← Open Consultation: all consultations

Tandridge Plan Explorer

Search the Tandridge District Local Plan. 121 pages, made findable.

The consultation closes at 9am, Tuesday 8 December 2026.

OpenConsult / Tandridge Plan Explorer

Oxted

8 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces the Tandridge District Local Plan, which sets out how growth will be delivered to 2042. It is the Regulation 19 version, covering 2027 to 2042, and will replace the Core Strategy 2008 in full. The plan period was cut from 2044 to 2042. On 1 April 2027, East Surrey Council will replace Tandridge District Council. The Plan must pass four soundness tests: positively prepared, justified, effective and consistent with national policy. Comments should focus on legal compliance and soundness, sent through the online portal, by email or by post. The publication period runs for at least six weeks, closing at 9am on Tuesday 8 December 2026.

The human version (we wrote this, not the council)This section describes Tandridge District, a mainly rural area in the east of Surrey covering about 248 square kilometres. About 94% of it is Green Belt, and 16% lies in the Surrey Hills and High Weald National Landscapes. M25 Junction 6 runs beyond its designed capacity. The district has 22 parishes. The 2021 Census population was 87,874, rising to 90,586 by mid-2024, with an older age profile. In 2025 the median house price was £490,000. Delivery has averaged about 247 homes a year, against a need of 819, or 12,285 homes over 15 years. The HEDNA finds an employment land need of 21.4 hectares.

The human version (we wrote this, not the council)This section explains the Spatial Strategy. It puts brownfield and underused land in settlements first, but this cannot meet needs in full, so the Plan also allocates greenfield and Green Belt land. Table 4 sets out a four-tier settlement hierarchy, from Urban Centres such as Caterham on the Hill and Oxted down to smaller villages and hamlets. The Council says exceptional circumstances justify Green Belt boundary changes. Redhill Aerodrome is the main strategic site, expected to deliver about 2,350 homes. The minimum housing requirement is 9,946 over the plan period, around 663 homes each year, compared with past delivery of about 247. Policies SP1 and SP2 follow.

The human version (we wrote this, not the council)This policy supports a prosperous and sustainable rural economy. It backs the growth, diversification and modernisation of rural businesses, tourism and land-based enterprises such as farming and forestry, where they respect the countryside. Proposals should use existing buildings or previously developed land where practical. New buildings must show a need for a countryside location and relate well to existing buildings. Schemes must suit their rural setting in scale, avoid urbanisation, provide safe access and parking and avoid harm to neighbours from traffic, noise or lighting. They should conserve landscape, biodiversity and heritage. Conditions or obligations may tie development to the enterprise that justified it.

The human version (we wrote this, not the council)This policy sets the hierarchy of centres. Caterham and Oxted are Town Centres. Caterham-on-the-Hill, Lingfield, Warlingham and Whyteleafe are Local Centres. Development in centres is supported where it fits their role and keeps them lively and viable, for example by adding shops, leisure and food and drink uses or reusing vacant space. Homes in centres are supported, but in primary shopping areas they should be on upper floors or avoid losing active ground-floor frontages. Main town centre uses outside centres must pass the sequential approach. Retail and leisure schemes above 500 sqm gross floorspace outside town centres need an impact assessment. Loss of local shops and services needs justification.

The human version (we wrote this, not the council)This section introduces the Green Belt chapter. About 94% of Tandridge District is Green Belt, which keeps settlements apart, contains built-up areas and protects the countryside. The Plan aims to balance long-term protection of the Green Belt with planning for sustainable development, releasing land only where necessary and justified. Grey Belt is a category of Green Belt land in national policy, but calling land Grey Belt does not change the boundary or mean development is acceptable. The Stage 1 and Stage 2 Green Belt Assessments looked at how land performs. The chapter contains Policies GRB1 and GRB2.

The human version (we wrote this, not the council)This site allocation lists the residential-led sites in Table ALL2, shown on the Policies Map. Each capacity is the minimum assumed for housing supply, and higher or lower numbers will be judged on land use, constraints and infrastructure. Sites must fund infrastructure and mitigation under Policy INF1. The table covers places including Caterham, Hurst Green, Warlingham, Whyteleafe, Godstone, Lingfield, Smallfield, Copthorne, Bletchingley, Felbridge and Tatsfield. Larger sites include land west of Chapel Road, Smallfield, at 270 dwellings and Felbridge Showground at 230. Some sites must protect skylarks, provide landscape buffers, add medical facilities or improve Star Junction. At Tatsfield, 50% of homes on two sites must be affordable.

The human version (we wrote this, not the council)This section is the glossary, which explains terms used in the Local Plan. It defines terms such as deliverable and developable sites, Green Belt and its five purposes, Grey Belt, and major development, which for housing means 10 or more homes or a site of 0.5 hectares or more. It also explains Local Green Space, National Landscapes, previously developed land, Social Rent and windfall sites. Other entries cover housing terms such as self-build and custom-build housing and discounted market sales housing at least 20% below local market value. The glossary ends with contact details for Tandridge District Council in Oxted.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 9am, Tuesday 8 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.