← Open Consultation: all consultations

South Warwickshire Plan Explorer

Search the South Warwickshire Local Plan. 543 pages, made findable.

The consultation closes at 11:59pm, Sunday 6 September 2026.

OpenConsult / South Warwickshire Plan Explorer

Wellesbourne

9 sections of the plan, in document order.

The human version (we wrote this, not the council)This section sets out the full policy and justification for meeting development needs to 2050. Provision is made for a minimum of 54,925 homes between 2025 and 2050, with a total identified supply of 57,610, a headroom of about 4.9%. It also provides 129 Gypsy and Traveller pitches, 20 Travelling Showpeople plots and 35 boat dweller moorings. Each district will maintain its own five-year housing land supply, based on 1,112 homes a year in Stratford-on-Avon and 1,085 in Warwick, with detailed year-by-year delivery trajectories for every allocated site.

The human version (we wrote this, not the council)This policy allocates housing sites at local growth locations, each with an indicative minimum capacity and site-specific requirements. The extract covers Alcester and Barford: 286 homes south of Allimore Lane, avoiding Flood Zones 2 and 3; 79 homes north of Captains Hill on grey belt land (lower-performing Green Belt land that national policy may allow for development); 34 homes south of Westham Lane; and 122 homes east of Wellesbourne Road, where nearby minerals workings require a sensitive layout.

The human version (we wrote this, not the council)This section details all eight Major Investment Sites under Policy DS.10. They are the Gaydon automotive hub, the Long Marston Rail Innovation Centre, land south of Coventry including the former Coventry Airport, where a gigafactory or wider advanced manufacturing is planned alongside a 90 hectare country park at Gateway South, Stoneleigh Park with around 5.4 hectares of extra employment land, 62 hectares at the University of Warwick Main Campus, the university's Wellesbourne Campus, Wellesbourne Airfield, where up to 65 hectares of employment land depends on relocating the runway, and Fen End for automotive and motorsport uses.

The human version (we wrote this, not the council)This section lists the full set of protected transport schemes and explains the approach. Alongside rail, park and ride and strategic road junction schemes, it safeguards major link roads tied to specific development sites, including routes at Stratford-upon-Avon, Wellesbourne, Henley-in-Arden, Kenilworth, Warwick, Stoneleigh and Bidford, and a new consolidated M40 junction to replace Junctions 13 and 14. Development in these areas is only permitted where it would not hinder a scheme's design, delivery or operation, or is temporary or reversible. The aim is to prevent prejudicial development without needlessly sterilising land.

The human version (we wrote this, not the council)This section covers proposal BIT.2 at Red House Farm, south-west of Bishop's Tachbrook. The 160-hectare site provides around 121 hectares of strategic employment land, totalling 3,750,000 sq ft of floorspace mainly for logistics and industry. The developer will fund a new M40 junction to replace junctions 13 and 14, plus a dual carriageway link road to Warwick and Leamington. The scheme also includes a Park and Ride, a central mixed-use hub, 39 hectares of green and blue infrastructure, and a travelling showpersons yard of at least 6 plots. Delivery runs from 2027 to 2034/35.

The human version (we wrote this, not the council)This section covers proposal GAY.1, a 588-hectare employment allocation at Gaydon next to the Jaguar Land Rover and Aston Martin Lagonda sites. It provides about 157 hectares of strategic employment land and 81 hectares of non-strategic land, focused on automotive manufacturing. At least 50% of floorspace on the main site must be industrial or research uses, with warehousing capped at 50%. It includes 51 hectares for JLR expansion, 7.5 hectares for AML, 73.5 hectares of testing tracks, and a travelling showpersons yard of at least 8 plots.

The human version (we wrote this, not the council)This section sets out proposal WEL.1, land north of Wellesbourne. The 129-hectare allocation delivers at least 1,331 homes on 97 hectares between 2033 and 2042, plus 9 Gypsy and Traveller pitches, a two-form entry primary school, a local centre possibly including a health facility, and a sports pavilion. It also allocates 47.5 hectares (27 net) of employment land, mainly research and office use, at the University of Warwick's Wellesbourne Campus, with building heights ranging from one to four storeys across defined character areas. The setting of Charlecote Park must be protected.

The human version (we wrote this, not the council)This section presents the Stratford-upon-Avon Gateway Masterplan in drawing form. It consists of two figures: one showing land use and urban form principles for the Gateway site, and another showing the height and massing principles that new buildings there should follow. The detail sits in the plan drawings themselves rather than in written policy text.

The human version (we wrote this, not the council)This section presents the masterplan for the University of Warwick's Wellesbourne Campus in drawing form. It contains a concept masterplan figure and a character areas figure, which together show how the campus is expected to develop and how different parts of the site are intended to vary in use and form. The detail sits in the drawings rather than in written policy text.

← Back to the plan search

Have your say

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. Open the official response portal
  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Warwick district, or not sure of your ward? Find your councillor →

Deadline: 11:59pm, Tuesday 8 September 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.