieve a mandatory standard of 125 litres per person per day (l/p/d). The technical standards for housing allow local authorities to apply an optional requirement of 110 l/p/d where there is a clear local need. The Coventry and Warwickshire Water Cycle Study – Stage 1 Final Report 2024 (WCS) identified that water resource pressures on the environment and on public water supply would justify the introduction of water efficiency measures for both new residential and commercial development. For new build housing, the Water Cycle Study recommended that this should be at a lower standard of 100 l/p/d. 13.27d Improved water efficiency should not be limited to measures within new residential development. For non-residential development, reductions in water demand will be sought through the application of the Building Research Establishment Environmental Assessment method (BREEAM) water consumption standards. Commercial buildings will be required to achieve the BREEAM ‘excellent’ standard for water consumption. Should tighter national standards be introduced during the Local Plan period applicable for areas of serious water stress, they will be applied. 13,27e With regard to Previously Developed/Brownfield sites, where it has been established to the satisfaction of the LLFA that it is not technically possible to achieve greenfield runoff rates, development should aim to provide the maximum betterment possible and at least a 50% reduction in discharge rates should be achieved. This should be undertaken using the process set out within the Flood Risk Guidance for Development published by Warwickshire County Council as the Lead Local Flood Authority.
Design & placemakingFlooding & waterInfrastructure & utilities📍 Coventry
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.