Policy ALL2: Residential-led site allocations
1. The residential sites identified in Table ALL2 and shown on the Policies Map are allocated for residential
development and will contribute towards meeting housing needs over the Plan period.
2. For sites identified the capacity represents the minimum contribution assumed in the housing
trajectory and monitoring framework. Proposals for materially higher or lower capacities will be
considered having regard to:
a. The efficient use of land.
b. Site constraints and opportunities.
c. Infrastructure capacity and requirements.
d. Compliance with the policies of the Development Plan taken as a whole.
3. Development must deliver or contribute proportionately towards the infrastructure and mitigation
required to address its individual and cumulative impacts in accordance with Policy INF1.
4. Where sites are functionally related or give rise to cumulative impacts, proposals must demonstrate
those impacts can be appropriately mitigated and where necessary, addressed through a coordinated
approach to development and infrastructure funding.
Table ALL2 - Residential-led allocations:
Ref: Site Address Dwellings Site specific requirements
CATa Land at Kenley
Aerodrome, Victor
Beamish Avenue,
Caterham.
80 Site specific requirements to be provided as set out in
planning permission reference 2023/878.
CATb 143-149 Croydon Road,
Caterham.
40 This site is to be developed as a mixed-use site to
retain employment uses alongside the residential
requirement. The development is to be delivered as
a comprehensive scheme supported by sufficient car
parking and other transport mitigations to support the
proposed mixed use of the site.
CATc Caterham Telephone
Exchange, 34 Godstone
Road, Caterham.
40
CATd Land at 58, Chaldon
Common Road.
40
CATe Land at Mount Avenue. 30 Site specific requirements to be provided as set out in
planning permission reference 2025/771.
CATf Highwood, 55 Rook
Lane, Chaldon, Surrey.
30
CATg 148 Salmons Lane,
Caterham.
20
CATh Dormers, Foxon Lane,
Caterham.
20
OHLa Tandridge District
Council offices, Health
Centre and library.
45 Mixed use development comprising around 45
dwellings and health hub, library and other supporting
community facilities.
Ref: Site Address Dwellings Site specific requirements
OHLb Former Brickworks &
Land to the West of
Red Lane, Hurst Green,
Oxted.
90 Development of the site must be brought forward as
a comprehensive and coordinated scheme. Proposals
must:
Be supported by a masterplan demonstrating how
the allocation will be developed in an integrated
manner, including access, movement, landscaping,
drainage, open space and infrastructure
requirements.
Provide safe and suitable access arrangements and
mitigate the impacts of development on Red Lane
and the surrounding highway network, including
any measures necessary to address capacity, traffic,
highway safety and sustainable movement.
Provide a comprehensive package of walking,
wheeling, cycling and public transport
improvements to reduce reliance on the private car
and improve connectivity with Hurst Green, Oxted
and surrounding facilities.
Incorporate a substantial landscape buffer along
the northern, eastern and southern boundaries
of the site, designed to soften the visual impact
of development, provide a clear and defensible
long-term settlement edge and maintain the
relationship between the settlement and the
surrounding countryside and ensure that green
infrastructure, landscaping and boundary
treatments are delivered as an integral part of the
development and maintained in perpetuity.
OHLc Land off Holland Road,
Hurst Green.
60 To retain Diamond Business Centre.
OHLd Land off Hurst Green
Road, Hurst Green.
40
OHLe Perrysfield Farm, Gibbs
Brook Lane.
29 Site specific requirements to be provided as set out in
planning permission reference 2023/1249.
OHLf Methodist church site,
Hurstlands, Hurst Green.
10
OHLg Stables, Red Lane
Farm, Red Lane.
12 Site specific requirements to be provided as set out in
planning permission reference 2025/58.
WARa Former Shelton Sports
Club, Shelton Avenue
and Land Adjacent
to 267 Hillbury Road,
Warlingham.
150 Site specific requirements to be provided as set out in
planning permission reference 2022/267.
WARb Greenacre Sports
and Social Club,
Warlingham.
150
Ref: Site Address Dwellings Site specific requirements
WARc Land between Greenhill
Lane and Chelsham
Road, Warlingham.
50 Development must avoid adverse effects on
skylark populations and their supporting habitat.
Proposals must be informed by up-to-date ecological
assessment and provide appropriate avoidance,
mitigation and, where necessary, compensation
measures. Development should retain and enhance
suitable habitat wherever practicable and secure the
long-term management of any mitigation measures
required to maintain or improve the conservation
status of skylarks within and adjoining the site.
WARd 1 Park Lane,
Warlingham.
45 Site specific requirements to be provided as set out in
planning permission reference 2024/1393
WARe Land at Galloway
Lodge, High Lane,
Warlingham.
30 Development to be contained in the north western
section only to achieve a rounding off of the
settlement. The remainder of the site to be used for
open space and new landscape planting to create a
new permanent edge to the settlement.
Development must provide or contribute towards
a package of transport and highway mitigation
measures proportionate to its impacts. Proposals
must demonstrate that traffic generated by the
development can be safely and satisfactorily
accommodated on the local highway network and
must deliver any improvements necessary to address
the cumulative impacts of development on the
constrained access route serving the site.
WARf 3 Stuart Road,
Warlingham.
14
WARg 79 Farleigh Road,
Warlingham.
13 Site specific requirements to be provided as set out in
planning permission reference 2023/1385.
WARh Land at Highlands
Farm, Warlingham.
10
WHYa Former Gasworks, Land
at Godstone Road,
Whyteleafe.
150
WHYb Land North of
Burntwood Lane,
Caterham.
40 To include a significant landscape buffer on its western
edge to maintain the wildlife corridor between
Caterham and Whyteleafe.
Ref: Site Address Dwellings Site specific requirements
GDSa Land West of Godstone. 220 Development must contribute towards a coordinated
package of transport and healthcare infrastructure
necessary to support the cumulative growth proposed
within Godstone. Proposals must:
Provide or contribute towards transport
mitigation measures identified through the Local
Plan evidence base and subsequent transport
assessment work, including measures necessary
to address the cumulative impacts of development
on Junction 6 of the M25 and the surrounding local
highway network.
Demonstrate that the cumulative transport impacts
of development can be satisfactorily mitigated
and that the residual impacts on the operation and
safety of the highway network would not be severe.
Provide or contribute towards improvements to
walking, wheeling, cycling and public transport
infrastructure serving Godstone and surrounding
settlements.
Secure safe and attractive connections between
the site, the village centre, schools, healthcare
facilities, public transport and other local services.
Provide or contribute towards the delivery of a
new medical facility serving Godstone, or such
alternative healthcare provision as is identified
through the Infrastructure Delivery Plan and agreed
with the NHS and Local Planning Authority.
Ensure that necessary transport and healthcare
infrastructure is delivered in step with development
through appropriate phasing arrangements and
planning obligations.
Development to include significant landscape
buffer to preserve the integrity and status of the
National Landscape.
GDSb Land at Godstone
Hotel, High Street,
Godstone.
50 As GDSa
GDSc Land to the West of
High Street, Godstone.
20 As GDSa
GDSd Land north of Love
Lane, Godstone Farm,
Godstone.
10 As GDSa
LINa Land South West
of Newchapel Road
Lingfield.
210 The development must provide or contribute towards
the delivery of a safe, convenient and attractive
pedestrian and wheeling connection between the site
and Lingfield railway station, including safeguarding
any land necessary to facilitate its future delivery.
LINb Land on west side
of Godstone Road,
Lingfield.
120
Ref: Site Address Dwellings Site specific requirements
LINc Lingfield House.
East Grinstead Road,
Lingfield.
107 The development must provide a new medical facility
for Lingfield within the site allocation and all other site
specific requirements agreed in planning permission
2024/1079.
LINd Land at Garth Farm,
Lingfield.
60
SMFa Land to the west
of Chapel Road,
Smallfield.
270 Site specific requirements to be provided as set out in
planning permission reference 2023/1464.
SMFb Land to the east of
Plough Road.
120 Site specific requirements to be provided as set out in
planning permission reference 2022/1658.
SMFc May Cottage &
Adjacent Land,
Redehall Road,
Smallfield.
120 Site specific requirements to be provided as set out in
outline planning permission reference 2025/292 for
80 dwellings. The remaining part of the allocation will
deliver an additional 40 dwellings.
SMFd Land at Rede Cottage,
51 and 57 Redehall
Road, Smallfield.
105 Site specific requirements to be provided as set out
in outline planning permission reference 2024/1389
for 85 dwellings. The remaining part of the allocation
will deliver an additional 20 dwellings on land outside
flood areas.
SMFe Saconnex Farm,
69 Redehall Road,
Smallfield.
60
SMFf 46 Redehall Road,
Smallfield.
30
SMFg Land adj to Bridgeham
Farm, Broadbridge
Lane, Smallfield.
23
BURa Land east of and
including Hollybush
Business Centre,
Shipley Bridge Lane,
Copthorne, West
Sussex.
240 Retention of the existing business centre
BURb Land north of Oaks
Farm, Shipley Bridge
Lane, Copthorne.
100
BURc Land to the West of
West Park Road.
60
BLEa Land to the east
of Outwood Lane,
Bletchingley.
70 Development to include significant landscape buffer
to preserve the setting of the National Landscape and
proposed extension area.
BLEb Court Lodge Farm,
Church Lane,
Bletchingley.
50
BLEc Bletchingley Centre,
Stytchens Lane,
Bletchingley.
20
BLEd Castle Hill, Castle
Street, Bletchingley.
40 Development must include significant landscape
buffer to adjacent scheduled monument.
Ref: Site Address Dwellings Site specific requirements
BLHa Land adjacent to Blue
Anchor Farm, Blindley
Heath.
70
DORa Westwood, High Street,
Dormansland.
10
DORb Cromlech, Felcourt
Road, East Grinstead.
10
FELa Felbridge Showground,
Copthorne Road,
Felbridge, East
Grinstead.
230 Development must be supported by a comprehensive
package of transport mitigation and sustainable
transport measures. Proposals must:
Provide or contribute towards improvements to
Star Junction sufficient to mitigate the impacts
of the development and maintain the safe and
efficient operation of the local highway network.
Demonstrate, through an appropriate Transport
Assessment and associated modelling, that the
cumulative transport impacts of the development
can be satisfactorily accommodated.
Provide or contribute towards improvements
to pedestrian, cycling and public transport
infrastructure serving Felbridge and nearby
settlements.
Secure safe and attractive walking, wheeling
and cycling connections between the site, local
services, schools, public transport and employment
destinations.
Support opportunities to reduce reliance on private
car travel, including through public transport
enhancements, travel planning measures and
appropriate provision for cycling and other
sustainable modes.
Be phased to ensure that necessary transport
mitigation and infrastructure is delivered in step
with development.
FELb Land north of Crawley
Down Road, Felbridge
45 As FELa
FELc Land between The
Laurels and Oakview,
Felbridge
10 As FELa
TATa Land to the south
of Lusted Hall Lane,
Tatsfield.
40 Development to be located at the northern part of
the site with the southern area safeguarded for water
management, green infrastructure and creation of
landscape buffer to create new permanent Green Belt
boundary.
50% of the site must be delivered as affordable
housing delivered subject to a local connection
cascade giving priority, in the first instance, to eligible
households with a local connection to Tatsfield village.
Ref: Site Address Dwellings Site specific requirements
TATb Land parcel south
of Approach Road,
Tatsfield.
12 50% of the site must be delivered as affordable
housing delivered subject to a local connection
cascade giving priority, in the first instance, to eligible
households with a local connection to Tatsfield village.
TATc Development Site
South of Ship Hill
House, Ship Hill,
Tatsfield, Westerham,
Surrey.
84 The development shall provide robust and permanent
landscape buffer areas along the eastern and western
boundaries of the site. In addition, substantial
areas of open space will be incorporated within the
development to serve future occupiers. All landscape
buffers and open space areas shall be secured and
protected in perpetuity through a Section 106
Agreement.
NUTa Nutfield Green Park,
Former Laporte Works
Site, Nutfield Road.
250 homes
in total
comprising:
166
dwellings,
8 self build
and care
home.
Significant provision of open space and parkland as
set out in approved application 2023/1281 including
agreed transport mitigation package.
TAN0a Tandridge Lane,
Tandridge Village.
20 Development will only be brought forward as enabling
development to secure the long-term retention,
improvement and enhancement of Tandridge Village
School.
Employment site allocations
15.22 The Local Plan also identifies land to support economic development and provide a choice of locations
capable of accommodating a range of employment activities over the Plan period. The employment
allocation portfolio complements the protection and intensification of established employment areas and is
intended to help address the identified quantitative and qualitative need for additional employment land in
the district.
15.23 The HEDNA identifies a total employment land need of approximately 21.4 hectares. This comprises 15.0
hectares of net employment land need and 6.4 hectares of replacement demand. By use class, the identified
requirement comprises approximately 10.3 hectares for E(g)(i–ii), 4.5 hectares for E(g)(iii)/B2 and 6.6
hectares for B8.
15.24 The committed employment land pipeline is limited, at approximately 0.6 hectares. When assessed against
the identified requirement of 21.4 hectares, this results in a residual quantitative need of approximately 20.8
hectares. The employment allocations are intended to increase the choice and flexibility of land available to
support economic development along with the retention, intensification and qualitative improvement of
established employment locations.
15.25 The total net opportunity area of the sites identified in Table ALL3 is approximately 17.8 hectares. When
this is combined with an anticipated windfall employment allowance of 3ha over the plan period (0.2 ha
each year), this amounts to a total of 20.8 hectares, which is expected to meet the identified employment
land requirements over the plan period to 2042. The net opportunity areas are estimated based on available
information and may be subject to change when sites come forward for redevelopment and intensification.
Several sites contain existing development, previously developed land or areas which may be required for
access, landscaping, drainage, biodiversity, infrastructure or other mitigation. The employment supply
position must be assessed based on the net additional developable employment land and floorspace capable
of being delivered by the allocations.
15.26 The evidence identifies a constrained employment land market in the district. Industrial and B8
accommodation is characterised by limited vacancy and market choice, while future office demand is
expected to be focused principally on smaller, flexible and high-quality premises serving local businesses
rather than large-format office development. The allocation portfolio should provide sufficient flexibility to
respond to changing market requirements while ensuring land required to meet employment needs is not
progressively lost to higher-value alternative uses.
15.27 A flexible approach to the precise mix of employment uses is appropriate because the form and nature of
demand will evolve over the Plan period. Flexibility should not result in the loss of the principal employment
function of allocated sites. Detailed proposals should demonstrate how the development contributes
towards meeting identified employment needs and makes efficient use of available land having regard to
the suitability of the location for different forms of employment activity.
15.28 Site-specific development requirements will establish the appropriate form and intensity of employment
development together with access, landscape, Green Belt, biodiversity, drainage, environmental and
infrastructure requirements. They should also identify, where sufficiently evidenced, the net additional
employment land or floorspace expected from individual allocations. This will allow the contribution of
the allocation portfolio towards the identified employment land requirement to be demonstrated and
monitored transparently.