The human version (we wrote this, not the council)This section introduces the new Solihull Local Plan. It notes that two thirds of the Borough is in the Green Belt, including the Meriden Gap that separates Solihull and the Birmingham conurbation from Coventry. The current plan was adopted in December 2013 and covers 2011 to 2028, but is now seen as largely out of date. A 2020 Draft Submission Plan was withdrawn in October 2024 after a long examination. This plan replaces the 2013 plan and the 2014 Gypsy and Traveller Site Allocations DPD. Without a plan, the Council could not show a 5-year land supply. Five neighbourhood plans have been made and remain part of the development plan.

The human version (we wrote this, not the council)This section describes the Borough. Solihull sits on the southern edge of the West Midlands conurbation, between Birmingham and the Black Country to the west and Coventry to the east. Its motto is "Urbs in Rure", or town in country. It has strong transport links, including the M42 and Birmingham Airport. The section outlines how towns and villages grew over time. In 2023 the population was 218,793. The economy supports around 145,000 jobs and produces goods and services worth £10.72 (bn). Around two thirds of the Borough's 17,800 hectares is countryside and Green Belt. However, 41% of North Solihull residents live in the 10% most deprived areas of England.

Policy SMBC/HO2

Broad Locations

pp. 28–37

The human version (we wrote this, not the council)This policy covers broad locations for development shown on the Policies Map. Proposals there will be supported in principle if they fit the spatial strategy, take a joined-up approach, provide or fund infrastructure and deal with environmental harm. Broad locations are not site allocations, and adopting the plan does not remove their Green Belt status. Boundaries will change only through a later local plan, a neighbourhood plan or a Supplementary Plan. The section also sets Local Housing Need at 1,289 dwellings per annum, or 21,913 over the plan period, against a supply of 23,091. Broad locations add 8,219 homes, including land within 1,000m of railway stations.

The human version (we wrote this, not the council)This policy names seven villages in the Green Belt where limited infilling may be treated as not inappropriate under NDMP GB7 (1)(c): Chadwick End, Barston, Berkswell, Bickenhill, Eastcote, Illshaw Heath and Temple Balsall. Limited infilling means filling a small gap in an otherwise built-up frontage with not more than two dwellings. The supporting text explains that many sites from the withdrawn 2020 plan, which proposed some 574ha of Green Belt release, now have planning permission. To avoid illogical boundaries, the Green Belt will be redrawn to exclude sites with permission. The text also introduces the Green Belt Village Study, published in July 2026.

The human version (we wrote this, not the council)This section sets out why the historic environment matters to the Borough's character and civic pride. It lists features that add most to local character, including the historic core of Solihull Town Centre, the Mature Suburbs, the Arden landscape and historic villages such as Berkswell, Barston and Temple Balsall, and the canal and railway network. The Council's strategy is to sustain and enhance heritage assets and tackle risks from neglect and decay. It will keep a Local Heritage List, Conservation Area Appraisals and Management Plans, and a public Historic Environment Record. National policies HE4 to HE10 provide the basis for judging applications.

The human version (we wrote this, not the council)This section describes Balsall Common and how it should grow. The town has around 7,000 people in some 2,900 households. It has secondary and primary schools, health services and shops, so it is well placed for growth beyond its own needs. Planned infrastructure includes the Balsall Common Relief Road in three phases, an enhanced centre, station parking, a new two form entry primary school at Barratt’s Farm and a sports hub. The Green Belt boundary will be amended, mainly using the west coast main line and HS2. Decisions include up to 970 dwellings at Barratt’s Farm and up to 110 at Frog Lane.

The human version (we wrote this, not the council)This site allocation is for 132 dwellings at Windmill Lane/Kenilworth Road in Balsall Common. Housing should be low density, with single storey homes where relevant, to protect the setting and working of Berkswell Windmill. The site needs public open space, play areas, retained trees and hedgerows, above ground SuDS and 5% of open market homes as self and custom build plots. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The site was once proposed for 200 dwellings, but this was cut to protect ecology and the Grade II* Berkswell Windmill, and the southern part was excluded.

Policy SMBC/BC5

Trevallion Stud

pp. 120–121

The human version (we wrote this, not the council)This site allocation is for 310 dwellings at Trevallion Stud in Balsall Common. It covers the stud farm and some nearby parcels, much of which is previously developed land. The area bounded by Kenilworth Road and Wootton Green Lane would be removed from the Green Belt. Development should include public open space, play areas, retained trees and hedgerows, above ground SuDS and 5% of open market homes as self and custom build plots. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. Walking and cycling links towards Berkswell rail station and Balsall Common centre should be improved.

The human version (we wrote this, not the council)This site allocation is for 92 dwellings at Lavender Hall Farm in Balsall Common. It covers previously developed land behind the farm, north-west of the fishing lakes. Development should include public open space, play areas, retained trees and hedgerows, easy walking and cycling access to the rail station, and above ground SuDS. It should also protect the setting of nearby heritage assets and provide a buffer between new homes and both the existing railway line and HS2. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The HS2 line will separate the site from the wider Green Belt.

The human version (we wrote this, not the council)This site allocation is for 65 dwellings at Hallmeadow Road/Riddings Hill in Balsall Common. The site was allocated in the Solihull Local Plan (2013), and the Green Belt boundary was changed then, so no policy changes are needed to bring it forward. Development should include public open space, play areas and above ground SuDS. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The Council owns the site and is seeking to sell it to a housing developer. The text then lists four broad locations for growth, BC8 to BC11.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    In the portal, open the chapter or policy you want to comment on and press Comment on that item. There is no single box for the whole plan, and you will need to create an account first.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Friday 11 December 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.