← Open Consultation: all consultations

North Warwickshire Plan Explorer

Search the North Warwickshire Local Plan. 170 pages, made findable.

The consultation closes at 11:59pm, Thursday 26 November 2026.

OpenConsult / North Warwickshire plan / RH9

Site allocation RH9

Land between Church Road and Nuneaton Road, Hartshill (reserve site)

On pages 127 to 128 of the official PDF.

The human version

This site allocation covers 30.4 hectares between Church Road and Nuneaton Road, Hartshill, as a reserve housing site (RH9). The printed text shows both 400 and 300 as the minimum number of dwellings. Development needs an agreed Concept and Master Plan and must take heritage assets into account. It must include a through road from Church Road for buses and emergency vehicles, access and parking for the secondary school, and housing for older and younger people. It must also improve education, sport and recreation facilities and manage Local Wildlife Sites. The setting of Holy Trinity Church must be assessed.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 127

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

RH9 Land between Church Road and Nuneaton Rd, Hartshill Some 30.4 hectares at land between Church Road and Nuneaton Road, Hartshill is allocated as a reserve housing site for a minimum of 400 300 dwellings with associated infrastructure. Any development will need to consider the significance of the heritage assets within and close to the site and be taken into account in the design and form of any future development. Development will be undertaken in accordance with a Concept and Master Plan agreed with the Borough Council. The document will be prepared to assist with the development of the site. Development of the site will include: • a through road from Church Road to either Nuneaton Road or Camphill Road capable of buses, emergency vehicles and waste vehicles manoeuvring freely; • access and parking issues addressed; including enabling access to the rear of the secondary school to facilitate parking, access to the school and the future provision of drop off and public transport stopping facilities • a range of house types to include housing for the elderly and young people; and • a net improvement in educational, sport and recreation facilities within and adjoining the site to include educational infrastructure to assist the adjoining secondary school and nearby primary schools as well as the protection and long-term favourable management of designated Local Wildlife sites; and, • the contribution of setting to the significance of the Holy Trinity Church to be assessed and taken into account in the design and form of the future development. 14.61 There are a number of sites that have been put forward for housing development around Ansley Common. Some 17.2 hectares south of the village have been allocated with a further 21.6 hectares north of the village reserved for future development. These large areas give the opportunity for a number of service and facilities to be improved including the allotments and sports ground as well as improve the local roads. 14.62a Further work has been carried out by Warwickshire County Council and it is proposed that the Plough Hill Road junction is improved by the provision of a roundabout. The scheme is included in the Infrastructure Delivery Plan 2025. Each development impacting on this junction will need to pay a contribution towards the costs of these improvements as required by Policy LP26a.
Health, schools & communitySite allocationsTransport & travel📍 Ansley📍 Ansley Common📍 Hartshill📍 Nuneaton
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 26 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.