← Open Consultation: all consultations

Solihull Plan Explorer

Search the Solihull Draft Submission Plan. 183 pages, made findable.

The consultation closes at 11:59pm, Friday 11 December 2026.

OpenConsult / Solihull plan / SMBC/BC3

Site allocation SMBC/BC3

Windmill Lane/Kenilworth Road

On pages 118 to 120 of the official PDF.

The human version

This site allocation is for 132 dwellings at Windmill Lane/Kenilworth Road in Balsall Common. Housing should be low density, with single storey homes where relevant, to protect the setting and working of Berkswell Windmill. The site needs public open space, play areas, retained trees and hedgerows, above ground SuDS and 5% of open market homes as self and custom build plots. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The site was once proposed for 200 dwellings, but this was cut to protect ecology and the Grade II* Berkswell Windmill, and the southern part was excluded.

An unofficial plain English summary. The official wording below is what counts at examination; check it before you rely on anything here.

Open PDF at p. 118

What the plan says

The text below is extracted automatically from the official PDF and may contain artefacts; the PDF is authoritative.

Policy SMBC/BC3: Windmill Lane/Kenilworth Road 1. The site is allocated for 132 dwellings 2. Development of the site should include: A Provision of low-density housing, and where relevant single storey housing, to protect the setting and functionality of Berkswell Windmill. 45 Planning application reference 2023/02214. 46 The wider allocation has come forward in two parts, namely the larger Pheasant Oak Farm area (applications 2023/02214 and 2026/00479 for 250 dwellings) and a smaller part of the site in the NW corner known as Catchams’ Corner (applications 2023/02281 and 2025/01422 for 17 dwellings). 47 Planning application reference 2021/01360 48 Planning application reference 2025/00092. B Provision of public open space and a range of play areas for children and young people in accordance with the Open Space Assessment and future revisions. C Enhancement of public rights of way through the site as a pedestrian route and key green infrastructure link. D Trees and hedgerows along to be retained. E 5% of open market dwellings to be provided in the form of Self and Custom Build Plots in accordance with Policy SMBC/HO4. F Provision of above ground SuDS features. 3. Likely infrastructure requirements will include: A Developer contributions to education provision. B Developer contributions to primary and secondary care health services in conjunction with Birmingham and Solihull Integrated Care Board (BSOL ICB). C A proportionate contribution towards the Balsall Common Multi Modal Package (incorporating the Balsall Common Relief Road) calculated in accordance with the Council’s March 2025 Position Statement. D Appropriate measures to promote and enhance sustainable modes of transport including pedestrian and cycle connectivity towards Berkswell rail station, Balsall Common centre and Balsall Common health centre. E Avoidance of flood risk areas to north –west of site and potential for flood alleviation measures to benefit the wider area; F Financial contribution to provision of new playing pitches and contributions to enhancement of existing recreational facilities, to accord with the requirements identified in the Playing Pitch Mitigation Strategy. 520. This site is bounded by the settlement edge to the north and Kenilworth Road and Windmill Lane as far south as the existing development allocated in the SLP 2013. In the Draft Local Plan and Supplementary Consultation undertaken for the 2020 plan, this site was proposed for 200 dwellings. Evidence has indicated that this level of development would have a significant adverse impact on the ecological quality of the site and the setting of the adjacent heritage asset, Berkswell Windmill. As a result, the capacity has been significantly reduced and the southern part of the site excluded from development. 521. Although the site is located a greater distance from the centre of the settlement than others, this did not prevent the SLP Inspector concluding that the area was not so remote that it would justify the omission of the two sites in this parcel brought forw ard under the SLP 2013. The proposed allocation now extends no further south than the existing housing. 522. In Green Belt terms the parcel performs moderately. At least in part this is due to the development and encroachment that has already taken place in the parcel. The site is located in an area with low capacity to accommodate change in the Landscape Character Assessment, 2016. 523. The Heritage Impact Assessment49 for Site BC3 identifies potential harm to the setting of the Grade II* Berkswell Windmill and recommends mitigation by leaving undeveloped the paddocks adjacent Windmill Lane and any areas where development would adversely affect the functionality of the Windmill or the view cone from the south -west. Evidence from the Berkswell Mill Wind Flow Study 2019 indicates that the parts of the site closest to the Windmill would be subject to significant height constraints. Excluding the southern part of the site, protecting areas of ecological value and restricting the height of d evelopment where necessary elsewhere will ensure that the development does not result in harm.
Homes & housingSite allocationsTransport & travel📍 Balsall Common📍 Berkswell📍 Solihull
← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.